Commit Graph
4252 Commits
Author SHA1 Message Date
weichen bd7ae9a892 Record U3a RDM delivery progress
Why: the member state machine (active/removed with migration backfill),
re-add reactivation, and the removed-member read-only passage through the
shared-domain authz (doc.read prerequisite decoupled) were delivered on the
RDM working branch 62c77ec; the Backend conversation read path (U3b) remains.

Evidence: build + members/projects/perms/rdmapp full suites green under the
-modfile overlay on 62c77ec.

Impact: task card only.

Refs: plan 2026-10-19-1440 U3; PR #634.
2026-10-20 02:21:43 +00:00
weichen c9f5fb2d49 Record the task card for feature-project-access-lifecycle-u3-member-history
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-project-access-lifecycle-u3-member-history.md; R0=f07a53d86aa10d35be0d3519fcf3c493b3391fec.

Impact: task metadata only; the feature workspace starts at c9ca59b195.

Refs: .task/feature-project-access-lifecycle-u3-member-history.md
2026-10-20 01:17:12 +00:00
weichen c9ca59b195 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 2m19s
ci / test-pg (pull_request) Failing after 2m31s
ci / test (pull_request) Successful in 7m50s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=f07a53d86aa10d35be0d3519fcf3c493b3391fec; before_record=d25b2f3287c6b875d03a8286a710454b37f5afb0.

Impact: task metadata only.

Refs: .task/feature-project-access-lifecycle.md
2026-10-20 01:16:00 +00:00
weichen d25b2f3287 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=f07a53d86aa10d35be0d3519fcf3c493b3391fec.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-20 01:15:22 +00:00
weichen 3784845a3b Merge the remote L1 state (U2 merge) into the local sync checkpoint
ci / svc-realcombo (pull_request) Successful in 2m24s
ci / test-pg (pull_request) Failing after 2m44s
ci / test (pull_request) Successful in 8m6s
2026-10-19 21:19:11 +00:00
weichen 03ab4d3c8b Merge pull request 'U2: enforce creator management authority in RDM projects' (#640) from feature/project-access-lifecycle-u2-creator-management into feature/project-access-lifecycle
ci / svc-realcombo (pull_request) Successful in 2m15s
ci / test-pg (pull_request) Failing after 2m36s
ci / test (pull_request) Successful in 7m57s
2026-10-19 21:18:04 +00:00
weichen 788f08b5d7 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m58s
ci / test-pg (pull_request) Skipped
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-project-access-lifecycle-u2-creator-management.md -> .task/archive/feature-project-access-lifecycle-u2-creator-management.md; status 已完成(合入前闭合); PR #640 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/640.
Impact: task metadata only; the card is archived within PR #640 and lands with its merge commit.
Refs: task.sh close --self
2026-10-19 21:09:39 +00:00
weichen c454d119c5 Record U2 review blockers fixed and verification
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 8m0s
Why: the independent reviewer blocked on a legacy-mode fail-open management
bypass and 13 skipped host-projection regression tests; the repair transport
aa1a7d2 enforces fail-closed in every mode and restores all 13 tests under
the new semantics (rdmapp full suite green, Skip count 0).

Evidence: /tmp/pal-u2-verify2.json.

Impact: task card only.

Refs: plan 2026-10-19-1440 U2; PR #634.
2026-10-19 21:09:15 +00:00
weichen 86ef6ad68c Record U2 RDM delivery and host verification
Why: the U2 RDM unit centralizes creator management authority (effective
project access + exact immutable createdBy; overrides can neither grant
management to others nor block the eligible creator) and was delivered on
the RDM working branch 853121d after an environment-heavy dispatch series
documented verbatim in the receipt row.

Evidence: /tmp/pal-u2-verify.json (package builds, perms/members/projects
tests, full rdmapp suite 4 packages ok, vet, clean tree).

Impact: task card only.

