Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-rdm-two-trees-audit-plan.md; R0=5771d4f1e5b692bce95eb64cc30dc9931079ad12.
Impact: task metadata only; the feature workspace starts at 5771d4f1e5.
Refs: .task/feature-rdm-two-trees-audit-plan.md
Why: the user approved the bundled five stages and chose the two-tier admin model; the card must record the human review gate and both rulings.
Evidence: SELF doc-check receipt appended by make evidence (exit 0, ruled plan sha256 56c0fada60140decb40df0201599891b4702814746ed44a2c0197b4483e0763b); Documents ruling commit b857595.
Impact: task metadata only (task card); no code or submodule change.
Refs: .task/feature-rdm-two-trees-audit-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: the plan was approved and merged in Documents (PR #63); the Dev pin and planning entry must follow the approved master record.
Evidence: modules/documents gitlink d3e40c783d1a092b67d025303f28384a564548f4 (Documents PR #63 merge, SELF API query); task card backfilled with the user rulings and merge record.
Impact: documents gitlink, PROJECT.md planning entry, and task-card metadata only; no code change.
Refs: Documents PR #63; .task/feature-rdm-two-trees-audit-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=ec0169cad19c9525ce6ee4d7e26632351a5e5dbc.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
发布已获用户评审通过的 RDM 两树一网方案并完成 Dev 组合集成。
Why: 方案经用户五阶段一并评审通过,Dev 权威组合须钉入已合入的主记录并提供规划入口。
Evidence: SELF 文档检查(exit 0,r1 裁定版 sha256 56c0fada…)经 make evidence 写入任务卡;Documents PR #63 merged=True(API 查询);本 PR 由 CI 在 HEAD 运行 make test+make build(GATE)。
Impact: 仅 gitlink、PROJECT.md 与任务卡元数据;无代码变更。业务实施(U1 起)另行立项授权。
Refs: Documents PR #63;任务卡为 PR 与合入的同一份主记录