Why: Preserve actual component merge results and current delivery authorization before integration CI.
Evidence: RDM PR 360 merged at exact successful CI head; new Dev make test passed and independent metadata checks preserved approved digests and pins.
Impact: Clarify historical task records and current approved repair scope; preserve documentation and delivery evidence only.
Refs: Documents PRs 98 and 99; RDM PRs 360 and 362; IAM I1 task record.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=1e5c6b9c10ba77ed34663fd670138621a17342bd.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Carry the actual merged contract and approved permission implementation boundary into the integration composition.
Evidence: Documents PR 99 merged as a7ff466d9ae91fc67a53d2bf4991f47fc63a2a4c after independent review and verified source digest; RDM PR 360 preserves actual-actor projection semantics.
Impact: Update documentation pin, navigation and delivery records only; new composition tests and final-head CI remain required.
Refs: IAM I1 permission contract section 8; Documents PRs 98 and 99; RDM PR 360.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Record user acceptance and use the actual merged permission contract in the integration composition.
Evidence: Documents PR 98 merged as 3cf263962bd106529ee0531c8415cb16eecedfe3; independent document review and full SELF receipts retained in the task record.
Impact: Advance only Documents and delivery evidence; full IAM later increments and deployment remain outside scope.
Refs: Documents PR 98; IAM I1 U1-U2; policy/delivery.md stages 8-9.
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-rdm-increment-settings-duties.md(PR#529) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-d1-closeout-evidence.md(PR#517) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5aae47ebca20ad1f3add3b080212cca7e1c6edf9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Preserve the user-approved stage-7 conclusion before the final merge candidate is frozen.
Evidence: Import original precheck, sync, build, CI and independent replay receipts; validate current fixed components, document links and the incoming acceptance script syntax through make evidence.
Impact: Update this task card only; preserve implementation and activation boundaries. New HEAD CI remains required before merge.
Refs: Dev PR #519; Guidelines PR #5; Documents PR #96; queue Issue #518
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5aae47ebca20ad1f3add3b080212cca7e1c6edf9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=69c5c84d8a2f1a7966ebfb809cbb26d54e8e8abb.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=69c5c84d8a2f1a7966ebfb809cbb26d54e8e8abb.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Final fixed Documents composition and current modules passed their checks and now require the user acceptance decision.
Evidence: Complete SELF make test and document checks passed at4af5956; receipt5e81c91e and the independent RDM replay subjects are retained.
Impact: Record-only checkpoint after user stage 6 approval; do not claim stage 7 approval or shipping.
Refs: I1 bounded acceptance; policy/delivery.md
Why: Keep complete archive verification after the active card is moved.
Evidence: Original SELF synchronization and scoped diff receipts confirm no product or unrelated card changes.
Impact: Task records only.
Refs: Dev #526; RDM #354
Why: The approved base and downstream project membership delivery has reached its merge endpoint.
Evidence: Dev #526 and RDM #354 actual merge records, exact-head gates and independent reviews are preserved with original source labels.
Impact: Archive this task and record the separately authorized deployment follow-up; no product change, worktree cleanup or 8788 write.
Refs: Dev #526; RDM #354
Why: Keep the user-approved implementation and pending acceptance separate in the fixed integration records.
Evidence: Current Dev make test passed at10789653 and RDM combined checks passed at70e27b08; final text-only combination is verified next.
Impact: Documents and card records only; no permission source, pins in RDM, existing services or production data changes.
Refs: I1 stage 7 acceptance candidate
Why: task-sync flagged the earlier rows as recorded with uncommitted script
changes; the gate requires key checks re-run at a committed head.
Evidence: SELF row via make evidence - 25/25 PASS on a fresh rdm@84ca64f
disposable instance.
Impact: task card only.
Refs: task feature/rdm-increment-settings-duties.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=ee9b437b22b49f96e1bc65f79417b22e8e82a37c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: with the four-repo v0.4.0 release live, the account.list query/name
passthrough (RDM #356) enables the deferred full assertion of scenario 2; the
harness also needed v0.4.0 adaptations discovered on the combo instance.