Refs: plan 2026-10-19-1440 U2; PR #634.
2026-10-19 20:34:40 +00:00
weichen f07a53d86a Merge pull request 'Close and archive the merged layered Python env card' (#638) from feature/card-close-layered-python-env-20261019 into main
ci / svc-realcombo (push) Successful in 2m30s
ci / test-pg (push) Successful in 9m0s
ci / test (push) Successful in 8m12s
2026-10-19 16:35:36 +00:00
weichen 4e3d5240e7 Record the task card for feature-project-access-lifecycle-u2-creator-management
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-project-access-lifecycle-u2-creator-management.md; R0=2b7fdc39a1f44163f4766701429d61ffd6926f1a.

Impact: task metadata only; the feature workspace starts at a32e2227b0.

Refs: .task/feature-project-access-lifecycle-u2-creator-management.md
2026-10-19 16:34:34 +00:00
weichen 5eb8591957 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=2b7fdc39a1f44163f4766701429d61ffd6926f1a; before_record=7fe701c379180d20691078236457874643835ec1.

Impact: task metadata only.

Refs: .task/feature-project-access-lifecycle.md
2026-10-19 16:33:44 +00:00
weichen 7fe701c379 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=2b7fdc39a1f44163f4766701429d61ffd6926f1a.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-19 16:33:00 +00:00
weichen a32e2227b0 Merge pull request 'U1: restrict role permissions to project access with R13 gate split' (#637) from feature/project-access-lifecycle-u1-role-project-access into feature/project-access-lifecycle
ci / svc-realcombo (pull_request) Successful in 2m39s
ci / test-pg (pull_request) Failing after 3m15s
ci / test (pull_request) Successful in 8m20s
2026-10-19 16:21:46 +00:00
weichenandCursor 0fba32ffbd Backfill the archived layered Python env card status
ci / svc-realcombo (pull_request) Successful in 2m26s
ci / test-pg (pull_request) Successful in 9m37s
ci / test (pull_request) Successful in 10m10s
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 16:11:27 +00:00
weichenandCursor d93f3c61cb Close and archive the merged layered Python env card
Why: PR #570 merged the branch into main, but its card still said unpushed and unmerged.
Evidence: merge commit 04acb027f6 contains 9c7fa27; precheck reported the branch as merged but not recycled.
Impact: .task only.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/570
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 16:11:16 +00:00
weichen 7e3d09faf9 Fold-close the task card before merge
ci / test-pg (pull_request) Skipped
ci / test (pull_request) Successful in 8m56s
ci / svc-realcombo (pull_request) Skipped
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-project-access-lifecycle-u1-role-project-access.md -> .task/archive/feature-project-access-lifecycle-u1-role-project-access.md; status 已完成(合入前闭合); PR #637 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/637.
Impact: task metadata only; the card is archived within PR #637 and lands with its merge commit.
Refs: task.sh close --self
2026-10-19 16:09:51 +00:00
weichen 0c5a5674d6 Record independent review closure and final composition
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Failing after 3s
ci / test-pg (pull_request) Skipped
Why: the independent reviewer blocked on the missing provider-failure test
scenario; the repair transport 03646b5 added it and the filtered suite
passes. pins2 mistakenly reverted the frontend pin and pins3 restored the
final composition (backend 03646b5 + frontend 2c19439).

Evidence: /tmp/pal-u1-affected3.json (test-affected exit 0 on 7519672).

Impact: task card only.

Refs: PR #634.
2026-10-19 16:09:27 +00:00
agent-exec-transport 75196728eb agent-exec transport 8e131e4c97857700601ef84749cea69e/f859169b4489 2026-10-19 16:08:20 +00:00
agent-exec-transport 8417e356db agent-exec transport f1fc92dcc0f0c67dbb8424a65d9ccb4c/ee07ab37e9bb 2026-10-19 16:07:10 +00:00
weichen 66578e778c Record U1 composition gate pass before independent review
Why: the composed child (backend cf9c35a + frontend 2c19439) passed
make test-affected; recording it fixes the dirty checkout that blocked the
review dispatch.

Evidence: /tmp/pal-u1-affected.json (exit 0).

Impact: task card only.

