Why: card must reflect the re-sync, reviews and component merges before closing.
Evidence: card text only; CI and merge records refer to platform runs.
Impact: task card only.
Refs: Dev PR #626, Frontend PR #86, RDM PR #380
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d9ac28f89159e17781e2a8ef3094965130f29d2f.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: the user approved Frontend PR #86 stage 7 on 2026-10-14; the card still showed it pending.
Evidence: card text only.
Impact: task card only.
Refs: Frontend PR #86
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-regkb-corpus-wiring.md -> .task/archive/feature-regkb-corpus-wiring.md; status 已完成(合入前闭合); PR #625https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/625.
Impact: task metadata only; the card is archived within PR #625 and lands with its merge commit.
Refs: task.sh close --self
Why: Test evidence is written by make evidence.
Evidence: tests/integration/regulations-kb/run.sh PASS on rdm 377d427 / kb 393555b (SELF).
Impact: Task card only.
Refs: .task/feature-regkb-corpus-wiring.md
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=2d35fb6b1ad5e5de7c3e41e9c1af8531a329e2ab.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: fail-stop attempts are recorded before any new dispatch.
Evidence: /tmp/regkb-dev-pin-receipt.json terminal failed-unknown (timeout, no changes).
Impact: Task card only.
Refs: .task/feature-regkb-corpus-wiring.md
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation.md -> .task/archive/feature-norm-remediation.md; status 已完成(合入前闭合); PR #616https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/616.
Impact: task metadata only; the card is archived within PR #616 and lands with its merge commit.
Refs: task.sh close --self
Why: finish the approved U1-U7 delivery with accurate review and test provenance.
Evidence: preserve failed combination receipts and the successful unchanged-source continuation.
Impact: task metadata only; implementation remains at f52df0e.
Refs: PR #616; U1-U7 remediation plan
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Keep the approved plan accessible after task worktrees are recycled and mark all child delivery results.
Evidence: Plan snapshot matches original bytes; U6 #624 merged as 84aa411 with exact-head CI success.
Impact: Task and plan metadata only; final main verification remains pending.
Refs: PR #616
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u6.md -> .task/archive/feature-norm-remediation-u6.md; status 已完成(合入前闭合); PR #624https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/624.
Impact: task metadata only; the card is archived within PR #624 and lands with its merge commit.
Refs: task.sh close --self
Why: Preserve successful target synchronization after task metadata was saved.
Evidence: task-sync passed with changed=0 against 38c5b93; implementation paths unchanged from reviewed 847fb002.
Impact: Task record only; no candidate source changes.
Refs: PR #616
Why: Preserve the successful materialized dependency checks before final sync.
Evidence: Full receipt 079c7647661d7879 was imported by evidence; the earlier missing-dependency failure remains recorded.
Impact: Task metadata only.
Refs: PR #616
Why: include the current parent initiative baseline before verification.
Evidence: resolved feature/norm-remediation=38c5b93b79a8f383dbb7d7883b26d8432355a52c.
Impact: integrate parent initiative changes without rewriting task history.
Refs: task-sync
Why: Persist U5 and executor delivery results and the exact U6 continuation state.
Evidence: Merged Dev #623 and DM #27; controlled pin/document transports and local validators.
Impact: Task metadata only; final main delivery remains explicitly pending.
Refs: PR #616
Why: Bind the final adoption unit to reviewed merged Guidelines and executor revisions.
Evidence: Guidelines PR #11 a15db508; DM PR #27 6c019595 with independent review and exact-head CI.
Impact: Task metadata only; controlled gitlink transport remains required.
Refs: PR #616
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-norm-remediation-u6.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: task metadata only; the feature workspace starts at 69174fcb69.
Refs: .task/feature-norm-remediation-u6.md
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u5.md -> .task/archive/feature-norm-remediation-u5.md; status 已完成(合入前闭合); PR #623https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/623.
Impact: task metadata only; the card is archived within PR #623 and lands with its merge commit.
Refs: task.sh close --self
Why: include the current parent initiative baseline before verification.
Evidence: resolved feature/norm-remediation=2e5d98118fe436794d1267c5d2ab5ce5013d25ca.
Impact: integrate parent initiative changes without rewriting task history.
Refs: task-sync
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u7.md -> .task/archive/feature-norm-remediation-u7.md; status 已完成(合入前闭合); PR #622https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/622.
Impact: task metadata only; the card is archived within PR #622 and lands with its merge commit.
Refs: task.sh close --self
Why: Bind the two-file documentation unit to its approved authority and safety boundaries.
Evidence: U1-U4 prerequisite records; U4 merged in PR #621.
Impact: Task record only.
Refs: PR #616
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-norm-remediation-u5.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: task metadata only; the feature workspace starts at 825e4fc98f.
Refs: .task/feature-norm-remediation-u5.md
Why: include the current parent initiative baseline before verification.
Evidence: resolved feature/norm-remediation=825e4fc98f30da4950a48d15d59f5338206726bf.
Impact: integrate parent initiative changes without rewriting task history.
Refs: task-sync