Evidence: tool-written rows on the card - full ten-scenario run on a disposable
rdm@84ca64f combo instance (25/25 PASS incl. 2b name-substring, 2c
case-insensitive owner filter, 2d limit truncation), and dev service status
(rdm@84ca64f running against the live dev database, auth gate 401).
Harness fixes: rdm.project.member.setRole renamed to set-role (RDM #350);
command envelope parsed via payload; re-login after the password gate (base
#195 revokes sessions on password change); RDM world provisioning via
rdm.project.create + bind with the domain admin self-removing so owner2 is the
sole owner (creator is seeded as owner); scenario 8b asserts allow:true in the
current response shape; scenario 10b now meaningful (base #195 admits member
conversations through RDM project membership).
Impact: integration script and task card only; no product code.
Refs: task feature/rdm-increment-settings-duties; RDM #356; base v0.4.0 tags.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=ee9b437b22b49f96e1bc65f79417b22e8e82a37c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The approved document dependencies have been reviewed and merged. Their actual immutable merge commits must be fixed before final host validation, while operational activation remains a separate gate.
Evidence: Independent document replay and verified PR merges are recorded in the task card. The staged host combination passed make test with actual merged child pointers; final commit build/CI remains pending and will be recorded outside source.
Impact: Advance only the two reviewed merged child pins, expose the real plan path, and record partial stage-seven approval and pending activation. Preserve current main components and existing admission/owner boundaries.
Refs: Guidelines PR #5 (2f5b198); Documents PR #96 (129cc35); Dev PR #519; implementation plan U4-U6; Issue #518
Why: Preserve the human stage 6 approval separately from the synchronized formal test candidate.
Evidence: Original reviewed objects and the user approval are recorded; startup recovery and synchronization outputs are captured as complete SELF receipts.
Impact: Advance approval records only, retain all upstream membership records and enter planned I1 API/command verification. No production operations or later increments started.
Refs: User approval; policy/delivery.md stage 6 to 7
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=ee9b437b22b49f96e1bc65f79417b22e8e82a37c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Continue the approved downstream delivery after owner-published tags.
Evidence: RDM formal tag test is captured by its evidence wrapper; PR #354 is under final review and CI.
Impact: Task continuity only; preserve unrelated active cards and all worktrees.
Refs: Dev #526; RDM #354
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=ee9b437b22b49f96e1bc65f79417b22e8e82a37c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=20e086e48b9cec7f300feba5342db7a0661a4d4e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The resumed task requires a fresh baseline before recording the approved implementation and formal checks.
Evidence: Startup identified SYNC_REQUIRED; Documents pointer conflict was resolved by merging the referenced upstream commit while preserving all three approved I1 documents byte-for-byte.
Impact: Workspace recovery only; retain incoming project-membership records and the fixed I1 approval objects. Formal checks remain pending.
Refs: User approval of I1 implementation; policy/governance.md startup and recovery
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=20e086e48b9cec7f300feba5342db7a0661a4d4e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Backend #195 and Frontend #82 (parallel task feature/project-member-access)
merged after the original targets (Backend 15566f9 / Frontend c294835), and Dev
main 20e086e pins exactly those new heads (5d5fc989/eb2d6d32). Tagging the stale
SHAs would make RDM pins->v0.4.0 a downgrade versus Dev main, so the release must
land on current main HEADs; the checkout origin/main command already does this.
Evidence: SELF rows on the card - four-repo ls-remote (main HEADs recorded, all
v0.4.0 tag refs empty), git ls-tree origin/main pins, and 15566f9../42cda9c0..
commit ranges showing the parallel merges.
Impact: Dev task card release-plan section only; no code or pins change.
Refs: task feature/rdm-increment-settings-duties; related Backend #195,
Frontend #82, Dev #527.