Commit Graph
1139 Commits
Author SHA1 Message Date
weichen 2d12865aae Record the task card for feature-agent-stack-n2
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-agent-stack-n2.md; R0=878e0e7ceba3bb6b78c36c5113eacc846a7f017b.

Impact: task metadata only; the feature workspace starts at 878e0e7ceb.

Refs: .task/feature-agent-stack-n2.md
2026-10-07 12:12:34 +00:00
weichen 878e0e7ceb Merge pull request 'Close the merged I2 task card (feature/agent-stack-i2)' (#243) from feature/card-close-20261007-115847Z into main
ci / test (push) Successful in 2m35s
Close the merged I2 task card (feature/agent-stack-i2)
2026-10-07 12:02:56 +00:00
weichen c02f02a77a Close 1 merged task card(s) and archive them
ci / test (pull_request) Successful in 2m15s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-agent-stack-i2.md(PR#242) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-07 11:58:47 +00:00
weichen d308ed6619 Merge pull request 'Take the backend intent slow lane and the I2 port pins (I2 WP3)' (#242) from feature/agent-stack-i2 into main
ci / test (push) Successful in 2m17s
Take the backend intent slow lane and the I2 port pins (I2 WP3)
2026-10-07 11:58:01 +00:00
weichen 733f3c7474 Repin the component stack at the CWD-clean convergence
ci / test (pull_request) Successful in 2m33s
Why: native ead690be (Agent-Native#24) stops workspace-less requests
from writing session state into the process CWD; squad 029edc08
(Agent-Squad#28) and backend 68addfda (Backend#85) carry it. Without
this the CI build step fails the worktree check after make test.
Evidence: check-pins pins ok; combination re-verified by make test
before push (see card).
Impact: none beyond pins; the I2 slow-lane stack is unchanged.
Refs: Agent-Native#24, Agent-Squad#28, Agent-System-Backend#85, Dev#242
2026-10-07 11:52:44 +00:00
weichen 43f61b0862 Record the passing make test evidence row
ci / test (pull_request) Failing after 2m0s
Why: completion-declaration test segment per AGENTS.md (CI remains the
authoritative test source on the PR).
Evidence: row exit=0 in the card evidence table.
Impact: none.
Refs: I2 closure
2026-10-07 11:40:24 +00:00
weichen ac553897ca Record the successful task-sync evidence row
Why: pre-review gate segment per AGENTS.md evidence discipline.
Evidence: row in card (sync_base=11eea9530d tested_head=ad7c2f2443).
Impact: none.
Refs: I2 closure
2026-10-07 11:39:12 +00:00
weichen 0507c68543 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=11eea9530d89adaffb426196f17f57069d045974; candidate=ad7c2f24438acba96f9ef656a0d164284b3f943b.

Impact: task metadata only.

Refs: .task/feature-agent-stack-i2.md
2026-10-07 11:38:45 +00:00
weichen ad7c2f2443 Record the failed task-sync evidence row (dirty tree)
Why: evidence discipline records attempts as-is; the follow-up commit
preserves the .agentx transcripts and re-runs sync.
Evidence: row exit=2 in the card evidence table.
Impact: none.
Refs: I2 closure
2026-10-07 11:38:05 +00:00
weichen a7772dca82 Record the I2 results and verification on the task card
Why: closure requires the results section filled with the acceptance
evidence map.
Evidence: R1-R4 rows reference the merged PRs and named tests.
Impact: none.
Refs: I2 closure
2026-10-07 11:37:45 +00:00
weichen 0212d2e50b Fill the I2 increments and acceptance into the task card
Why: the card was still the skeleton; increments 1-3 are merged and
need their record before closure.
Evidence: agent-intent #9/#10, Backend #83/#84, Native #23, Squad #27.
Impact: none.
Refs: I2 increments 1-3
2026-10-07 11:36:49 +00:00
weichen 2806371b52 Take the backend intent slow lane and the I2 port pins (I2 WP3)
Why: backend #83 merged the slow-lane wiring (intentsem scorer/
generator, gate SetSemantic/SetGenerator, settings flags default off);
the Dev pins and boundary rules must move with it.
Evidence: backend CI green on 9d29371; check-pins consistent
(agent-intent 343b1e6 across Dev and the backend nested copy);
lint-boundaries registers intentsem as an agent-intent adapter and the
architecture baseline gains backend/app->backend/intentsem.
Impact: product behavior unchanged by default; the two
runtime.intent* flags opt into the slow lane.
Refs: Agent-System-Backend#83, I2 increment 3
2026-10-07 11:34:52 +00:00
weichen cb6171a02c Record the task card for feature-agent-stack-i2
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-agent-stack-i2.md; R0=11eea9530d89adaffb426196f17f57069d045974.

Impact: task metadata only; the feature workspace starts at 11eea9530d.

