Commit Graph
3133 Commits
Author SHA1 Message Date
weichen 7dd8d0f52e Close stale DHF delivery gate rows
ci / svc-realcombo (pull_request) Successful in 1m59s
ci / test (pull_request) Successful in 6m16s
ci / test-pg (pull_request) Successful in 15m5s
Why: The archived card still listed Review, synchronization, CI, merge and cleanup as NOT_RUN despite recorded completion.

Evidence: Exact PR heads, CI runs, merge SHAs, queue release and owner Stage 10 approval are linked in the card.

Impact: The terminal delivery section now agrees with its stage table and remaining U1 boundary.

Refs: Dev PR #542; Dev PR #540; RDM PR #365
2026-10-14 08:28:21 +00:00
weichen de1754f8f5 Finalize DHF task card with merged evidence
ci / test-pg (pull_request) Failing after 16s
ci / svc-realcombo (pull_request) Successful in 2m2s
ci / test (pull_request) Successful in 5m16s
Why: Automatic card backfill left the current stage and result summary describing the old WIP candidate.

Evidence: PR #102/#365/#540 merge readbacks, exact-head CI runs 3095/3092, independent review, owner Stage 7 recheck, and approved Stage 10 cleanup are recorded.

Impact: The archived card now shows the current U1 increment outcome and keeps historical checkpoints labeled as such.

Refs: Dev PR #540; RDM PR #365; Documents PR #102
2026-10-14 08:23:24 +00:00
weichen 5c9cd0f68f Close 1 merged task card(s) and archive them
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-template-pipeline-plan.md(PR#540) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-14 08:21:19 +00:00
weichen 11aa76a3bc Merge pull request 'Track DHF delivery against the fixed Documents plan' (#540) from feature/dhf-template-pipeline-plan into main
ci / svc-realcombo (push) Successful in 2m12s
ci / test (push) Failing after 4m31s
ci / test-pg (push) Successful in 7m46s
2026-10-14 08:08:07 +00:00
weichen 889f64f881 Record renewed DHF component validation
ci / svc-realcombo (pull_request) Successful in 1m54s
ci / test (pull_request) Successful in 5m49s
ci / test-pg (pull_request) Successful in 8m23s
Why: The Documents pin and authoritative base changed after the prior Stage 7 GATE.

Evidence: make evidence captured sync, make test, and make build on the new component combination; the initial uncommitted-pin failure remains recorded.

Impact: Dev task card identifies the tested Documents SHA and awaits current-head CI and review.

Refs: Dev PR #540; Documents PR #102; DHF U1 Stage 8 review
2026-10-14 07:48:52 +00:00
weichen 5368460ade Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=d23fb4363dcc0a206e71e47f9cd23a644c7e1c70; before_record=64707c5c61f06776515700d87074ae76eac8c8a3.

Impact: task metadata only.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 07:42:37 +00:00
weichen 64707c5c61 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=d23fb4363dcc0a206e71e47f9cd23a644c7e1c70.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 07:42:14 +00:00
weichen d16917cb4e Pin reviewed DHF plan status in Documents
Why: Stage 8 review found that the main plan still described the approved increment as a draft.

Evidence: Documents commit 6619835 adds a dated status note without changing the approved plan body; the first pre-commit combination check correctly rejected the uncommitted pin drift.

Impact: Dev now records the exact Documents component SHA for renewed combination validation.

Refs: Documents PR #102; Dev PR #540; DHF U1 Stage 8 review
2026-10-14 07:40:41 +00:00
weichen d23fb4363d Merge pull request 'Close the merged svc-pidcheck-leak task card' (#541) from feature/card-close-pidcheck-20261014-072240Z into main
ci / svc-realcombo (push) Successful in 1m57s
ci / test (push) Successful in 6m45s
ci / test-pg (push) Successful in 8m3s
2026-10-14 07:33:17 +00:00
weichen 221afaeb16 Close the merged svc-pidcheck-leak task card and archive it
ci / svc-realcombo (pull_request) Successful in 2m2s
ci / test (pull_request) Successful in 5m26s
ci / test-pg (pull_request) Successful in 8m34s
Why: PR #457 landed as a squash so main has no "from
feature/svc-pidcheck-leak into main" merge commit and task-close's
card_merge did not pick the card up; user authorized wrap-up on
2026-10-14. R2 (service restoration, rdmcand independent data) was
verified live today before closure.

