Pin the Backend eval contract fail-fast and record O2 P1 #656

Merged
weichen merged 5 commits from feature/fast-slow-o2-p1 into main 2026-10-20 12:44:22 +00:00
Owner

Why: O2 P1 (plan docs/superpowers/plans/2026-10-19-fast-slow-o2-route-contract-eof-plan.md §5) — the approved paid verification needs the Backend eval fail-fast (Backend #229) pinned in Dev, and the P1 results recorded.

Evidence: Task card .task/feature-fast-slow-o2-p1.md (same document as this PR description): agent-exec unit receipts, contract probe result (route_contract_released, 487 tokens), evidence blocks. CI on the exact PR HEAD is authoritative.

Impact: modules/backend d8923f1 → 74e5396 (Backend #228 multiuser collaboration follow-ups from another session, #229 live-tag eval fail-fast). Nested agent-native/agent-squad/agent-intent pins unchanged; check-pins ok.

Refs: Backend #229; approved P1 resource proposal sha256 03f401b4…

Why: O2 P1 (plan docs/superpowers/plans/2026-10-19-fast-slow-o2-route-contract-eof-plan.md §5) — the approved paid verification needs the Backend eval fail-fast (Backend #229) pinned in Dev, and the P1 results recorded. Evidence: Task card `.task/feature-fast-slow-o2-p1.md` (same document as this PR description): agent-exec unit receipts, contract probe result (route_contract_released, 487 tokens), evidence blocks. CI on the exact PR HEAD is authoritative. Impact: modules/backend d8923f1 → 74e5396 (Backend #228 multiuser collaboration follow-ups from another session, #229 live-tag eval fail-fast). Nested agent-native/agent-squad/agent-intent pins unchanged; check-pins ok. Refs: Backend #229; approved P1 resource proposal sha256 03f401b4…
weichen added 3 commits 2026-10-20 12:12:42 +00:00
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-fast-slow-o2-p1.md; R0=873e957306a791eaa36e5251b45e3ed44a863143.

Impact: task metadata only; the feature workspace starts at 873e957306.

Refs: .task/feature-fast-slow-o2-p1.md
Record the P1 authorization, units and contract probe result
ci / svc-realcombo (pull_request) Successful in 3m18s
ci / test (pull_request) Successful in 9m7s
ci / test-pg (pull_request) Successful in 13m46s
a824b38d62
Why: The task card is the delivery record for the approved O2 P1 run.
Evidence: Probe terminal receipt route_contract_released; agent-exec receipts under /tmp/o2p1-20261020.
Impact: Task card only.
Refs: docs/superpowers/plans/2026-10-19-fast-slow-o2-route-contract-eof-plan.md section 5
Co-authored-by: Cursor <cursoragent@cursor.com>
weichen added 2 commits 2026-10-20 12:31:08 +00:00
Why: The approved P1 run finished; its outcome must be recorded before merge.
Evidence: Probe receipt route_contract_released; A01 provider records show route_contract_eof release then a rejected work checkpoint.
Impact: Task card only.
Refs: docs/superpowers/plans/2026-10-19-fast-slow-o2-route-contract-eof-plan.md section 5
Co-authored-by: Cursor <cursoragent@cursor.com>
Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 3m5s
ci / test (pull_request) Successful in 10m13s
ci / test-pg (pull_request) Successful in 12m34s
a1c1ff039a
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-fast-slow-o2-p1.md -> .task/archive/feature-fast-slow-o2-p1.md; status 已完成(合入前闭合); PR #656 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/656.
Impact: task metadata only; the card is archived within PR #656 and lands with its merge commit.
Refs: task.sh close --self
weichen merged commit 886283a4a5 into main 2026-10-20 12:44:22 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Dev#656