Backfill the archived O2 P1 task card records #658

Merged
weichen merged 3 commits from feature/fast-slow-o2-p1-card-backfill into main 2026-10-20 13:11:16 +00:00
Owner

Why: .task/archive/feature-fast-slow-o2-p1.md (Dev #656) was fold-closed with the planning, requirements, plan, stage, next-step and merge/cleanup sections still templated.

Evidence: Facts copied from Dev #656 / Backend #229 CI verdicts, merge commits and merge-window comments. Card .task/feature-fast-slow-o2-p1-card-backfill.md is the same document as this description.

Impact: Task cards only; no code or gitlink change.

Refs: Dev #656

Why: `.task/archive/feature-fast-slow-o2-p1.md` (Dev #656) was fold-closed with the planning, requirements, plan, stage, next-step and merge/cleanup sections still templated. Evidence: Facts copied from Dev #656 / Backend #229 CI verdicts, merge commits and merge-window comments. Card `.task/feature-fast-slow-o2-p1-card-backfill.md` is the same document as this description. Impact: Task cards only; no code or gitlink change. Refs: Dev #656
weichen added 2 commits 2026-10-20 12:56:15 +00:00
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-fast-slow-o2-p1-card-backfill.md; R0=886283a4a534de8c418fa4a60d2d7a5d15c0ccfb.

Impact: task metadata only; the feature workspace starts at 886283a4a5.

Refs: .task/feature-fast-slow-o2-p1-card-backfill.md
Backfill the archived O2 P1 task card records
ci / test-pg (pull_request) Failing after 5m39s
ci / svc-realcombo (pull_request) Successful in 6m13s
ci / test (pull_request) Successful in 9m43s
a9ef06c89b
Why: The O2 P1 card was fold-closed with planning, next-step and merge/cleanup sections still templated.
Evidence: Facts from Dev #656 and Backend #229 CI, merge and merge-window records.
Impact: Task cards only.
Refs: Dev #656
Co-authored-by: Cursor <cursoragent@cursor.com>
weichen added 1 commit 2026-10-20 12:56:23 +00:00
Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 5m57s
ci / test (pull_request) Successful in 9m33s
ci / test-pg (pull_request) Successful in 14m6s
38c5dc974b
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-fast-slow-o2-p1-card-backfill.md -> .task/archive/feature-fast-slow-o2-p1-card-backfill.md; status 已完成(合入前闭合); PR #658 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/658.
Impact: task metadata only; the card is archived within PR #658 and lands with its merge commit.
Refs: task.sh close --self
weichen merged commit daf02880bb into main 2026-10-20 13:11:16 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Dev#658