Refs: PR #634.
2026-10-19 15:51:34 +00:00
agent-exec-transport ef8d142a8a agent-exec transport 5aff33eabf4e1815994d44ec1c13abf3/36dd05125970 2026-10-19 15:49:29 +00:00
weichen 2fab81d3a6 Record U1 frontend delivery and verification
Why: the U1 frontend unit (single project-access checkbox gated by
system.roles.manage, legacy dual-control model removed, tests rewritten)
was delivered in one cursor dispatch and applied as transport 2c19439.

Evidence: /tmp/pal-u1b-verify2.json (vitest suites + design guard + tsc).

Impact: task card only.

Refs: plan 2026-10-19-1440 U1; PR #634.
2026-10-19 15:48:29 +00:00
weichen d2e78d53be Record U1 backend dispatch receipts and host verification
Why: the U1 backend unit (single project-access boolean, R13 gate split,
admin bypass removal, legacy-row normalization) was delivered after four
dispatches — two legitimate scope-expansions (old-model test files, scratch
dir), one cursor network failure — and applied as transport cf9c35a.

Evidence: /tmp/pal-u1a-verify.json (build, filtered tests, vet, clean tree).

Impact: task card only.

Refs: plan 2026-10-19-1440 U1; PR #634.
2026-10-19 15:41:44 +00:00
weichen 2b7fdc39a1 Merge pull request 'Add fast-slow completion signal evaluation for user decision' (#633) from feature/fast-slow-completion-signal-eval into main
ci / svc-realcombo (push) Successful in 4m13s
ci / test (push) Failing after 9m33s
ci / test-pg (push) Successful in 12m26s
2026-10-19 15:00:04 +00:00
weichen a455919908 Record the task card for feature-project-access-lifecycle-u1-role-project-access
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-project-access-lifecycle-u1-role-project-access.md; R0=3e70d76a20a6caf6f2edfd738a86f501c31064b6.

Impact: task metadata only; the feature workspace starts at a8557f27ed.

Refs: .task/feature-project-access-lifecycle-u1-role-project-access.md
2026-10-19 14:59:41 +00:00
weichen a8557f27ed Register the U1-U6 child units in the initiative card
ci / test (pull_request) Successful in 10m33s
ci / test-pg (pull_request) Successful in 13m14s
ci / svc-realcombo (pull_request) Successful in 3m38s
Why: task-start requires each child branch to be registered under a
## 子任务登记 section before it can start without a triage receipt; the
generated card lacked the section and the first insert did not match.

Impact: task card only.

Refs: PR #634.
2026-10-19 14:58:31 +00:00
weichen 442934379c Charter the project-access-lifecycle initiative with the approved plan
ci / test (pull_request) Failing after 8m52s
ci / test-pg (pull_request) Successful in 12m52s
ci / svc-realcombo (pull_request) Successful in 3m37s
Why: triage verdict NEW — the plan narrows role permissions to a single
project-access boolean and replaces the linked-capability role model that
the in-flight L1 #628 is delivering, so it ships as an independent
initiative; the charter registers U1-U6 with the R13 gate split and the
legacy-row normalization contract.

Evidence: precheck READY receipt /tmp/access-lifecycle-precheck2.json;
triage receipt /tmp/access-lifecycle-triage.json (verdict NEW).

Impact: plan document (docs/superpowers/plans, host-exempt) and task card.

Refs: plan 2026-10-19-1440; L1 #628 for the superseded model.
2026-10-19 14:56:57 +00:00
weichen 7a7685e07c Record the task card for feature-project-access-lifecycle
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-project-access-lifecycle.md; R0=3e70d76a20a6caf6f2edfd738a86f501c31064b6.

Impact: task metadata only; the feature workspace starts at 3e70d76a20.

