Commit Graph
1702 Commits
Author SHA1 Message Date
weichen 4e765229e5 Close 1 merged task card(s) and archive them
ci / test (pull_request) Failing after 1m40s
ci / test-pg (pull_request) Successful in 55s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-collab-storage-u3-budget-authz.md(PR#333) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-11 08:18:12 +00:00
weichen 5e9354dd11 Merge pull request 'U3 slice 2: shared execution budgets and the action-authz matrix (pin #141/#64)' (#333) from feature/collab-storage-u3-budget-authz into main
ci / test (push) Successful in 2m19s
ci / test-pg (push) Successful in 59s
2026-10-11 08:17:26 +00:00
weichen f93b2720c3 Record the sync checkpoint
ci / test (pull_request) Successful in 2m18s
ci / test-pg (pull_request) Successful in 54s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=95992d751f0a6ea8e345109dbb6b9367d9055e92; candidate=2d114b47503bbc746417d1b4ae68507298d5bcb0.

Impact: task metadata only.

Refs: .task/feature-collab-storage-u3-budget-authz.md
2026-10-11 08:12:47 +00:00
weichen 2d114b4750 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=95992d751f0a6ea8e345109dbb6b9367d9055e92.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 08:12:25 +00:00
weichen 19148c71bb Repin backend to the notice-redelivery recursion fix (PR #142)
Why: the real-PG CI gate on PR #333 exposed the stack overflow; PR #142 fixes it with a regression test.

Evidence: backend origin-main merge of #142 fetched post-merge and checked out.

Impact: gitlink only.

Refs: backend PR #142; Dev PR #333.
2026-10-11 08:12:23 +00:00
weichen 95992d751f Merge pull request 'Close merged task cards (feature/card-close-20261011-054439Z)' (#334) from feature/card-close-20261011-054439Z into main
ci / test-pg (push) Successful in 57s
ci / test (push) Successful in 2m33s
2026-10-11 05:53:49 +00:00
weichen 8dc93dd95c Record the sync checkpoint
ci / test-pg (pull_request) Failing after 1m10s
ci / test (pull_request) Successful in 2m26s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=693f7f0459992c66ae672a966da4fc9fa12c193b; candidate=a266a2f4272a1aebc9f317aba783a5994f60a3e5.

Impact: task metadata only.

Refs: .task/feature-collab-storage-u3-budget-authz.md
2026-10-11 05:48:01 +00:00
weichen a266a2f427 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=693f7f0459992c66ae672a966da4fc9fa12c193b.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:47:37 +00:00
weichen 65e4298d3b Close 1 merged task card(s) and archive them
ci / test-pg (pull_request) Successful in 58s
ci / test (pull_request) Successful in 2m24s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-rdm-two-trees-audit-plan.md(PR#330) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-11 05:44:39 +00:00
weichen 693f7f0459 Merge pull request 'Publish the approved RDM two-trees plan and pin the Dev combination' (#330) from feature/rdm-two-trees-audit-plan into main
ci / test (push) Successful in 2m32s
ci / test-pg (push) Successful in 58s
2026-10-11 05:43:27 +00:00
weichen e65e958f77 Record the sync checkpoint
ci / test (pull_request) Successful in 2m37s
ci / test-pg (pull_request) Successful in 54s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=ec0169cad19c9525ce6ee4d7e26632351a5e5dbc; candidate=7c1eb97384246b30b034f10b3c7cd5965e8c09e2.

Impact: task metadata only.

Refs: .task/feature-collab-storage-u3-budget-authz.md
2026-10-11 05:38:39 +00:00
weichen 7c1eb97384 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=ec0169cad19c9525ce6ee4d7e26632351a5e5dbc.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:38:17 +00:00
weichen 53fb06f3ab Record the sync checkpoint
ci / test (pull_request) Successful in 2m26s
ci / test-pg (pull_request) Successful in 57s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=ec0169cad19c9525ce6ee4d7e26632351a5e5dbc; candidate=cad3334d497e31a1f243a35881ec24f4959c2517.

