Commit Graph
3789 Commits
Author SHA1 Message Date
weichen f61c53e7a3 Fold-close the task card before merge
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m19s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u7.md -> .task/archive/feature-norm-remediation-u7.md; status 已完成(合入前闭合); PR #622 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/622.
Impact: task metadata only; the card is archived within PR #622 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 17:50:22 +00:00
weichen ffbfecfe94 Record U7 integrated target checks
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m19s
Why: Fix the delivery target and preserve direct checks after U4 integration.

Evidence: task-sync merged 825e4fc; config validate and 14 focused tests passed on 3da20d4.

Impact: Task metadata only; no additional source changes.

Refs: PR #616
2026-10-18 17:50:08 +00:00
weichen 3da20d47b5 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=825e4fc98f30da4950a48d15d59f5338206726bf; before_record=66696bfc436a4adadf70fe7ecfc6ab4cda631d65.

Impact: task metadata only.

Refs: .task/feature-norm-remediation-u7.md
2026-10-18 17:48:16 +00:00
weichen 66696bfc43 Merge parent initiative feature/norm-remediation into the task branch
Why: include the current parent initiative baseline before verification.

Evidence: resolved feature/norm-remediation=825e4fc98f30da4950a48d15d59f5338206726bf.

Impact: integrate parent initiative changes without rewriting task history.

Refs: task-sync
2026-10-18 17:47:51 +00:00
weichen 825e4fc98f Merge pull request 'Protect fact-check credentials and verify precise failure claims' (#621) from feature/norm-remediation-u4 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m1s
ci / test (pull_request) Successful in 7m21s
ci / test-pg (pull_request) Successful in 7m44s
2026-10-18 17:47:38 +00:00
weichen 2de3d398cc Record U7 configuration checks and independent review
Why: Preserve bounded-work policy, actual model provenance, and honest validation limits.

Evidence: Configuration validate, six entry tests and fixed-diff independent PI review passed; actual events report MiniMax-M3.

Impact: Task metadata only; Guidelines pin/adoption remains in U6.

Refs: Guidelines PR #11, Dev PR #616
2026-10-18 17:42:55 +00:00
agent-exec-transport 892cf59c50 agent-exec transport 3f164db777f4fee27b17f3af4de05ab0/d8c8668687a0 2026-10-18 17:42:08 +00:00
weichen 4b718344c7 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m33s
ci / test-pg (pull_request) Skipped
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u4.md -> .task/archive/feature-norm-remediation-u4.md; status 已完成(合入前闭合); PR #621 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/621.
Impact: task metadata only; the card is archived within PR #621 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 17:38:14 +00:00
weichen a5318e58a9 Record U4 delivery sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Failing after 5m37s
Why: Preserve the current initiative sync and distinguish skipped tests accurately.

Evidence: task-sync merged c6fe5ad with task metadata only; implementation diff from 39834ead remains empty.

Impact: Task record only; candidate ready for exact-head CI.

Refs: PR #616
2026-10-18 17:37:52 +00:00
agent-exec-transport e16a75c511 agent-exec transport c4e7bcc1003fb3b60d968183cc9674cd/2e81d2e9845e 2026-10-18 17:37:43 +00:00
weichen e2da2fef9a Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=c6fe5adba34d7266e7bcfbb9a2c64a0ae61e9b8e; before_record=ddad7838535ae06070bfef973106e582c75c6380.

Impact: task metadata only.

Refs: .task/feature-norm-remediation-u4.md
2026-10-18 17:37:17 +00:00
weichen ddad783853 Merge parent initiative feature/norm-remediation into the task branch
Why: include the current parent initiative baseline before verification.

Evidence: resolved feature/norm-remediation=c6fe5adba34d7266e7bcfbb9a2c64a0ae61e9b8e.

Impact: integrate parent initiative changes without rewriting task history.

Refs: task-sync
2026-10-18 17:36:55 +00:00
weichen 53897dc218 Record U4 verification and independent review
Why: Preserve credential-boundary and truthful-fact verification before delivery.

Evidence: Eight offline tests and 503 governance tests passed (18 skipped); independent fresh PI review has no blocker.

Impact: Task record only; implementation remains at reviewed candidate 39834ead.

Refs: U4 remediation plan
2026-10-18 17:36:51 +00:00
weichen c16665365b Define U7 bounded execution scope
Why: Bind the Dev routing update to the approved context-capacity and handoff requirements.

Evidence: Guidelines PR #11 merged at a15db508 with independent review and exact-head CI.

Impact: Task metadata only; concrete project configuration remains pending.

Refs: PR #616
2026-10-18 17:36:15 +00:00
weichen ea8121b9b0 Record the task card for feature-norm-remediation-u7
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u7.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.

Impact: task metadata only; the feature workspace starts at c6fe5adba3.