Refs: .task/feature-agent-stack-i2.md
2026-10-07 10:47:03 +00:00
weichen 11eea9530d Merge pull request 'Close the Q1 task card' (#241) from feature/agent-stack-q1 into main
ci / test (push) Failing after 1m53s
2026-10-07 10:43:32 +00:00
weichen 7bffffe8a1 Merge origin/main into the Q1 closure branch
ci / test (pull_request) Failing after 2m1s
2026-10-07 10:43:02 +00:00
weichen f2ba460c73 Close 1 merged task card(s) and archive them
ci / test (pull_request) Failing after 1m54s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-agent-stack-q1.md(PR#240) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-07 10:39:11 +00:00
weichen 7d70086b5e Mark the Q1 task card completed for folding
Why: All seven work packages are merged and all three acceptance
clauses are verified; the close scan only folds completed cards.

Evidence: ten PRs merged across the chain; make test exit=0 at
516cdf62; all module suites green.

Impact: Task card only.
2026-10-07 10:39:11 +00:00
weichen ba36d47c2f Merge pull request 'Pin the merged SQLite convergence (Q1 WP5)' (#240) from feature/agent-stack-q1 into main
ci / test (push) Failing after 1m55s
2026-10-07 10:38:59 +00:00
weichen 1a02139026 Merge origin/main into the Q1 branch
ci / test (pull_request) Failing after 2m21s
2026-10-07 10:38:28 +00:00
weichen 7bddc5cb7e Record increment four and the Q1 verification results
ci / test (pull_request) Failing after 2m23s
Why: All seven work packages landed; the card carries the three
acceptance clauses' evidence and the follow-ups.

Evidence: CI success on the two PRs of this increment; make test
exit=0 at 516cdf62; all module suites green.

Impact: Task card only.
2026-10-07 10:35:09 +00:00
weichen b43ba1cf72 Record the SQLite-convergence pin test evidence
Why: The Dev combination passed make test; the receipt belongs to
the card.

Evidence: make test exit=0 at the amended head.

Impact: Task card only.
2026-10-07 10:34:36 +00:00
weichen 516cdf624c Pin the merged SQLite convergence
Why: Agent-Squad PR #26 and Backend PR #82 landed; Dev pins must
point at those merged component main heads.

Evidence: check-pins exit=0.

Impact: Two gitlinks.

Refs: Agent-Squad PR #26; Agent-System-Backend PR #82
2026-10-07 10:33:17 +00:00
weichen bb92690e39 Merge pull request 'Pin the merged Store and termination work (Q1 WP4/WP6/WP7)' (#239) from feature/agent-stack-q1 into main
ci / test (push) Failing after 1m54s
2026-10-07 10:08:48 +00:00
weichen 2e5d968f99 Merge origin/main into the Q1 branch
ci / test (pull_request) Failing after 1m55s
2026-10-07 10:08:17 +00:00
weichen 9c109d1a10 Record increment three on the Q1 task card
ci / test (pull_request) Failing after 1m55s
Why: WP4/WP6/WP7 landed with the three closing-out items; the
record carries the acceptance mapping.

Evidence: Agent-Squad #25 and Backend #81 merged; make test exit=0
at cc6970c7.

Impact: Task card only.
2026-10-07 10:05:16 +00:00
weichen 2683850e20 Record the Store/termination pin test evidence
Why: The Dev combination passed make test; the receipt belongs to
the card.

Evidence: make test exit=0 at the amended head.

Impact: Task card only.
2026-10-07 10:04:48 +00:00
weichen cc6970c72d Pin the merged Store and termination work
Why: Agent-Squad PR #25 and Backend PR #81 landed; Dev pins must
point at those merged component main heads.

Evidence: check-pins exit=0.

Impact: Two gitlinks.

Refs: Agent-Squad PR #25; Agent-System-Backend PR #81
2026-10-07 10:03:30 +00:00
weichen 625691f2e4 Merge pull request 'Pin the merged attempt-id recovery (Q1 WP3)' (#238) from feature/agent-stack-q1 into main
ci / test (push) Failing after 1m55s
2026-10-07 09:25:56 +00:00
weichen 082244d444 Merge origin/main into the Q1 branch
ci / test (pull_request) Failing after 1m56s
2026-10-07 09:25:25 +00:00
weichen bec26c597d Record increment two on the Q1 task card
ci / test (pull_request) Failing after 1m55s
Why: WP3 landed; the acceptance test form belongs to the record.

Evidence: Agent-Squad #24 and Backend #80 merged; make test exit=0
at 9c0fc6ae.

Impact: Task card only.
2026-10-07 09:22:25 +00:00
weichen f08abd1c2a Record the attempt-id pin test evidence
Why: The Dev combination passed make test; the receipt belongs to
the card.

Evidence: make test exit=0 at the amended head.

Impact: Task card only.
2026-10-07 09:22:00 +00:00
weichen 9c0fc6aeb1 Pin the merged attempt-id recovery
Why: Agent-Squad PR #24 and Backend PR #80 landed; Dev pins must
point at those merged component main heads.

Evidence: check-pins exit=0.

Impact: Two gitlinks.