Evidence: merge 226a4af157 verified as
origin/main ancestor; SELF receipts /tmp/svc-list-verify-20261014T072236.json
and /tmp/svc-info-rdmcand-verify-20261014T072259.json record the live
svc-list and svc-info checks; in-card test-governance receipts back R1.

Impact: backfills status, results, merge and cleanup records on the
card and moves it to .task/archive/; no code changes.
2026-10-14 07:24:20 +00:00
weichen 6463ef4306 Record current-main DHF combination checks
ci / svc-realcombo (pull_request) Successful in 1m47s
ci / test (pull_request) Successful in 5m19s
ci / test-pg (pull_request) Successful in 7m37s
Why: Dev main advanced before the WIP PR, so the fixed Documents pin needed fresh combination evidence on the new base.

Evidence: make task-sync incorporated d40579e; make test and make build exited 0 at 5f88fd6 with SELF receipts.

Impact: Task evidence only; CI/GATE and final merge window remain pending.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 07:00:27 +00:00
weichen 5f88fd6921 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e; before_record=abb742bd36fed82e817ba52218dfaeb640aea430.

Impact: task metadata only.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:54:17 +00:00
weichen abb742bd36 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 06:53:55 +00:00
weichen 256eaded79 Record final Dev combination verification
Why: The updated Documents pin needed fresh combined tests before its PR candidate could be fixed.

Evidence: make task-sync changed=0; make test and make build exited 0 at f628e6b with SELF receipts.

Impact: Task evidence only; publication and deployment remain untouched.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:44:09 +00:00
weichen d40579ed7f Merge pull request 'Fix facts registry commands and make precheck parsing escape-aware' (#539) from fix/facts-registry-commands into main
ci / svc-realcombo (push) Successful in 1m55s
ci / test (push) Successful in 5m9s
ci / test-pg (push) Successful in 7m32s
2026-10-14 06:40:53 +00:00
weichen f628e6b38b Advance DHF Documents pin after main sync
Why: The Documents main gained an unrelated merge-queue report before PR submission, so the feature branch must include the current authoritative base.

Evidence: Comparing c256558 and fdca353 shows only the merge-queue report changed; the DHF plan, index and asset inventory retain their bytes. Dev combination tests follow on this exact pin.

Impact: Update the Documents gitlink and stage-seven trace; no DHF package, publication or runtime data change.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:37:41 +00:00
weichen 942c42dd09 Record stage-seven local verification in Dev task
Why: The synchronized Dev combination has a new exact test/build receipt for the current DHF increment.

Evidence: make task-sync, make test and make build at 6b5cc2de58 exited 0; source is SELF in the task card.

Impact: Task record only; PR HEAD CI, owner acceptance and deployment remain pending.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:33:05 +00:00
weichen 6b5cc2de58 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=427e9faf47641a427c5f2173244f65b8867c4500; before_record=df9b853de135d8058b6d316b7f8399224d7a6423.

Impact: task metadata only.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:25:23 +00:00
weichen df9b853de1 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=427e9faf47641a427c5f2173244f65b8867c4500.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 06:24:58 +00:00
weichen 4b06ccd44b Record owner stage-six decision for DHF increment
Why: The Dev task card must preserve the manual stage boundary before formal verification begins.

Evidence: Owner confirmed the fixed U1 review object with 14 DOC fidelity and 40 assets still open.

Impact: Stage state only; no component, publication or deployment change.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:24:35 +00:00
weichen f8b2ef1a02 Record synchronized DHF stage-review evidence
Why: Dev main and component pins advanced before the U1 increment review, so the new combination needed its own test and build evidence.

Evidence: make task-sync, make test, and make build exited 0 with SELF receipts at the synchronized Dev checkpoint 71fabf3120.

Impact: Task evidence only; no component or plan-body changes beyond the synchronized main composition.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:20:34 +00:00
weichen 3b0e100fba Fix facts registry commands and make precheck parsing escape-aware
ci / svc-realcombo (pull_request) Successful in 1m59s
ci / test (pull_request) Successful in 5m13s
ci / test-pg (pull_request) Successful in 8m6s
Why: F2 token extraction predates the two-section (HOME/IMC) layout of
~/.secrets/gitea so it concatenated both tokens and always failed; F6
registered a grep BRE alternation that facts-verify unescapes into a
literal pipe, failing re-verification and misaligning precheck's naive
pipe split into a spurious F6 date-format expiry warning, while both
underlying facts still hold.

