Spec sync update via Documents PR #117 (records/2026-10-19-iam-u1-u7-implementation-record.md)
U7C knowledge-and-doc-shared-reads closure (already covered by RDM main tests)
Final status snapshot (Dev f979170, Backend adc2348, RDM 5dc88e2, Frontend 096947f)
Refs: /tmp/iam-role-permission-plan-20261019-sqfu_4g4/plan.md revision 3; Dev main ac594c9 (PR #643); Agent-System-Dev main f979170.
## Plan
Final cleanup record for L1 IAM plan revision 3 (Project Collaboration and Linked Permissions).
## Contents
- L1 binary migration verification (U1 admin user/role/project + U3A /api/capability/explain DTO confirmed working)
- Spec sync update via Documents PR #117 (records/2026-10-19-iam-u1-u7-implementation-record.md)
- U7C knowledge-and-doc-shared-reads closure (already covered by RDM main tests)
- Final status snapshot (Dev f979170, Backend adc2348, RDM 5dc88e2, Frontend 096947f)
Refs: /tmp/iam-role-permission-plan-20261019-sqfu_4g4/plan.md revision 3; Dev main ac594c9 (PR #643); Agent-System-Dev main f979170.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=aa9f98d2e5b8ce36724f881752b0a95a353df987.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: task-sync/evidence tooling locates a task card by its branch metadata line; the summary-only card was invisible to the card lookup and its sync record could not be recorded.
Evidence: card header added (R0 f979170, standalone, accepting_requirements=false); task-sync rerun after this commit writes the sync receipt into the card.
Impact: Task card bookkeeping only.
Refs: Dev PR #650
Why: The merge gate requires a fresh authoritative-main sync recorded in the task card before merging into main.
Evidence: make evidence receipt appended; task-sync re-verified sync_base=aa9f98d (current main) changed=0 at 2026-10-20T11:53:24Z.
Impact: Task card bookkeeping only.
Refs: Dev PR #650
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Plan
Final cleanup record for L1 IAM plan revision 3 (Project Collaboration and Linked Permissions).
Contents
f979170, Backend adc2348, RDM 5dc88e2, Frontend 096947f)Refs: /tmp/iam-role-permission-plan-20261019-sqfu_4g4/plan.md revision 3; Dev main
ac594c9(PR #643); Agent-System-Dev mainf979170.