Commit Graph
21 Commits
Author SHA1 Message Date
weichenandCursor c5e8b471b4 Correct final-only trigger analysis in C8 review
Why: independent review found the budget reserve also triggered final-only.
Evidence: provider-records outputCap 4000; material_final_reserve.go:21-30
Impact: docs and task card only.
Refs: feature/fast-slow-o2-c8-review
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 02:30:39 +00:00
weichenandCursor 511e07947b Record O2 C8 zero-paid review findings
Why: P2 A01 rerun failed on route contract C8; determine cause before any fix.
Evidence: docs/superpowers/specs/2026-10-21-fast-slow-o2-c8-review.md
Impact: docs and task card only; no code or paid runs.
Refs: feature/fast-slow-o2-c8-review
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 02:29:13 +00:00
weichenandCursor d0ae72f38d Clarify O2 A01 plan test fixtures and needs_user downgrade
ci / svc-realcombo (pull_request) Successful in 4m16s
ci / test (pull_request) Successful in 12m29s
ci / test-pg (pull_request) Successful in 19m38s
Why: The second independent review passed and left three clarifications
for the implementer.
Evidence: Review round 2 PASS at 6db2d614 (fresh session).
Impact: Docs and task card only.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/662

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 14:36:25 +00:00
weichenandCursor 6db2d614a4 Address review findings in O2 A01 evidence design and plan
ci / svc-realcombo (pull_request) Successful in 4m15s
ci / test (pull_request) Successful in 14m17s
ci / test-pg (pull_request) Successful in 19m1s
Why: Review found the design steered analysis findings to direct_relation,
which the host always downgrades, and the plan's eval/live command fails
without the live build tag.
Evidence: Verified against material_evidence.go and go list ./eval/live/;
the live-tag test runs offline (SELF).
Impact: Docs and task card only.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/662

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 14:31:44 +00:00
weichenandCursor 9c6c2f0f1e Add O2 A01 checkpoint evidence compliance design and plan
ci / svc-realcombo (pull_request) Successful in 6m55s
ci / test (pull_request) Successful in 12m36s
ci / test-pg (pull_request) Failing after 16m44s
Why: O2 P1 proved the route contract on the real route, but A01 stopped at
the first work checkpoint because the model mixed evidence modes and the
evaluation stops on any rejection. The user chose a zero-paid design that
tightens the tool guidance and lets the evaluation allow one correction.
Evidence: Offline replay of the A01 checkpoint against agent-system-core
reproduces "direct relation cannot have result" (SELF); design-only change.
Impact: Adds a design doc, an implementation plan and the task card; no
product code, paid request, instance config or deployment.
Refs: .task/feature-fast-slow-o2-a01-evidence-design.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 14:14:54 +00:00
weichen c70ebf53bf Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=adbef2f49c6c252a09449496afbdb6685201993b.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-20 08:07:32 +00:00
weichenandCursor 8d38562b34 task: record I2 stage 6 pass and Backend merge
Why: user passed stage 6; Backend #224 merged.
Evidence: Backend merge c164950, tree equals verified head 16f98b8
Impact: task card and review package only.
Refs: docs/superpowers/specs/2026-10-20-fast-slow-o2-i2-review.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 08:07:11 +00:00
weichenandCursor a5dcd1bdb1 task: record the I2 round 2 review pass
ci / svc-realcombo (pull_request) Successful in 3m17s
ci / test (pull_request) Failing after 11m8s
ci / test-pg (pull_request) Successful in 11m28s
Why: independent re-review of the receipt pass-through fix passed with no blockers.
Evidence: reviewer replay of live eval and runtime tests on 16f98b8
Impact: task card and review package only.
Refs: docs/superpowers/specs/2026-10-20-fast-slow-o2-i2-review.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 08:02:03 +00:00
weichenandCursor c20a664ba2 task: record I2b integration, Backend CI and draft the I2 stage 6 package
Why: follow-up unit closed the planned receipt pass-through gap; package prepared for user stage 6 review.
Evidence: Backend CI runs 4409/4410 on 16f98b8; /tmp/o2i2-20261020/o2-i2b-receipt.json
Impact: task card and review package only.
Refs: docs/superpowers/plans/2026-10-19-fast-slow-o2-route-contract-eof-plan.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 08:01:37 +00:00
weichenandCursor ec0bf4b42e Record O2 I1 stage 6 approval and Agent-Native merge
Why: The user approved O2 I1 at stage 6 on 2026-10-20, accepted the C2 numbering, and asked to start I2.
Evidence: Agent-Native #48 merged at 2fc66be after head 899fd70 status success; merged tree 720ec93 matches the pre-merge merge-tree.
Impact: Task card and review package only.
Refs: Agent-Native#48, Agent-System-Dev#647
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 05:54:51 +00:00
weichenandCursor c392be99dd Add the O2 I1 stage 6 review package
ci / svc-realcombo (pull_request) Successful in 5m26s
ci / test (pull_request) Successful in 10m15s
ci / test-pg (pull_request) Successful in 16m5s
Why: O2 I1 is implemented in Agent-Native #48 and needs user stage 6 review before merge.
Evidence: Worker attempt 2 success at 899fd70; host vet and tests (with -race) pass; PR #48 CI success; independent review PASS with no blocking issues.
Impact: Task card and review package only; Agent-Native #48 stays draft until stage 6 approval.
Refs: Agent-Native#48, Agent-System-Dev#639
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-20 05:44:01 +00:00
weichenandCursor 22cb4c1192 Apply independent review fixes to the O2 design and plan
ci / test (pull_request) Successful in 8m10s
ci / test-pg (pull_request) Successful in 9m17s
ci / svc-realcombo (pull_request) Successful in 2m39s
Why: independent review returned PASS-with-fixes with eight non-blocking clarifications.
Evidence: review session fdb9367a (fresh, docs-only input), base 2b7fdc3 head 5a7a0da.
Impact: docs and task card only.
Refs: docs/superpowers/specs/2026-10-19-fast-slow-o2-route-contract-eof-design.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 17:21:08 +00:00
weichenandCursor 5a7a0da711 Add fast-slow O2 route contract EOF design and plan for review
Why: user chose O2 in the completion signal evaluation; stage 4/5 docs precede any code.
Evidence: read-only code location in Agent-Native runtime/llm and Backend runtime (SELF).
Impact: docs only; no product code, no paid requests.
Refs: docs/superpowers/specs/2026-10-19-fast-slow-completion-signal-evaluation.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 16:40:43 +00:00
weichenandCursor 479095be47 Add fast-slow completion signal evaluation for user decision
ci / svc-realcombo (pull_request) Successful in 3m5s
ci / test (pull_request) Failing after 8m13s
ci / test-pg (pull_request) Successful in 11m29s
Why: user selected evaluating whether MiniMax tool_calls + Usage + clean EOF can count as completion
Evidence: r0.4/r0.5/r0.6 probe receipts; MiniMax OpenAPI spec fetched 2026-10-19
Impact: docs and task card only; no code or paid requests
Refs: .task/feature-fast-slow-completion-signal-eval.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-19 14:30:04 +00:00
weichenandCursor 06dd79cf9a Specify the regulations citation contract for U7
ci / test-pg (pull_request) Failing after 1m25s
ci / svc-realcombo (pull_request) Successful in 1m56s
ci / test (pull_request) Successful in 7m24s
Why: RDM and Frontend units must implement one citation interface.
Evidence: Derived from the merged U6 evidence batch model (RDM 703e41d) and current cockpit/inspect read models.
Impact: Spec only.
Refs: docs/superpowers/plans/2026-10-18-regulations-knowledge-base-plan.md U7
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-18 10:42:51 +00:00
weichenandCursor 4252c91952 Record the regulations corpus provenance and rights inventory
ci / svc-realcombo (pull_request) Successful in 2m22s
ci / test (pull_request) Successful in 7m27s
ci / test-pg (pull_request) Successful in 8m43s
Why: U1 of the regulations KB plan requires a verified import inventory before any schema or ingestion work.
Evidence: dump sha256 matches manifest; 2878/2907 originals hash-verified in a disposable pgvector container (SELF).
Impact: Spec only; no corpus data or product code changed.
Refs: docs/superpowers/plans/2026-10-18-regulations-knowledge-base-plan.md U1
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-18 09:21:36 +00:00
weichen 714d641be8 Document stock repos adoption matrix and new project admission spec
Why:
Provide phased rollout roadmap (Phases 1-5) for stock repositories and mandatory defaults for new projects under governance v2.