Evidence: make facts-verify now 6/6 PASS with last_verified refreshed
to 2026-10-14; new regression test for escaped pipes in facts rows;
full governance suite 342 tests OK (18 skipped); precheck [facts] line
reports all facts fresh on the fixed parser.

Impact: policy/facts.md F2 (HOME-section awk extraction) and F6
(negated pipe-free grep); scripts/task.sh precheck neutralizes escaped
pipes the same way facts-verify does; tests/test_task.py covers it.

Refs: precheck WARN 过期事实 F6(日期格式); AGENTS.md 证据与验证门禁.
2026-10-14 06:13:51 +00:00
weichen 71fabf3120 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=4f84c2e1630cd0311643529fae1c3a99f1dd5d64; before_record=c5eae5d48899a23c69194127082b9eef53df0b77.

Impact: task metadata only.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:13:27 +00:00
weichen 427e9faf47 Merge pull request 'Close merged task cards (feature/card-close-20261012-123313Z)' (#471) from feature/card-close-20261012-123313Z into main
ci / svc-realcombo (push) Successful in 1m48s
ci / test (push) Successful in 5m13s
ci / test-pg (push) Successful in 8m39s
2026-10-14 06:13:17 +00:00
weichen c5eae5d488 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=4f84c2e1630cd0311643529fae1c3a99f1dd5d64.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 06:13:02 +00:00
weichen d283ece1e0 Record four owner-reviewed DHF candidates in Dev progress
Why: The Dev project entry and task card still described only three accepted packages after the DI owner review.

Evidence: RDM DI catalog binds four exact hashes and RDM local tests/build passed at 9997990; Dev git diff --check receipt is in this task card.

Impact: Progress record only; Documents pin, publication state, deployment and runtime data are unchanged.

Refs: PROJECT.md; .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:10:53 +00:00
weichen 7c183b8821 Merge remote-tracking branch 'origin/main' into feature/card-close-20261012-123313Z
ci / svc-realcombo (pull_request) Successful in 1m56s
ci / test (pull_request) Successful in 5m15s
ci / test-pg (pull_request) Successful in 7m56s
2026-10-14 06:00:11 +00:00
weichen 4adcb53235 Record three owner-reviewed DHF candidates in Dev progress
Why: Keep the integration entry aligned with the separate project-proposal, F01 and F02 package decisions.

Evidence: SELF RDM make test passed on 87fa010; owner four-hash decisions are recorded in the RDM task card.

Impact: Progress metadata only; 44 assets remain unpublished and 14 DOC fidelity reviews remain open.

Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
2026-10-14 05:26:43 +00:00
weichen 1aa2980f9e Record F01 and F02 review candidates in Dev progress
Why: Keep the integration task aligned with the two unpublished process-validation Word packages and their owner review boundary.

Evidence: SELF RDM make task-sync and GOWORK=off make test passed on 10933dc; receipts remain in the RDM task card.

Impact: Progress metadata only; no Documents pin, dictionary, live data, or publication change.

Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
2026-10-14 05:21:38 +00:00
weichen 4f84c2e163 Merge pull request 'Close three trial task cards and fix long-history detection' (#538) from feature/card-close-merge-queue-trial-20261014 into main
ci / svc-realcombo (push) Successful in 3m5s
ci / test (push) Successful in 7m53s
ci / test-pg (push) Successful in 9m31s
2026-10-14 05:08:39 +00:00
weichen 2221a099b7 Backfill the three archived trial card outcomes
ci / svc-realcombo (pull_request) Successful in 2m12s
ci / test (pull_request) Successful in 5m19s
ci / test-pg (pull_request) Successful in 7m44s
Why: The archive move staged the path changes while leaving the status and merge receipts as unstaged content; each archived card must carry its actual completed result.

Evidence: The recorded merge commits f00165e8, d852c159, and 05b997b8 are present in origin/main and match Dev PR #489/#488/#486.

Impact: Mark exactly three authorized cards complete and record their merge subjects without changing other task cards.

Refs: Dev merge queue #518; Dev #489, #488, #486
2026-10-14 04:50:27 +00:00
weichen deff43ae59 Close trial task cards and keep long histories visible
Why: pipefail treated a recent merged-card match as a failed git log after grep exited early, hiding completed cards from precheck and task-close.

