Why: The archived card still listed Review, synchronization, CI, merge and cleanup as NOT_RUN despite recorded completion.
Evidence: Exact PR heads, CI runs, merge SHAs, queue release and owner Stage 10 approval are linked in the card.
Impact: The terminal delivery section now agrees with its stage table and remaining U1 boundary.
Refs: Dev PR #542; Dev PR #540; RDM PR #365
Why: Automatic card backfill left the current stage and result summary describing the old WIP candidate.
Evidence: PR #102/#365/#540 merge readbacks, exact-head CI runs 3095/3092, independent review, owner Stage 7 recheck, and approved Stage 10 cleanup are recorded.
Impact: The archived card now shows the current U1 increment outcome and keeps historical checkpoints labeled as such.
Refs: Dev PR #540; RDM PR #365; Documents PR #102
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-template-pipeline-plan.md(PR#540) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: The Documents pin and authoritative base changed after the prior Stage 7 GATE.
Evidence: make evidence captured sync, make test, and make build on the new component combination; the initial uncommitted-pin failure remains recorded.
Impact: Dev task card identifies the tested Documents SHA and awaits current-head CI and review.
Refs: Dev PR #540; Documents PR #102; DHF U1 Stage 8 review
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d23fb4363dcc0a206e71e47f9cd23a644c7e1c70.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Stage 8 review found that the main plan still described the approved increment as a draft.
Evidence: Documents commit 6619835 adds a dated status note without changing the approved plan body; the first pre-commit combination check correctly rejected the uncommitted pin drift.
Impact: Dev now records the exact Documents component SHA for renewed combination validation.
Refs: Documents PR #102; Dev PR #540; DHF U1 Stage 8 review
Why: PR #457 landed as a squash so main has no "from
feature/svc-pidcheck-leak into main" merge commit and task-close's
card_merge did not pick the card up; user authorized wrap-up on
2026-10-14. R2 (service restoration, rdmcand independent data) was
verified live today before closure.
Evidence: merge 226a4af157 verified as
origin/main ancestor; SELF receipts /tmp/svc-list-verify-20261014T072236.json
and /tmp/svc-info-rdmcand-verify-20261014T072259.json record the live
svc-list and svc-info checks; in-card test-governance receipts back R1.
Impact: backfills status, results, merge and cleanup records on the
card and moves it to .task/archive/; no code changes.
Why: Dev main advanced before the WIP PR, so the fixed Documents pin needed fresh combination evidence on the new base.
Evidence: make task-sync incorporated d40579e; make test and make build exited 0 at 5f88fd6 with SELF receipts.
Impact: Task evidence only; CI/GATE and final merge window remain pending.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The updated Documents pin needed fresh combined tests before its PR candidate could be fixed.
Evidence: make task-sync changed=0; make test and make build exited 0 at f628e6b with SELF receipts.
Impact: Task evidence only; publication and deployment remain untouched.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: The Documents main gained an unrelated merge-queue report before PR submission, so the feature branch must include the current authoritative base.
Evidence: Comparing c256558 and fdca353 shows only the merge-queue report changed; the DHF plan, index and asset inventory retain their bytes. Dev combination tests follow on this exact pin.
Impact: Update the Documents gitlink and stage-seven trace; no DHF package, publication or runtime data change.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: The synchronized Dev combination has a new exact test/build receipt for the current DHF increment.
Evidence: make task-sync, make test and make build at 6b5cc2de58 exited 0; source is SELF in the task card.
Impact: Task record only; PR HEAD CI, owner acceptance and deployment remain pending.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=427e9faf47641a427c5f2173244f65b8867c4500.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The Dev task card must preserve the manual stage boundary before formal verification begins.
Evidence: Owner confirmed the fixed U1 review object with 14 DOC fidelity and 40 assets still open.
Impact: Stage state only; no component, publication or deployment change.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: Dev main and component pins advanced before the U1 increment review, so the new combination needed its own test and build evidence.
Evidence: make task-sync, make test, and make build exited 0 with SELF receipts at the synchronized Dev checkpoint 71fabf3120.
Impact: Task evidence only; no component or plan-body changes beyond the synchronized main composition.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: F2 token extraction predates the two-section (HOME/IMC) layout of
~/.secrets/gitea so it concatenated both tokens and always failed; F6
registered a grep BRE alternation that facts-verify unescapes into a
literal pipe, failing re-verification and misaligning precheck's naive
pipe split into a spurious F6 date-format expiry warning, while both
underlying facts still hold.
Evidence: make facts-verify now 6/6 PASS with last_verified refreshed
to 2026-10-14; new regression test for escaped pipes in facts rows;
full governance suite 342 tests OK (18 skipped); precheck [facts] line
reports all facts fresh on the fixed parser.
Impact: policy/facts.md F2 (HOME-section awk extraction) and F6
(negated pipe-free grep); scripts/task.sh precheck neutralizes escaped
pipes the same way facts-verify does; tests/test_task.py covers it.
Refs: precheck WARN 过期事实 F6(日期格式); AGENTS.md 证据与验证门禁.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=4f84c2e1630cd0311643529fae1c3a99f1dd5d64.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The Dev project entry and task card still described only three accepted packages after the DI owner review.
Evidence: RDM DI catalog binds four exact hashes and RDM local tests/build passed at 9997990; Dev git diff --check receipt is in this task card.
Impact: Progress record only; Documents pin, publication state, deployment and runtime data are unchanged.
Refs: PROJECT.md; .task/feature-dhf-template-pipeline-plan.md
Why: Keep the integration entry aligned with the separate project-proposal, F01 and F02 package decisions.
Evidence: SELF RDM make test passed on 87fa010; owner four-hash decisions are recorded in the RDM task card.
