Why: The Dev project entry and task card still described only three accepted packages after the DI owner review.
Evidence: RDM DI catalog binds four exact hashes and RDM local tests/build passed at 9997990; Dev git diff --check receipt is in this task card.
Impact: Progress record only; Documents pin, publication state, deployment and runtime data are unchanged.
Refs: PROJECT.md; .task/feature-dhf-template-pipeline-plan.md
Why: Keep the integration entry aligned with the separate project-proposal, F01 and F02 package decisions.
Evidence: SELF RDM make test passed on 87fa010; owner four-hash decisions are recorded in the RDM task card.
Impact: Progress metadata only; 44 assets remain unpublished and 14 DOC fidelity reviews remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration task aligned with the two unpublished process-validation Word packages and their owner review boundary.
Evidence: SELF RDM make task-sync and GOWORK=off make test passed on 10933dc; receipts remain in the RDM task card.
Impact: Progress metadata only; no Documents pin, dictionary, live data, or publication change.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration project entry aligned with the owner F01/F02 purpose and stage decisions.
Evidence: SELF RDM make test passed on cdb66c5; detailed source and dictionary checks are in the RDM task card.
Impact: Progress metadata only; no dictionary registration, running data migration, or template publication.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration project entry aligned with the owner-approved pilot package while preserving the unpublished state.
Evidence: SELF RDM make test passed on e21a82b; owner acceptance and four artifact digests are recorded in the RDM task card.
Impact: Progress metadata only; E1, F01/F02 purpose, U1 completion and release remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the Dev project entry and task record aligned with the owner semantic decision and the RDM pilot package.
Evidence: SELF RDM make task-sync and GOWORK=off make test passed on df17ed1; the exact receipts are in the RDM task card.
Impact: Progress metadata only; E1 fidelity, publication, U2-U6, and deployment remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the Dev project entry and task record aligned with the approved DHF implementation and saved U1 evidence.
Evidence: SELF make test passed on the Dev combination with Documents c256558; the complete output is in the task card.
Impact: Advances only the Documents pin and progress metadata; no template publication, migration, or deployment.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Resume the approved DHF work from saved planning artifacts and a clean task tree.
Evidence: Startup failure and combination-check receipts are retained in the task card.
Impact: Planning entry, task authorization and Documents composition only.
Refs: feature/dhf-template-pipeline-plan; DHF plan r0.1
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-template-pipeline-plan.md; R0=add097d06137c4912a4ed9279e98ca353e4e4cf1.
Impact: task metadata only; the feature workspace starts at add097d061.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=57bcb17ea212a531186b6e21617a7f3bea65a791.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-merge-queue-policy-draft.md(PR#519) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: The user requires all merges to follow agent-run synchronization, review, current-head CI and platform admission.
Evidence: Existing delivery stages and owner-only protection boundary reviewed; exact current Gitea Chinese labels verified from runtime resources.
Impact: Strengthen the merge executor rule only; retain human stage reviews, owner protection actions and actual CI requirements.
Refs: User instruction; merge-queue implementation plan U4/U5; Dev PR #519; Issue #518
Why: Close the delivered I1 task without modifying unrelated task records or shared workspaces.
Evidence: Dev PR 534 merged after all three exact-head CI jobs passed; RDM 360/362 and Documents 98/99 actual results and independent reviews are retained.
Impact: Archive this task card and preserve original receipts only; leave all worktrees, branches, production services and later IAM increments unchanged.
Refs: Dev PR 534; policy/delivery.md task closure authorization; IAM I1.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=e793e9804a1f5ecf49b29a40b4baac90ceb04e55.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Preserve independent final review and current-source equivalence before platform admission.
Evidence: Final document and integration metadata review has zero findings; full composition test and source equivalence receipts are retained with precise SELF object boundaries.
Impact: Delivery evidence only; no production, provider, guideline or document changes from the reviewed candidate.
Refs: IAM I1 integration task; Documents 98/99; RDM 360/362.
Why: Preserve actual component merge results and current delivery authorization before integration CI.
Evidence: RDM PR 360 merged at exact successful CI head; new Dev make test passed and independent metadata checks preserved approved digests and pins.
Impact: Clarify historical task records and current approved repair scope; preserve documentation and delivery evidence only.
Refs: Documents PRs 98 and 99; RDM PRs 360 and 362; IAM I1 task record.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=1e5c6b9c10ba77ed34663fd670138621a17342bd.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Carry the actual merged contract and approved permission implementation boundary into the integration composition.
Evidence: Documents PR 99 merged as a7ff466d9ae91fc67a53d2bf4991f47fc63a2a4c after independent review and verified source digest; RDM PR 360 preserves actual-actor projection semantics.
Impact: Update documentation pin, navigation and delivery records only; new composition tests and final-head CI remain required.
Refs: IAM I1 permission contract section 8; Documents PRs 98 and 99; RDM PR 360.
Why: the user confirmed acceptance in conversation on 2026-10-13; the archived
card should carry the verdict with an honest source label.
Evidence: user confirmation (conversation reply); automated ten-scenario replay
25/25 PASS rows on this card and PR #529.
Impact: archived task card note only.
Refs: task feature/rdm-increment-settings-duties (archived via #532).
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Record user acceptance and use the actual merged permission contract in the integration composition.
Evidence: Documents PR 98 merged as 3cf263962bd106529ee0531c8415cb16eecedfe3; independent document review and full SELF receipts retained in the task record.
Impact: Advance only Documents and delivery evidence; full IAM later increments and deployment remain outside scope.
Refs: Documents PR 98; IAM I1 U1-U2; policy/delivery.md stages 8-9.
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-rdm-increment-settings-duties.md(PR#529) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-d1-closeout-evidence.md(PR#517) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5aae47ebca20ad1f3add3b080212cca7e1c6edf9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Preserve the user-approved stage-7 conclusion before the final merge candidate is frozen.
Evidence: Import original precheck, sync, build, CI and independent replay receipts; validate current fixed components, document links and the incoming acceptance script syntax through make evidence.
Impact: Update this task card only; preserve implementation and activation boundaries. New HEAD CI remains required before merge.
Refs: Dev PR #519; Guidelines PR #5; Documents PR #96; queue Issue #518
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5aae47ebca20ad1f3add3b080212cca7e1c6edf9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=69c5c84d8a2f1a7966ebfb809cbb26d54e8e8abb.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=69c5c84d8a2f1a7966ebfb809cbb26d54e8e8abb.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Final fixed Documents composition and current modules passed their checks and now require the user acceptance decision.
Evidence: Complete SELF make test and document checks passed at4af5956; receipt5e81c91e and the independent RDM replay subjects are retained.
Impact: Record-only checkpoint after user stage 6 approval; do not claim stage 7 approval or shipping.
Refs: I1 bounded acceptance; policy/delivery.md
Why: Keep complete archive verification after the active card is moved.
Evidence: Original SELF synchronization and scoped diff receipts confirm no product or unrelated card changes.
Impact: Task records only.
Refs: Dev #526; RDM #354