Why: include the current integration baseline before verification.
Evidence: fetched origin/main=f00165e8d71e4dc8ba0ceb7dc50c1a8a3deb6d60.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Prepare genuine Dev #488 for its final window using actually merged component versions and the authorized agent merge scope.
Evidence: Frontend PR 73 tree-identical merge and independent review; RDM PR 301 GATE3044, independent replay, Root merge ef510. Full Dev combination and exact-head CI remain pending.
Impact: Advances the frontend pin and task record only; current target main sync follows in the scheduled final window.
Refs: Dev PR #488; Frontend PR #73; RDM PR #301; Issue #518
Why: retain the approved status changes and current documentation while adopting the already approved manual delivery window after real platform validation.
Evidence: original startup, conflict resolution, combination test and writer inventory receipts are preserved in the task card; independent Doc89 and platform replay reports are referenced. Final candidate CI and review remain required.
Impact: publish the delivered Documents merge, manual trial policy and truthful capability state; keep all workflow triggers/checks and original task baseline unchanged.
Refs: Dev PR #489; Documents PR #89; Issue #518; approved merge queue implementation plan r1; user continuation authorization on 2026-10-14
Why: restore the assigned task against the current target while retaining its original baseline and all newer component capabilities.
Evidence: startup precheck and real parent/component sync receipts capture the original conflict; Documents PR89 was independently reviewed, merged by the agent, and its tree verified.
Impact: include origin/main and the delivered documentation merge 7bd4e17827d4c7c88647bf3c9199c495b60cb107 without rewriting task history or pushing waiting branches.
Refs: Dev PR #489; Documents PR #89; merge queue Issue #518; user takeover authorization on 2026-10-14
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=57bcb17ea212a531186b6e21617a7f3bea65a791.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-merge-queue-policy-draft.md(PR#519) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: The user requires all merges to follow agent-run synchronization, review, current-head CI and platform admission.
Evidence: Existing delivery stages and owner-only protection boundary reviewed; exact current Gitea Chinese labels verified from runtime resources.
Impact: Strengthen the merge executor rule only; retain human stage reviews, owner protection actions and actual CI requirements.
Refs: User instruction; merge-queue implementation plan U4/U5; Dev PR #519; Issue #518
Why: Close the delivered I1 task without modifying unrelated task records or shared workspaces.
Evidence: Dev PR 534 merged after all three exact-head CI jobs passed; RDM 360/362 and Documents 98/99 actual results and independent reviews are retained.
Impact: Archive this task card and preserve original receipts only; leave all worktrees, branches, production services and later IAM increments unchanged.
Refs: Dev PR 534; policy/delivery.md task closure authorization; IAM I1.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=e793e9804a1f5ecf49b29a40b4baac90ceb04e55.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Preserve independent final review and current-source equivalence before platform admission.
Evidence: Final document and integration metadata review has zero findings; full composition test and source equivalence receipts are retained with precise SELF object boundaries.
Impact: Delivery evidence only; no production, provider, guideline or document changes from the reviewed candidate.
Refs: IAM I1 integration task; Documents 98/99; RDM 360/362.
Why: Preserve actual component merge results and current delivery authorization before integration CI.
Evidence: RDM PR 360 merged at exact successful CI head; new Dev make test passed and independent metadata checks preserved approved digests and pins.
Impact: Clarify historical task records and current approved repair scope; preserve documentation and delivery evidence only.
Refs: Documents PRs 98 and 99; RDM PRs 360 and 362; IAM I1 task record.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=1e5c6b9c10ba77ed34663fd670138621a17342bd.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Carry the actual merged contract and approved permission implementation boundary into the integration composition.
Evidence: Documents PR 99 merged as a7ff466d9ae91fc67a53d2bf4991f47fc63a2a4c after independent review and verified source digest; RDM PR 360 preserves actual-actor projection semantics.
Impact: Update documentation pin, navigation and delivery records only; new composition tests and final-head CI remain required.
Refs: IAM I1 permission contract section 8; Documents PRs 98 and 99; RDM PR 360.
Why: the user confirmed acceptance in conversation on 2026-10-13; the archived
card should carry the verdict with an honest source label.
Evidence: user confirmation (conversation reply); automated ten-scenario replay
25/25 PASS rows on this card and PR #529.
Impact: archived task card note only.
Refs: task feature/rdm-increment-settings-duties (archived via #532).
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Record user acceptance and use the actual merged permission contract in the integration composition.
Evidence: Documents PR 98 merged as 3cf263962bd106529ee0531c8415cb16eecedfe3; independent document review and full SELF receipts retained in the task record.
Impact: Advance only Documents and delivery evidence; full IAM later increments and deployment remain outside scope.
Refs: Documents PR 98; IAM I1 U1-U2; policy/delivery.md stages 8-9.
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-rdm-increment-settings-duties.md(PR#529) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-d1-closeout-evidence.md(PR#517) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5aae47ebca20ad1f3add3b080212cca7e1c6edf9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Preserve the user-approved stage-7 conclusion before the final merge candidate is frozen.
Evidence: Import original precheck, sync, build, CI and independent replay receipts; validate current fixed components, document links and the incoming acceptance script syntax through make evidence.
Impact: Update this task card only; preserve implementation and activation boundaries. New HEAD CI remains required before merge.
Refs: Dev PR #519; Guidelines PR #5; Documents PR #96; queue Issue #518
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5aae47ebca20ad1f3add3b080212cca7e1c6edf9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=69c5c84d8a2f1a7966ebfb809cbb26d54e8e8abb.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=69c5c84d8a2f1a7966ebfb809cbb26d54e8e8abb.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Final fixed Documents composition and current modules passed their checks and now require the user acceptance decision.
Evidence: Complete SELF make test and document checks passed at4af5956; receipt5e81c91e and the independent RDM replay subjects are retained.
Impact: Record-only checkpoint after user stage 6 approval; do not claim stage 7 approval or shipping.
Refs: I1 bounded acceptance; policy/delivery.md
Why: Keep complete archive verification after the active card is moved.
Evidence: Original SELF synchronization and scoped diff receipts confirm no product or unrelated card changes.
Impact: Task records only.
Refs: Dev #526; RDM #354
Why: The approved base and downstream project membership delivery has reached its merge endpoint.
Evidence: Dev #526 and RDM #354 actual merge records, exact-head gates and independent reviews are preserved with original source labels.
Impact: Archive this task and record the separately authorized deployment follow-up; no product change, worktree cleanup or 8788 write.
Refs: Dev #526; RDM #354
Why: Keep the user-approved implementation and pending acceptance separate in the fixed integration records.
Evidence: Current Dev make test passed at10789653 and RDM combined checks passed at70e27b08; final text-only combination is verified next.
Impact: Documents and card records only; no permission source, pins in RDM, existing services or production data changes.
Refs: I1 stage 7 acceptance candidate
Why: task-sync flagged the earlier rows as recorded with uncommitted script
changes; the gate requires key checks re-run at a committed head.
Evidence: SELF row via make evidence - 25/25 PASS on a fresh rdm@84ca64f
disposable instance.
Impact: task card only.
Refs: task feature/rdm-increment-settings-duties.