Refs: .task/feature-norm-remediation-u7.md
2026-10-18 17:35:52 +00:00
agent-exec-transport 25cdc6adc8 agent-exec transport 03b4578a94b710425f11bd74df523a20/d0bfc2e77832 2026-10-18 17:33:03 +00:00
agent-exec-transport 39834ead7d agent-exec transport 3cbfba3aed64b516704b0d68a7a9f2fa/82da3fb3f31d 2026-10-18 17:28:55 +00:00
weichen c6fe5adba3 Preserve remediation milestone handoff
ci / svc-realcombo (pull_request) Successful in 2m8s
ci / test (pull_request) Successful in 7m32s
ci / test-pg (pull_request) Successful in 8m5s
Why: Persist verified U2/U3 results and bounded U4/U7 continuation facts at a phase boundary.

Evidence: Linked task records, transports, packets and external receipt paths; pending work remains explicit.

Impact: Task metadata only; no execution or delivery claim for pending units.

Refs: PR #616, PR #618, PR #620
2026-10-18 17:24:44 +00:00
weichen 9b29e0f6ec Record U4 first verification receipt
Why: Save offline verification before the final credential-boundary repair.

Evidence: Six offline fact verification tests and syntax/diff checks passed on 7e0b0e4.

Impact: SELF task record only.

Refs: U4 remediation plan
2026-10-18 17:22:38 +00:00
agent-exec-transport 7e0b0e4ff8 agent-exec transport 49a82f74c1def272b56afa8e0ac78c2e/97ab25ec9da4 2026-10-18 17:20:46 +00:00
weichen 804a5749cb Define U4 credential and fact verification scope
Why: Bind the worker to approved U4 paths and offline regression scenarios.

Evidence: U4 plan and strict READY receipt; parent head 6cee4c5.

Impact: Task metadata only.

Refs: PR #616
2026-10-18 17:17:27 +00:00
weichen 033aef5171 Record the task card for feature-norm-remediation-u4
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u4.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.

Impact: task metadata only; the feature workspace starts at 6cee4c5728.

Refs: .task/feature-norm-remediation-u4.md
2026-10-18 17:17:00 +00:00
weichen 6cee4c5728 Record U2 and U3 integration progress
ci / svc-realcombo (pull_request) Successful in 2m41s
ci / test (pull_request) Successful in 8m3s
ci / test-pg (pull_request) Successful in 8m53s
Why: Keep the initiative registry aligned with merged child PRs and the authorized U7 follow-up.

Evidence: PR #618 merged at fe0f1cd; PR #620 merged at feaf1b6.

Impact: Task metadata only; U4 is next.

Refs: PR #616
2026-10-18 17:15:51 +00:00
weichen feaf1b68fb Merge pull request 'Decouple task priority from integration topology' (#620) from feature/norm-remediation-u3 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m26s
ci / test (pull_request) Successful in 8m3s
ci / test-pg (pull_request) Successful in 8m44s
2026-10-18 17:15:06 +00:00
weichen 985afeeda4 Record U3 final target sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m32s
Why: Record the final pre-merge sync against the current initiative head.\nEvidence: make task-sync exited 0 with changed=0 at target fe0f1cd.\nImpact: Keep exact-target evidence with the archived task card.\nRefs: PR #620
2026-10-18 17:04:07 +00:00
weichen 532c7f3b60 Correct U3 target metadata
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m39s
Why: The child card must distinguish root main from its immediate initiative target.\nEvidence: Initiative PR #616 is open with base main; task-pr-check rejected the incorrect root_target.\nImpact: Restore correct target provenance without changing policy or gates.\nRefs: PR #620, PR #616
2026-10-18 17:02:54 +00:00
weichen 4c80fc3b0a Record U3 pre-merge closeout evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m20s
Why: Retain the SELF receipt for task-card closure in the archived U3 record.\nEvidence: task-close SELF=1 exited successfully for PR #620.\nImpact: Keep the pre-merge closeout reproducible without changing policy code.\nRefs: PR #620
2026-10-18 17:01:14 +00:00
weichen 1f34c35e44 Fold-close the task card before merge
ci / test (pull_request) Successful in 7m20s
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u3.md -> .task/archive/feature-norm-remediation-u3.md; status 已完成(合入前闭合); PR #620 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/620.
Impact: task metadata only; the card is archived within PR #620 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 17:00:45 +00:00
weichen 56d16ac458 Record U3 independent review and sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m22s
Why: Preserve the independent review receipt and latest initiative sync before task closure.\nEvidence: Fresh PI review found no blocking issue; task-sync reported changed=0 at the initiative target.\nImpact: Keep the L2-to-L1 handoff traceable.\nRefs: U3 remediation plan
2026-10-18 16:59:04 +00:00
agent-exec-transport cb582d170c agent-exec transport 995bd5f17433165f7fda25874b87f73e/364c25599d5d 2026-10-18 16:57:53 +00:00
weichen f4a95e5698 Record U3 task channel verification
Why: Record the approved U3 scope, worker transport, review, and affected checks.\nEvidence: make test-affected passed test-worktree and test-governance (495 passed, 18 skipped).\nImpact: Keep the child task auditable before L2-to-L1 delivery.\nRefs: U3 remediation plan
2026-10-18 16:54:43 +00:00
agent-exec-transport 98447e269c agent-exec transport ef41add06bee63d92fdd10ad80710aee/4bce0a1e4ce8 2026-10-18 16:47:21 +00:00
weichen d3223f5ec1 Record the task card for feature-norm-remediation-u3
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u3.md; R0=fe0f1cd4649f11b0d855ec39b882b8ca37fffb6b.