Evidence:
Specification documented in docs/superpowers/specs/2026-10-16-stock-repos-adoption-matrix.md.

Impact:
Clarifies U6 and U7 governance deliverables for multi-repo rollout without ambiguity.

Refs:
feature/development-governance-v2
2026-10-16 08:42:37 +00:00
weichen 24185ac066 Document shared executor architecture audit for governance v2
Why:
Audit differences between Agent-System-Dev agent_exec.py and Development-Manager runner.go to clarify layer responsibilities for governance v2.

Evidence:
Architecture specification document created in docs/superpowers/specs/.

Impact:
Provides guidance for U3 shared executor convergence without duplicating logic across repositories.

Refs:
feature/development-governance-v2
2026-10-16 07:16:07 +00:00
weichen d58d5bc1dd Review design docs and freeze cockpit contract decisions
Why: user approved the four design documents and authorized implementation
(/goal); the plan's section-7 tradeoffs gate the I1 public DTO and had to be
frozen before any implementation unit starts. A read-only audit of the RDM
backend (Agent-System-RDM main 5df66106) supplied the source facts.

Evidence: audit findings recorded in rollout section 7 (tree is doc->section
only, no confidence field, no persisted conflict entity, per-project event seq
complete); review fixes folded into the read-model contract (statReasons,
structuralGap, AssertionSummary); precheck receipt READY imported via
task-resume.

Impact: unlocks I1 implementation in the RDM repo; design deliverable ready
for PR/CI/merge; no business code, pins, database or deployment touched.

Refs: .task/feature-document-visualization-plan.md
2026-10-16 06:25:19 +00:00
weichen 5466f2cddb Document visualization cockpit design 2026-10-16 06:03:17 +00:00
weichen 5ff0a4d510 Design project-level execution agent routing
Why: Let each project route expensive implementation work across available Agent CLIs while the host model retains planning and delivery control.

Evidence: The specification passed placeholder, consistency, scope, path, and whitespace self-checks; implementation and runtime validation remain NOT_RUN.

Impact: Defines a review-only R1-R10 design for Markdown configuration, adapters, run-everything execution, receipts, recovery, and host fallback without enabling the new route.

Refs: .task/feature-goal-first-delivery.md
2026-10-15 01:45:15 +00:00