Impact: task metadata only.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 05:28:18 +00:00
weichen cad3334d49 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=ec0169cad19c9525ce6ee4d7e26632351a5e5dbc.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:27:53 +00:00
weichen ec0169cad1 Merge pull request 'Close merged task cards (feature/card-close-20261011-051207Z)' (#332) from feature/card-close-20261011-051207Z into main
ci / test (push) Successful in 2m29s
ci / test-pg (push) Successful in 53s
2026-10-11 05:24:19 +00:00
weichen de351597ad Fill the task record PR link
ci / test (pull_request) Successful in 2m27s
ci / test-pg (pull_request) Successful in 1m9s
Why: card and PR description are one document; record the PR link before merge.

Evidence: Dev PR #333 created via Gitea API.

Impact: task metadata only.

Refs: PR #333.
2026-10-11 05:21:13 +00:00
weichen 3abfa8a2ba Record the U3 slice-2 delivery state and evidence in the task card
ci / test (pull_request) Successful in 2m24s
ci / test-pg (pull_request) Successful in 1m1s
Why: stage review needs results, stage verdicts and the three evidence segments in the card before the PR.

Evidence: make test / test-backend-pg (real services) / make build all exit 0 via the evidence tool.

Impact: task metadata only.

Refs: backend PR #141; documents PR #64.
2026-10-11 05:20:57 +00:00
weichen b7c8b3527f Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab; candidate=40567aaa665f00354eb57dd3006f798a16065aeb.

Impact: task metadata only.

Refs: .task/feature-collab-storage-u3-budget-authz.md
2026-10-11 05:18:57 +00:00
weichen 40567aaa66 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:18:34 +00:00
weichen 07dc864938 Pin the U3 slice-2 merges: backend PR #141, documents PR #64
Why: the parent must pin the merged component SHAs for the combined build and CI gates.

Evidence: both origin-main merge commits fetched post-merge and checked out.

Impact: gitlink updates only.

Refs: backend PR #141; documents PR #64.
2026-10-11 05:18:32 +00:00
weichen 155d260c98 Record the sync checkpoint
ci / test (pull_request) Successful in 2m23s
ci / test-pg (pull_request) Successful in 53s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab; candidate=80741d42d68788dad2b6f0191fd9fa82f0ca92e1.

Impact: task metadata only.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 05:15:26 +00:00
weichen 80741d42d6 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:15:02 +00:00
weichen 5d16a51f47 Backfill the merge and cleanup records in the archived U1 card
ci / test (pull_request) Successful in 2m25s
ci / test-pg (pull_request) Successful in 56s
Why: The close automation filled the card header (PR #329, merge
bfcdeef) but the merge-record and cleanup-record lines still said
NOT_RUN.

Evidence: CI ci/test passed on final head 7f58e6e (run 1767) after a
pre-merge task-sync to 90c07a5; task-finish recycled the worktree and
deleted the task branch at 7f58e6e on 2026-10-11.

Impact: Archived task-card text only.

Refs: PR #329; PR #332
2026-10-11 05:12:21 +00:00
weichen 3d77a7696c Close 1 merged task card(s) and archive them
ci / test-pg (pull_request) Successful in 58s
ci / test (pull_request) Successful in 2m23s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-generative-ui-u1.md(PR#329) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-11 05:12:07 +00:00
weichen bfcdeef9aa Merge pull request 'Publish the U1 trial results and pin the Generative UI proposal r2 (documents #62)' (#329) from feature/generative-ui-u1 into main
ci / test (push) Successful in 2m18s
ci / test-pg (push) Successful in 1m7s
2026-10-11 05:11:28 +00:00
weichen 4569a13dbb Record the task card for feature-collab-storage-u3-budget-authz
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-collab-storage-u3-budget-authz.md; R0=90c07a5b4fb75251ea72b492ccb6714e5e699fe5.