Impact: task metadata only; the feature workspace starts at fe0f1cd464.

Refs: .task/feature-norm-remediation-u3.md
2026-10-18 16:45:52 +00:00
weichen fe0f1cd464 Merge pull request 'Allow safe local task continuation (U2)' (#618) from feature/norm-remediation-u2 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m14s
ci / test (pull_request) Successful in 7m27s
ci / test-pg (pull_request) Successful in 8m6s
2026-10-18 16:43:37 +00:00
weichen b6e5bba91d Record U2 cached target review evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m32s
Why: Record the cached-target outage fix, host review, and final local verification for U2.\nEvidence: SELF receipts cover 84 focused tests and 495 governance tests; 18 checks skipped.\nImpact: Preserve exact-head delivery traceability without changing implementation.\nRefs: PR #618
2026-10-18 16:33:54 +00:00
agent-exec-transport a06209ff0a agent-exec transport dfbdcf8f9879479cec6791f6db4182b1/9e213bfbef61 2026-10-18 16:13:01 +00:00
weichen 398d12141c Record final U2 recovery gates and test evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Failing after 7m4s
Why: Preserve the final network-error classification, child-parent identity gate, and full governance test result.
Evidence: 83 focused tests and all 494 governance tests passed (18 skips) on the code candidate; child outage/missing-parent contrast tests passed.
Impact: New task and formal delivery gates remain strict; current PR head CI and final review are still required.
Refs: U2 / PR #618
2026-10-18 15:58:11 +00:00
agent-exec-transport 471948c59c agent-exec transport 7bc7519fb1dc6e9f12e152359a795c89/731d7f5ba3a5 2026-10-18 15:46:44 +00:00
agent-exec-transport bc304111a4 agent-exec transport ba0e59b31b8b4e18bc7e8df0ab680c80/ccf1734d8c5b 2026-10-18 15:41:58 +00:00
agent-exec-transport 59c27869bf agent-exec transport adeb3ec7854d8724c54dcac15493e3b5/523f5b51ad61 2026-10-18 15:26:49 +00:00
weichen 06b6ceea5f Record U2 offline resume and parent-reference closure
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m46s
Why: Preserve final root/child offline resume behavior and its reachable-parent-missing guard.
Evidence: 80 evidence/recovery tests and all 491 governance tests pass (18 expected skips) on the code candidate.
Impact: Local resume remains bounded; known missing remote parent refuses, network outage may use the registered local parent. Final-head CI remains required.
Refs: U2 / PR #618
2026-10-18 15:16:42 +00:00
agent-exec-transport 1059015958 agent-exec transport d47c50b0ed7fa9d2d7e0b4d58d5bd564/a79c762899de 2026-10-18 15:05:22 +00:00
agent-exec-transport 5b5537aa0f agent-exec transport 0579081fa29ea1bd6d1d532a7a177e36/f55c4a162b49 2026-10-18 14:58:04 +00:00
weichen 2fb7d2d30f Record offline resume and R0 comparison evidence
Why: Preserve host verification and worker transport records for offline root and child task resume.
Evidence: 79 evidence/recovery tests passed; governance validation is being rerun on the final implementation candidate.
Impact: LOCAL_READY remains local-only; exact-head CI and final independent review remain required.
Refs: U2 / PR #618
2026-10-18 14:55:31 +00:00
agent-exec-transport 1ff6444d33 agent-exec transport 2f332e8b99c2b13e0f8734136a777328/db30d3293d24 2026-10-18 14:34:23 +00:00
agent-exec-transport f81326bd08 agent-exec transport 7da469a725ec41f651cf89a8616adaa7/78f40f5a0c57 2026-10-18 14:25:10 +00:00
agent-exec-transport 8d8585afec agent-exec transport 2cd24625d2b60b7c6db7aa1bc628a9c0/af7e0b3bb4d6 2026-10-18 14:17:22 +00:00
agent-exec-transport fbb2aacb71 agent-exec transport 973ce511e924ce5ab0953e16e46a42ec/7671c49f7667 2026-10-18 14:04:13 +00:00
weichen 5b50d50b2a Record U2 unreachable and uncomparable target distinction
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m29s
Why: Preserve the final guard for a reachable advertised target whose commit object cannot be compared locally.
Evidence: The regression test, 74 focused evidence/recovery tests, and all 485 governance tests pass.
Impact: Network outages retain LOCAL_READY; known but unverified target history returns REMOTE_UNVERIFIED. Exact-head CI remains pending.
Refs: U2 / PR #618
2026-10-18 13:48:10 +00:00
agent-exec-transport 9c0e765708 agent-exec transport 3d1dd4ef1d7a2e761c3af308dc662a98/0cfaf24c9ad2 2026-10-18 13:37:32 +00:00