Impact: Progress metadata only; 44 assets remain unpublished and 14 DOC fidelity reviews remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration task aligned with the two unpublished process-validation Word packages and their owner review boundary.
Evidence: SELF RDM make task-sync and GOWORK=off make test passed on 10933dc; receipts remain in the RDM task card.
Impact: Progress metadata only; no Documents pin, dictionary, live data, or publication change.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: The archive move staged the path changes while leaving the status and merge receipts as unstaged content; each archived card must carry its actual completed result.
Evidence: The recorded merge commits f00165e8, d852c159, and 05b997b8 are present in origin/main and match Dev PR #489/#488/#486.
Impact: Mark exactly three authorized cards complete and record their merge subjects without changing other task cards.
Refs: Dev merge queue #518; Dev #489, #488, #486
Why: pipefail treated a recent merged-card match as a failed git log after grep exited early, hiding completed cards from precheck and task-close.
Evidence: A disposable long-history regression failed before the fix and passed after it; make test-governance passed 341 cases. Git history confirms PR #489/#488/#486 merge SHAs.
Impact: Detect merged cards reliably and archive only the three authorized trial cards; four unrelated eligible cards remain untouched.
Refs: Dev merge queue #518; Dev #489, #488, #486
Why: The account task needs the actual synchronized combination and raw local checks before freezing its final Dev candidate; two spec lines overstated identity and test behavior.
Evidence: SELF make test, isolated PostgreSQL and Redis backend tests, make build, and task-sync receipts are imported; Backend #185 has independent REPLAY and exact-head GATE.
Impact: Keep current component pins, clarify read-only identity verification and test coverage, and prepare the Dev PR for final exact-head admission.
Refs: Dev #486; Backend #185; merge queue #518
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d852c159b6b3387a2f418a42ab6d3696ac873d01.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The Dev U7 task must consume the actual reviewed Backend merge and record the current agent-only delivery authorization.
Evidence: Backend #185 merged as 8e80e261 after independent REPLAY and exact-head GATE run 3062; task card preserves the original SELF resume receipt.
Impact: Advance the Backend gitlink to the merged component; parent combination and CI remain pending final synchronization.
Refs: Dev #486; Backend #185; Dev queue #518
Why: Keep the integration project entry aligned with the owner F01/F02 purpose and stage decisions.
Evidence: SELF RDM make test passed on cdb66c5; detailed source and dictionary checks are in the RDM task card.
Impact: Progress metadata only; no dictionary registration, running data migration, or template publication.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration project entry aligned with the owner-approved pilot package while preserving the unpublished state.
Evidence: SELF RDM make test passed on e21a82b; owner acceptance and four artifact digests are recorded in the RDM task card.
Impact: Progress metadata only; E1, F01/F02 purpose, U1 completion and release remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the Dev project entry and task record aligned with the owner semantic decision and the RDM pilot package.
Evidence: SELF RDM make task-sync and GOWORK=off make test passed on df17ed1; the exact receipts are in the RDM task card.
Impact: Progress metadata only; E1 fidelity, publication, U2-U6, and deployment remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Finish Dev #488 with delivered Frontend and RDM objects, explicit audit grants in private browser fixtures, and owned process cleanup.
Evidence: Tool-imported SELF precheck, final sync, make test, and real-browser runs retain failures and passes; latest isolated runtime completed seven browser cases. Final exact-head GATE and independent parent Review follow.
Impact: Preserves other main components and existing CI jobs while the one final candidate is fixed for formal checks.
Refs: Dev PR #488; Frontend PR #73; RDM PR #301; queue Issue #518
Why: Keep the Dev project entry and task record aligned with the approved DHF implementation and saved U1 evidence.
Evidence: SELF make test passed on the Dev combination with Documents c256558; the complete output is in the task card.
Impact: Advances only the Documents pin and progress metadata; no template publication, migration, or deployment.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=f00165e8d71e4dc8ba0ceb7dc50c1a8a3deb6d60.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Prepare genuine Dev #488 for its final window using actually merged component versions and the authorized agent merge scope.
Evidence: Frontend PR 73 tree-identical merge and independent review; RDM PR 301 GATE3044, independent replay, Root merge ef510. Full Dev combination and exact-head CI remain pending.
Impact: Advances the frontend pin and task record only; current target main sync follows in the scheduled final window.
Refs: Dev PR #488; Frontend PR #73; RDM PR #301; Issue #518
Why: retain the approved status changes and current documentation while adopting the already approved manual delivery window after real platform validation.
Evidence: original startup, conflict resolution, combination test and writer inventory receipts are preserved in the task card; independent Doc89 and platform replay reports are referenced. Final candidate CI and review remain required.
Impact: publish the delivered Documents merge, manual trial policy and truthful capability state; keep all workflow triggers/checks and original task baseline unchanged.
Refs: Dev PR #489; Documents PR #89; Issue #518; approved merge queue implementation plan r1; user continuation authorization on 2026-10-14
Why: Resume the approved DHF work from saved planning artifacts and a clean task tree.
Evidence: Startup failure and combination-check receipts are retained in the task card.
Impact: Planning entry, task authorization and Documents composition only.
Refs: feature/dhf-template-pipeline-plan; DHF plan r0.1
Why: restore the assigned task against the current target while retaining its original baseline and all newer component capabilities.
Evidence: startup precheck and real parent/component sync receipts capture the original conflict; Documents PR89 was independently reviewed, merged by the agent, and its tree verified.
Impact: include origin/main and the delivered documentation merge 7bd4e17827d4c7c88647bf3c9199c495b60cb107 without rewriting task history or pushing waiting branches.
Refs: Dev PR #489; Documents PR #89; merge queue Issue #518; user takeover authorization on 2026-10-14