Publish the approved RDM two-trees plan and pin the Dev combination #330

Merged
weichen merged 12 commits from feature/rdm-two-trees-audit-plan into main 2026-10-11 05:43:27 +00:00
12 Commits
Author SHA1 Message Date
weichen 53fb06f3ab Record the sync checkpoint
ci / test (pull_request) Successful in 2m26s
ci / test-pg (pull_request) Successful in 57s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=ec0169cad19c9525ce6ee4d7e26632351a5e5dbc; candidate=cad3334d497e31a1f243a35881ec24f4959c2517.

Impact: task metadata only.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 05:28:18 +00:00
weichen cad3334d49 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=ec0169cad19c9525ce6ee4d7e26632351a5e5dbc.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:27:53 +00:00
weichen 155d260c98 Record the sync checkpoint
ci / test (pull_request) Successful in 2m23s
ci / test-pg (pull_request) Successful in 53s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab; candidate=80741d42d68788dad2b6f0191fd9fa82f0ca92e1.

Impact: task metadata only.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 05:15:26 +00:00
weichen 80741d42d6 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:15:02 +00:00
weichen 0876477918 Integrate the approved two-trees plan into the Dev combination
ci / test (pull_request) Successful in 2m22s
ci / test-pg (pull_request) Successful in 55s
Why: the plan was approved and merged in Documents (PR #63); the Dev pin and planning entry must follow the approved master record.

Evidence: modules/documents gitlink d3e40c783d1a092b67d025303f28384a564548f4 (Documents PR #63 merge, SELF API query); task card backfilled with the user rulings and merge record.

Impact: documents gitlink, PROJECT.md planning entry, and task-card metadata only; no code change.

Refs: Documents PR #63; .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:45:11 +00:00
weichen 02deea4329 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9; candidate=9c5aa1504df945824b55e593e17320b563569b67.

Impact: task metadata only.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:42:10 +00:00
weichen 9c5aa1504d Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 04:41:46 +00:00
weichen 55f2d31493 Record the approval rulings and review outcome in the task card
Why: the user approved the bundled five stages and chose the two-tier admin model; the card must record the human review gate and both rulings.

Evidence: SELF doc-check receipt appended by make evidence (exit 0, ruled plan sha256 56c0fada60140decb40df0201599891b4702814746ed44a2c0197b4483e0763b); Documents ruling commit b857595.

Impact: task metadata only (task card); no code or submodule change.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:41:40 +00:00
weichen 946a421166 Preserve the planning checks and review coverage
Why: retain the completed document checks, synchronized task baseline and review limits.

Evidence: tool-written SELF sync and document-check receipts; business verification remains NOT_RUN.

Impact: task metadata only; proposal remains a local pending-review Documents commit.

Refs: Documents b3171b3d51b385777710ab24f195d967bc5469f4
2026-10-11 04:06:33 +00:00
weichen ba48478f25 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=5771d4f1e5b692bce95eb64cc30dc9931079ad12; candidate=0f2e91f43d3dce1e684b6bc18299067b6e1e962a.

Impact: task metadata only.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:03:56 +00:00
weichen 0f2e91f43d Record the RDM traceability planning outcome
Why: preserve the source audit, proposal location and pending review boundaries.

Evidence: tool-written SELF precheck, source inspection and document checks; original sync refusal retained.

Impact: task metadata only; component pins and shared checkout unchanged.

Refs: Documents b3171b3d51b385777710ab24f195d967bc5469f4
2026-10-11 04:03:27 +00:00
weichen a14882c62e Record the task card for feature-rdm-two-trees-audit-plan
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-rdm-two-trees-audit-plan.md; R0=5771d4f1e5b692bce95eb64cc30dc9931079ad12.

Impact: task metadata only; the feature workspace starts at 5771d4f1e5.

Refs: .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 03:48:49 +00:00