Why: include the current integration baseline before verification.
Evidence: fetched origin/main=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Keep the approved plan accessible after task worktrees are recycled and mark all child delivery results.
Evidence: Plan snapshot matches original bytes; U6 #624 merged as 84aa411 with exact-head CI success.
Impact: Task and plan metadata only; final main verification remains pending.
Refs: PR #616
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u6.md -> .task/archive/feature-norm-remediation-u6.md; status 已完成(合入前闭合); PR #624https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/624.
Impact: task metadata only; the card is archived within PR #624 and lands with its merge commit.
Refs: task.sh close --self
Why: Preserve successful target synchronization after task metadata was saved.
Evidence: task-sync passed with changed=0 against 38c5b93; implementation paths unchanged from reviewed 847fb002.
Impact: Task record only; no candidate source changes.
Refs: PR #616
Why: Preserve the successful materialized dependency checks before final sync.
Evidence: Full receipt 079c7647661d7879 was imported by evidence; the earlier missing-dependency failure remains recorded.
Impact: Task metadata only.
Refs: PR #616
Why: include the current parent initiative baseline before verification.
Evidence: resolved feature/norm-remediation=38c5b93b79a8f383dbb7d7883b26d8432355a52c.
Impact: integrate parent initiative changes without rewriting task history.
Refs: task-sync
Why: Persist U5 and executor delivery results and the exact U6 continuation state.
Evidence: Merged Dev #623 and DM #27; controlled pin/document transports and local validators.
Impact: Task metadata only; final main delivery remains explicitly pending.
Refs: PR #616
Why: Bind the final adoption unit to reviewed merged Guidelines and executor revisions.
Evidence: Guidelines PR #11 a15db508; DM PR #27 6c019595 with independent review and exact-head CI.
Impact: Task metadata only; controlled gitlink transport remains required.
Refs: PR #616
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-norm-remediation-u6.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: task metadata only; the feature workspace starts at 69174fcb69.
Refs: .task/feature-norm-remediation-u6.md
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u5.md -> .task/archive/feature-norm-remediation-u5.md; status 已完成(合入前闭合); PR #623https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/623.
Impact: task metadata only; the card is archived within PR #623 and lands with its merge commit.
Refs: task.sh close --self
Why: include the current parent initiative baseline before verification.
Evidence: resolved feature/norm-remediation=2e5d98118fe436794d1267c5d2ab5ce5013d25ca.
Impact: integrate parent initiative changes without rewriting task history.
Refs: task-sync
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u7.md -> .task/archive/feature-norm-remediation-u7.md; status 已完成(合入前闭合); PR #622https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/622.
Impact: task metadata only; the card is archived within PR #622 and lands with its merge commit.
Refs: task.sh close --self
Why: Bind the two-file documentation unit to its approved authority and safety boundaries.
Evidence: U1-U4 prerequisite records; U4 merged in PR #621.
Impact: Task record only.
Refs: PR #616
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-norm-remediation-u5.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: task metadata only; the feature workspace starts at 825e4fc98f.
Refs: .task/feature-norm-remediation-u5.md
Why: include the current parent initiative baseline before verification.
Evidence: resolved feature/norm-remediation=825e4fc98f30da4950a48d15d59f5338206726bf.
Impact: integrate parent initiative changes without rewriting task history.
Refs: task-sync
Why: Preserve bounded-work policy, actual model provenance, and honest validation limits.
Evidence: Configuration validate, six entry tests and fixed-diff independent PI review passed; actual events report MiniMax-M3.
Impact: Task metadata only; Guidelines pin/adoption remains in U6.
Refs: Guidelines PR #11, Dev PR #616
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u4.md -> .task/archive/feature-norm-remediation-u4.md; status 已完成(合入前闭合); PR #621https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/621.
Impact: task metadata only; the card is archived within PR #621 and lands with its merge commit.
Refs: task.sh close --self
Why: include the current parent initiative baseline before verification.
Evidence: resolved feature/norm-remediation=c6fe5adba34d7266e7bcfbb9a2c64a0ae61e9b8e.
Impact: integrate parent initiative changes without rewriting task history.
Refs: task-sync
Why: Preserve credential-boundary and truthful-fact verification before delivery.
Evidence: Eight offline tests and 503 governance tests passed (18 skipped); independent fresh PI review has no blocker.
Impact: Task record only; implementation remains at reviewed candidate 39834ead.
Refs: U4 remediation plan
Why: Bind the Dev routing update to the approved context-capacity and handoff requirements.
Evidence: Guidelines PR #11 merged at a15db508 with independent review and exact-head CI.
Impact: Task metadata only; concrete project configuration remains pending.
Refs: PR #616
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-norm-remediation-u7.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: task metadata only; the feature workspace starts at c6fe5adba3.
Refs: .task/feature-norm-remediation-u7.md
Why: Save offline verification before the final credential-boundary repair.
Evidence: Six offline fact verification tests and syntax/diff checks passed on 7e0b0e4.
Impact: SELF task record only.
Refs: U4 remediation plan
Why: Bind the worker to approved U4 paths and offline regression scenarios.
Evidence: U4 plan and strict READY receipt; parent head 6cee4c5.
Impact: Task metadata only.
Refs: PR #616
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-norm-remediation-u4.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: task metadata only; the feature workspace starts at 6cee4c5728.
Refs: .task/feature-norm-remediation-u4.md