Impact: task metadata only; the feature workspace starts at 90c07a5b4f.

Refs: .task/feature-collab-storage-u3-budget-authz.md
2026-10-11 05:08:18 +00:00
weichen 7f58e6ed86 Record the pre-merge task-sync receipts
ci / test (pull_request) Successful in 2m13s
ci / test-pg (pull_request) Successful in 52s
2026-10-11 04:56:22 +00:00
weichen eaee982b80 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=90c07a5b4fb75251ea72b492ccb6714e5e699fe5; candidate=53682572b904e9744e9a524fcaf2a96efeff3947.

Impact: task metadata only.

Refs: .task/feature-generative-ui-u1.md
2026-10-11 04:56:21 +00:00
weichen 53682572b9 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=90c07a5b4fb75251ea72b492ccb6714e5e699fe5.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 04:55:57 +00:00
weichen 90c07a5b4f Merge pull request 'Close merged task cards (feature/card-close-20261011-044851Z)' (#331) from feature/card-close-20261011-044851Z into main
ci / test (push) Successful in 2m21s
ci / test-pg (push) Successful in 56s
2026-10-11 04:49:01 +00:00
weichen a5f43fa50d Close 1 merged task card(s) and archive them
ci / test (pull_request) Successful in 2m19s
ci / test-pg (pull_request) Successful in 56s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-collab-storage-u3-atomicity.md(PR#328) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-11 04:48:51 +00:00
weichen b2dd0c845d Merge pull request 'U3 slice 1: request atomicity, card versions, atomic rate limit, recovery holds (pin backend #140)' (#328) from feature/collab-storage-u3-atomicity into main
ci / test-pg (push) Successful in 53s
ci / test (push) Successful in 2m20s
2026-10-11 04:48:03 +00:00
weichen 0876477918 Integrate the approved two-trees plan into the Dev combination
ci / test (pull_request) Successful in 2m22s
ci / test-pg (pull_request) Successful in 55s
Why: the plan was approved and merged in Documents (PR #63); the Dev pin and planning entry must follow the approved master record.

Evidence: modules/documents gitlink d3e40c783d1a092b67d025303f28384a564548f4 (Documents PR #63 merge, SELF API query); task card backfilled with the user rulings and merge record.

Impact: documents gitlink, PROJECT.md planning entry, and task-card metadata only; no code change.

Refs: Documents PR #63; .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:45:11 +00:00
weichen 13bead50f8 Fill the task record PR link (#329)
ci / test (pull_request) Successful in 2m23s
ci / test-pg (pull_request) Successful in 57s
2026-10-11 04:45:03 +00:00
weichen 420986641f Record the task-sync and test receipts for the U1 publication
ci / test-pg (pull_request) Successful in 56s
ci / test (pull_request) Successful in 2m21s
2026-10-11 04:44:47 +00:00
weichen 80024832a8 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9; candidate=954ea710df182128d782196d99dbbbfae4d114d4.

Impact: task metadata only.

Refs: .task/feature-generative-ui-u1.md
2026-10-11 04:43:28 +00:00
weichen 954ea710df Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 04:43:06 +00:00
weichen 1c25d65ae9 Record the U1 trial: harness, results, and task-card outcomes
Why: The U1 controlled trial finished; its fixtures, validator, runner,
per-run results, report, and renderer spike must be reviewable from the
task branch, and the task card needs the final PASS/FAIL record.

Evidence: results/summary.json + report.md (SELF, MiniMax official
channel, CNY 3 of 200 cap); make evidence receipts for precheck,
task-sync, and make test follow in this branch.

Impact: Task-scoped experiment artifacts only (.task/genui-u1/); no
production code changes.

Refs: Documents PR #62 (proposal r2); task card feature/generative-ui-u1
2026-10-11 04:43:03 +00:00
weichen 02deea4329 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9; candidate=9c5aa1504df945824b55e593e17320b563569b67.