Evidence: A disposable long-history regression failed before the fix and passed after it; make test-governance passed 341 cases. Git history confirms PR #489/#488/#486 merge SHAs.

Impact: Detect merged cards reliably and archive only the three authorized trial cards; four unrelated eligible cards remain untouched.

Refs: Dev merge queue #518; Dev #489, #488, #486
2026-10-14 04:50:06 +00:00
weichen 05b997b84d Merge pull request 'Deliver U7 account transactions on the current combination' (#486) from feature/u7-account-tx-audit into main
ci / svc-realcombo (push) Successful in 2m13s
ci / test (push) Successful in 5m3s
ci / test-pg (push) Successful in 7m52s
2026-10-14 04:36:00 +00:00
weichen d805cc1697 Record U7 integration evidence and correct the specification
ci / svc-realcombo (pull_request) Successful in 1m54s
ci / test (pull_request) Successful in 5m1s
ci / test-pg (pull_request) Successful in 7m19s
Why: The account task needs the actual synchronized combination and raw local checks before freezing its final Dev candidate; two spec lines overstated identity and test behavior.

Evidence: SELF make test, isolated PostgreSQL and Redis backend tests, make build, and task-sync receipts are imported; Backend #185 has independent REPLAY and exact-head GATE.

Impact: Keep current component pins, clarify read-only identity verification and test coverage, and prepare the Dev PR for final exact-head admission.

Refs: Dev #486; Backend #185; merge queue #518
2026-10-14 04:23:31 +00:00
weichen d2783e4061 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=d852c159b6b3387a2f418a42ab6d3696ac873d01; before_record=665955279bac407e2f55bbba9f7299e48fd70031.

Impact: task metadata only.

Refs: .task/feature-u7-account-tx-audit.md
2026-10-14 04:17:13 +00:00
weichen 665955279b Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=d852c159b6b3387a2f418a42ab6d3696ac873d01.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 04:16:47 +00:00
weichen 1f347c5ec4 Pin the merged account transaction backend
Why: The Dev U7 task must consume the actual reviewed Backend merge and record the current agent-only delivery authorization.

Evidence: Backend #185 merged as 8e80e261 after independent REPLAY and exact-head GATE run 3062; task card preserves the original SELF resume receipt.

Impact: Advance the Backend gitlink to the merged component; parent combination and CI remain pending final synchronization.

Refs: Dev #486; Backend #185; Dev queue #518
2026-10-14 04:15:55 +00:00
weichen 0f19dc1b12 Record process-validation stage decision in Dev progress
Why: Keep the integration project entry aligned with the owner F01/F02 purpose and stage decisions.

Evidence: SELF RDM make test passed on cdb66c5; detailed source and dictionary checks are in the RDM task card.

Impact: Progress metadata only; no dictionary registration, running data migration, or template publication.

Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
2026-10-14 04:08:47 +00:00
weichen 0f7af8b443 Record DHF pilot acceptance in Dev progress
Why: Keep the integration project entry aligned with the owner-approved pilot package while preserving the unpublished state.

Evidence: SELF RDM make test passed on e21a82b; owner acceptance and four artifact digests are recorded in the RDM task card.

Impact: Progress metadata only; E1, F01/F02 purpose, U1 completion and release remain open.

Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
2026-10-14 03:59:52 +00:00
weichen b46efc246e Record owner DHF pilot decision and review status
Why: Keep the Dev project entry and task record aligned with the owner semantic decision and the RDM pilot package.

Evidence: SELF RDM make task-sync and GOWORK=off make test passed on df17ed1; the exact receipts are in the RDM task card.

Impact: Progress metadata only; E1 fidelity, publication, U2-U6, and deployment remain open.

Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
2026-10-14 03:49:58 +00:00
weichen d852c159b6 Merge pull request 'Deliver RDM audit export in the controlled integration window' (#488) from feature/rdm-audit-export-entry into main
ci / svc-realcombo (push) Successful in 1m59s
ci / test (push) Successful in 5m16s
ci / test-pg (push) Successful in 7m35s
2026-10-14 03:46:36 +00:00
weichen a70de2c54a Validate export delivery in the controlled integration window
ci / svc-realcombo (pull_request) Successful in 1m54s
ci / test (pull_request) Successful in 5m12s
ci / test-pg (pull_request) Successful in 8m42s
Why: Finish Dev #488 with delivered Frontend and RDM objects, explicit audit grants in private browser fixtures, and owned process cleanup.