Refs: .task/feature-project-access-lifecycle.md
2026-10-19 14:56:18 +00:00
weichen 928b0f8652 Merge authoritative main into the task branch
ci / svc-realcombo (pull_request) Successful in 2m40s
ci / test (pull_request) Successful in 8m48s
ci / test-pg (pull_request) Successful in 10m19s
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=3e70d76a20a6caf6f2edfd738a86f501c31064b6.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-19 14:48:38 +00:00
weichen 3e70d76a20 Merge pull request 'Record non-blocking follow-up fixes merged in Backend and Frontend' (#632) from fix/nonblocking-followups into main
ci / svc-realcombo (push) Successful in 2m49s
ci / test (push) Successful in 8m22s
ci / test-pg (push) Successful in 11m14s
2026-10-19 14:48:27 +00:00
weichen e88eaa0bd5 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 3m18s
ci / test (pull_request) Failing after 6m17s
ci / test-pg (pull_request) Successful in 11m37s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-fast-slow-completion-signal-eval.md -> .task/archive/feature-fast-slow-completion-signal-eval.md; status 已完成(合入前闭合); PR #633 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/633.
Impact: task metadata only; the card is archived within PR #633 and lands with its merge commit.
Refs: task.sh close --self
2026-10-19 14:34:55 +00:00
weichen 152310966e Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 3m32s
ci / test (pull_request) Successful in 10m18s
ci / test-pg (pull_request) Successful in 12m39s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/fix-nonblocking-followups.md -> .task/archive/fix-nonblocking-followups.md; status 已完成(合入前闭合); PR #632 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/632.
Impact: task metadata only; the card is archived within PR #632 and lands with its merge commit.
Refs: task.sh close --self
2026-10-19 14:34:53 +00:00
weichenandCursor 0b9d2aeee8 Record non-blocking follow-up fixes merged in Backend and Frontend
ci / svc-realcombo (pull_request) Successful in 3m11s
ci / test (pull_request) Failing after 8m12s
ci / test-pg (pull_request) Failing after 10m31s
Why: user selected the two non-blocking items for this round
Evidence: Backend #220 and Frontend #113 merged after PR HEAD CI success
Impact: task card only; Dev gitlinks unchanged
Refs: .task/fix-nonblocking-followups.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 14:34:40 +00:00
weichenandCursor 479095be47 Add fast-slow completion signal evaluation for user decision
ci / svc-realcombo (pull_request) Successful in 3m5s
ci / test (pull_request) Failing after 8m13s
ci / test-pg (pull_request) Successful in 11m29s
Why: user selected evaluating whether MiniMax tool_calls + Usage + clean EOF can count as completion
Evidence: r0.4/r0.5/r0.6 probe receipts; MiniMax OpenAPI spec fetched 2026-10-19
Impact: docs and task card only; no code or paid requests
Refs: .task/feature-fast-slow-completion-signal-eval.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 14:30:04 +00:00
weichen e3076a3fb3 Record the task card for feature-fast-slow-completion-signal-eval
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-fast-slow-completion-signal-eval.md; R0=46e331a7a81c94c6f5881c997ae0aca45664c830.

Impact: task metadata only; the feature workspace starts at 46e331a7a8.

Refs: .task/feature-fast-slow-completion-signal-eval.md
2026-10-19 14:28:50 +00:00
weichen e4f351a252 Record the task card for fix-nonblocking-followups
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-nonblocking-followups.md; R0=46e331a7a81c94c6f5881c997ae0aca45664c830.

Impact: task metadata only; the feature workspace starts at 46e331a7a8.