Refs: Agent-Squad PR #24; Agent-System-Backend PR #80
2026-10-07 09:20:42 +00:00
weichen 3bf2441b05 Merge pull request 'Pin the merged superstep engine (Q1 WP1/WP2)' (#237) from feature/agent-stack-q1 into main
ci / test (push) Failing after 1m55s
2026-10-07 09:12:58 +00:00
weichen 8a1c841939 Record the Q1 scope and increment one
ci / test (pull_request) Failing after 1m57s
Why: The card carries the authorized scope and the increment record.

Evidence: Agent-Squad #23 and Backend #79 merged; make test exit=0
at 2e4dacf9.

Impact: Task card only.
2026-10-07 09:11:41 +00:00
weichen 74316b9e3a Record the superstep pin test evidence
Why: The Dev combination passed make test; the receipt belongs to
the card.

Evidence: make test exit=0 at the amended head.

Impact: Task card only.
2026-10-07 09:11:17 +00:00
weichen 2e4dacf97e Pin the merged superstep engine
Why: Agent-Squad PR #23 and Backend PR #79 landed; Dev pins must
point at those merged component main heads.

Evidence: check-pins exit=0.

Impact: Two gitlinks.

Refs: Agent-Squad PR #23; Agent-System-Backend PR #79
2026-10-07 09:10:10 +00:00
weichen ec1362a91e Record the task card for feature-agent-stack-q1
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-agent-stack-q1.md; R0=3c3533450930660ea22c66b9d9d0f3cd1836499f.

Impact: task metadata only; the feature workspace starts at 3c35334509.

Refs: .task/feature-agent-stack-q1.md
2026-10-07 08:53:27 +00:00
weichen 3c35334509 Merge pull request 'Close the I1 task card' (#236) from feature/agent-stack-i1 into main
ci / test (push) Failing after 1m54s
2026-10-07 08:48:42 +00:00
weichen 3e0385d4f5 Merge origin/main into the I1 closure branch
ci / test (pull_request) Failing after 1m58s
2026-10-07 08:48:11 +00:00
weichen 9964bce0ed Close 1 merged task card(s) and archive them
ci / test (pull_request) Failing after 1m54s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-agent-stack-i1.md(PR#235) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-07 08:44:54 +00:00
weichen c5a2037571 Mark the I1 task card completed for folding
Why: All six work packages are merged and all four acceptance
clauses are verified; the close scan only folds completed cards.

Evidence: sixteen PRs merged across the chain; make test exit=0 at
8865beb9; both eval suites green.

Impact: Task card only.
2026-10-07 08:44:54 +00:00
weichen eafe1e1fbf Merge pull request 'Pin the merged I1 eval-v2 combination' (#235) from feature/agent-stack-i1 into main
ci / test (push) Failing after 1m57s
2026-10-07 08:44:40 +00:00
weichen 9c1cdbb10f Record the post-sync make test evidence
ci / test (pull_request) Failing after 1m54s
Why: Branch protection required main in head; the synced
combination was retested.

Evidence: make test exit=0 at the synced head.

Impact: Task card only.
2026-10-07 08:44:09 +00:00
weichen 8865beb983 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=1f7217f5bb2657418845d6bec6ae28c56920ddc8; candidate=9b745e27361733380bc6511bdb8a4779ba31e27f.

Impact: task metadata only.

Refs: .task/feature-agent-stack-i1.md
2026-10-07 08:42:49 +00:00
weichen 9b745e2736 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=1f7217f5bb2657418845d6bec6ae28c56920ddc8.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-07 08:42:25 +00:00
weichen 3711be36ef Record the failed sync attempt receipt
Why: Failed runs' receipts belong to the card too.

Evidence: native fixtures restored; tree clean.

Impact: Task card only.
2026-10-07 08:42:23 +00:00
weichen c3e90bb673 Record increment three and the I1 verification results
ci / test (pull_request) Failing after 1m56s
Why: All six work packages landed; the card carries the acceptance
evidence and the recorded boundaries.

Evidence: CI success on the five PRs of this increment; make test
exit=0 at 037c678f; both eval suites green.

Impact: Task card only.
2026-10-07 08:37:24 +00:00
weichen 83bb8b3962 Record the eval-v2 pin test evidence
Why: The Dev combination passed make test; the receipt belongs to
the card.

Evidence: make test exit=0 at the amended head.

Impact: Task card only.
2026-10-07 08:36:52 +00:00
weichen 037c678fae Pin the merged I1 eval-v2 combination
Why: The I1 eval increments landed across the chain (intent #8,
squad #21/#22, native #22, backend #77/#78); Dev pins must point at
those merged component main heads.

Evidence: check-pins exit=0 after full matrix propagation.

Impact: Four gitlinks.

Refs: Agent-Intent PR #8; Agent-Squad PR #21/#22; Agent-Native PR #22; Agent-System-Backend PR #77/#78
2026-10-07 08:35:46 +00:00
weichen 1f7217f5bb Merge pull request 'Pin the merged I1 command-model and router combination' (#234) from feature/agent-stack-i1 into main
ci / test (push) Failing after 2m0s
2026-10-07 08:04:19 +00:00