Evidence: Tool-imported SELF precheck, final sync, make test, and real-browser runs retain failures and passes; latest isolated runtime completed seven browser cases. Final exact-head GATE and independent parent Review follow.

Impact: Preserves other main components and existing CI jobs while the one final candidate is fixed for formal checks.

Refs: Dev PR #488; Frontend PR #73; RDM PR #301; queue Issue #518
2026-10-14 03:35:17 +00:00
weichen 205b611ca6 Record approved DHF U1 progress and Documents pin
Why: Keep the Dev project entry and task record aligned with the approved DHF implementation and saved U1 evidence.

Evidence: SELF make test passed on the Dev combination with Documents c256558; the complete output is in the task card.

Impact: Advances only the Documents pin and progress metadata; no template publication, migration, or deployment.

Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
2026-10-14 03:27:57 +00:00
weichen 925c6a989d Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=f00165e8d71e4dc8ba0ceb7dc50c1a8a3deb6d60; before_record=3e39e8fcdbb885dfe6537b578c20bbcac647b5a3.

Impact: task metadata only.

Refs: .task/feature-rdm-audit-export-entry.md
2026-10-14 03:22:16 +00:00
weichen 3e39e8fcdb Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=f00165e8d71e4dc8ba0ceb7dc50c1a8a3deb6d60.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 03:21:51 +00:00
weichen 000eb75245 Pin delivered frontend export and record current dependency
Why: Prepare genuine Dev #488 for its final window using actually merged component versions and the authorized agent merge scope.

Evidence: Frontend PR 73 tree-identical merge and independent review; RDM PR 301 GATE3044, independent replay, Root merge ef510. Full Dev combination and exact-head CI remain pending.

Impact: Advances the frontend pin and task record only; current target main sync follows in the scheduled final window.

Refs: Dev PR #488; Frontend PR #73; RDM PR #301; Issue #518
2026-10-14 03:19:40 +00:00
weichen f00165e8d7 Merge pull request 'Pin proposal status and start the controlled merge queue trial' (#489) from feature/proposal-status-20261012 into main
ci / svc-realcombo (push) Successful in 1m56s
ci / test (push) Successful in 5m14s
ci / test-pg (push) Successful in 7m47s
2026-10-14 02:30:51 +00:00
weichen 5e6bf4aa05 Pin proposal status and start the controlled merge queue trial
ci / svc-realcombo (pull_request) Successful in 1m46s
ci / test (pull_request) Successful in 5m10s
ci / test-pg (pull_request) Successful in 7m22s
Why: retain the approved status changes and current documentation while adopting the already approved manual delivery window after real platform validation.
Evidence: original startup, conflict resolution, combination test and writer inventory receipts are preserved in the task card; independent Doc89 and platform replay reports are referenced. Final candidate CI and review remain required.
Impact: publish the delivered Documents merge, manual trial policy and truthful capability state; keep all workflow triggers/checks and original task baseline unchanged.
Refs: Dev PR #489; Documents PR #89; Issue #518; approved merge queue implementation plan r1; user continuation authorization on 2026-10-14
2026-10-14 02:10:35 +00:00
weichen 143228d85f Record approval and preserve the DHF implementation baseline
Why: Resume the approved DHF work from saved planning artifacts and a clean task tree.

Evidence: Startup failure and combination-check receipts are retained in the task card.

Impact: Planning entry, task authorization and Documents composition only.

Refs: feature/dhf-template-pipeline-plan; DHF plan r0.1
2026-10-14 02:00:44 +00:00
weichen 839b2a3af0 Synchronize proposal status delivery with the current integration baseline
Why: restore the assigned task against the current target while retaining its original baseline and all newer component capabilities.
Evidence: startup precheck and real parent/component sync receipts capture the original conflict; Documents PR89 was independently reviewed, merged by the agent, and its tree verified.
Impact: include origin/main and the delivered documentation merge 7bd4e17827d4c7c88647bf3c9199c495b60cb107 without rewriting task history or pushing waiting branches.
Refs: Dev PR #489; Documents PR #89; merge queue Issue #518; user takeover authorization on 2026-10-14
2026-10-14 01:18:47 +00:00