Refs: .task/fix-nonblocking-followups.md
2026-10-19 14:23:28 +00:00
weichen 46e331a7a8 Merge pull request 'Deliver progressive U2/U3 work with reliable sourced checkpoints' (#512) from feature/fast-slow-u2-u3-plan into main
ci / svc-realcombo (push) Successful in 2m20s
ci / test (push) Successful in 8m41s
ci / test-pg (push) Successful in 9m49s
2026-10-19 09:55:21 +00:00
weichenandCursor 5a56ff05f3 Record the super-admin component gap and its fix
ci / svc-realcombo (pull_request) Successful in 2m25s
ci / test (pull_request) Successful in 7m54s
ci / test-pg (pull_request) Successful in 9m8s
Why: CI run 4176 failed because Dev main pinned unmerged super-admin component commits.
Evidence: Backend #217 and Frontend #112 merged with CI success; make test-pins ok (SELF).
Impact: Task card only.
Refs: Dev #512, Backend #217, Frontend #112, merge queue #518
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 09:45:40 +00:00
agent-exec-transport c13db3f7cd agent-exec transport b48d03759562375b530772a16fba5dfc/6c9f33f40495 2026-10-19 09:45:18 +00:00
weichen b7aa30ae12 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 2m29s
ci / test-pg (pull_request) Failing after 2m39s
ci / test (pull_request) Successful in 8m14s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-fast-slow-u2-u3-plan.md -> .task/archive/feature-fast-slow-u2-u3-plan.md; status 已完成(合入前闭合); PR #512 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/512.
Impact: task metadata only; the card is archived within PR #512 and lands with its merge commit.
Refs: task.sh close --self
2026-10-19 09:30:49 +00:00
weichenandCursor caee2873a2 Add the status field to the fast-slow task card header
Why: task-close requires the standard status field.
Evidence: Header now carries PR and status fields.
Impact: Task card only.
Refs: Dev #512
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 09:30:48 +00:00
weichenandCursor 85cec99a91 Import the closing task-sync receipt
Why: Merge gate requires the task-sync evidence in the card.
Evidence: make task-sync changed=0 against main 198d189 (SELF, receipt sha256 241bf174).
Impact: Task card only.
Refs: Dev #512
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 09:30:37 +00:00
weichenandCursor 1134acb050 Record the fast-slow partial close and component merges
ci / svc-realcombo (pull_request) Successful in 2m31s
ci / test-pg (pull_request) Failing after 2m51s
ci / test (pull_request) Successful in 8m15s
Why: The user chose partial close after the r0.6 probe was INCONCLUSIVE.
Evidence: Component PRs merged at exact heads with CI success; Dev synced to main 198d189 with tree 062f5ac; make test-pins ok (SELF).
Impact: Task card only.
Refs: Dev #512, merge queue #518
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 09:29:22 +00:00
weichen fb2634a54c Merge feature/fast-slow-u2-u3-plan history after syncing main
ci / svc-realcombo (pull_request) Successful in 2m32s
ci / test-pg (pull_request) Failing after 2m48s
ci / test (pull_request) Successful in 8m13s
2026-10-19 09:28:58 +00:00
agent-exec-transport c26af5456b agent-exec transport 13e9c9807fd03b453a03da384041d045/c2d965af28b4 2026-10-19 09:28:51 +00:00
agent-exec-transport 626d430af4 agent-exec transport 526db2fd7bc00395a22bcf832cbec655/4cb5cec848ca
ci / svc-realcombo (pull_request) Successful in 2m14s
ci / test-pg (pull_request) Successful in 8m23s
ci / test (pull_request) Successful in 7m38s
2026-10-19 08:59:47 +00:00
weichen a63226f406 Record the r0.6 one-shot transport probe result
Why: The user approved stage 1 of the r0.6 resource proposal; the single paid probe has run.
Evidence: Private receipt 21bd00d0 (HTTP 200, tool_calls, clean_eof over http2_stream, length unknown, no [DONE], 472 tokens, zero tools); preflights 24/24 and 25/25 PASS (SELF); Dev 9366891 CI run 4135 (GATE); author and independent assessments agree INCONCLUSIVE.
Impact: Task card only; A01 is not eligible and the eight PRs stay drafts.
Refs: Documents #95, Dev #512
2026-10-19 08:58:47 +00:00
weichen 198d1891e4 Merge pull request 'Pin the regulations KB composition gate to RDM 8a396cf and KB a8dc714' (#631) from feature/regkb-components-pin-8a396cf into main
ci / svc-realcombo (push) Successful in 2m28s
ci / test (push) Successful in 7m54s
ci / test-pg (push) Successful in 9m23s
2026-10-19 08:32:19 +00:00
weichen 4f3dac4ee1 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 2m10s
ci / test-pg (pull_request) Successful in 8m54s
ci / test (pull_request) Successful in 8m0s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=38ac2b0687514b480cc61dec425e1affb37c6295; before_record=439678745324aad01570b05ac2bb085a0057ac32.

Impact: task metadata only.

Refs: .task/archive/feature-regkb-components-pin-8a396cf.md
2026-10-19 08:11:23 +00:00