Impact: task metadata only.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:42:10 +00:00
weichen 9c5aa1504d Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 04:41:46 +00:00
weichen 55f2d31493 Record the approval rulings and review outcome in the task card
Why: the user approved the bundled five stages and chose the two-tier admin model; the card must record the human review gate and both rulings.

Evidence: SELF doc-check receipt appended by make evidence (exit 0, ruled plan sha256 56c0fada60140decb40df0201599891b4702814746ed44a2c0197b4483e0763b); Documents ruling commit b857595.

Impact: task metadata only (task card); no code or submodule change.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:41:40 +00:00
weichen 8fc7c64595 Fill the task record PR link
ci / test (pull_request) Successful in 2m32s
ci / test-pg (pull_request) Successful in 54s
Why: card and PR description are one document; record the PR link on the branch before merge.

Evidence: Dev PR #328 created via Gitea API.

Impact: task metadata only.

Refs: PR #328.
2026-10-11 04:41:06 +00:00
weichen b680b95f24 Record the U3 slice-1 delivery state and evidence in the task card
ci / test-pg (pull_request) Successful in 54s
ci / test (pull_request) Successful in 2m22s
Why: stage review needs the results, stage verdicts and three evidence segments in the card before the PR.

Evidence: make test / test-backend-pg (real services) / make build all exit 0 via the evidence tool.

Impact: task metadata only.

Refs: backend PR #140.
2026-10-11 04:40:52 +00:00
weichen 6f32083df8 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9; candidate=f3e7e67fb31cd4a7a1f77394eb7650a8230fb490.

Impact: task metadata only.

Refs: .task/feature-collab-storage-u3-atomicity.md
2026-10-11 04:38:52 +00:00
weichen f3e7e67fb3 Pin the backend U3 atomicity merge (PR #140)
Why: the parent must pin the merged component SHA for the combined build and CI gates.

Evidence: backend origin-main merge of #140 fetched and checked out.

Impact: gitlink only.

Refs: backend PR #140.
2026-10-11 04:38:09 +00:00
weichen d3497ad6f0 Record the task card for feature-collab-storage-u3-atomicity
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-collab-storage-u3-atomicity.md; R0=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9.

Impact: task metadata only; the feature workspace starts at 6479eb5c38.

Refs: .task/feature-collab-storage-u3-atomicity.md
2026-10-11 04:28:22 +00:00
weichen 6479eb5c38 Merge pull request 'Close merged task cards (feature/card-close-20261011-041534Z)' (#327) from feature/card-close-20261011-041534Z into main
ci / test (push) Successful in 2m24s
ci / test-pg (push) Successful in 54s
2026-10-11 04:15:41 +00:00
weichen df69db7d5e Close 1 merged task card(s) and archive them
ci / test-pg (pull_request) Successful in 56s
ci / test (pull_request) Successful in 2m20s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-collab-storage-pg-tier.md(PR#325) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-11 04:15:34 +00:00
weichen 62d7c6e27c Merge pull request 'U1+U2: team PG tier, atomic migrations, connection budget, real-database CI gate (pin #137/#61)' (#325) from feature/collab-storage-pg-tier into main
ci / test (push) Successful in 2m17s
ci / test-pg (push) Successful in 55s
2026-10-11 04:13:49 +00:00
weichen bb82924454 Repin backend to the migration busy-retry fix (PR #139)
ci / test-pg (pull_request) Successful in 52s
ci / test (pull_request) Successful in 2m16s
Why: the racing-migrator test failed deterministically on slow CI disks from the connection-open phase; PR #139 adds a bounded Begin retry and pre-materializes the racing test database.

Evidence: backend PR #139 merged (CI logs jobs 2285/2293 cited there); local store suite green.

Impact: gitlink only.

Refs: PR #325.
2026-10-11 04:09:07 +00:00