Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c79a77db944b88fa7e817d632d5474bdac6d8c90.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: resolve the interrupted sync: take the reconciled Documents pin eb36571 (union of U2 progress and template/final-target plans) plus main's card/PROJECT updates.
Evidence: Documents PR #68 merge eb36571; gitlink conflict resolved to the superset tip.
Impact: task-branch integration merge only.
Refs: Documents #68; Dev #340/#354
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=0f589ed7ff5c1dc63a9700906fe9138fe607d85c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=ad892d58fcad5f6b206b9aa9acf3f6fca538775b.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=a70ed114fba2d51bb93ec8cb0662703ab0bc0614.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: the master record now records U2 as merged (Documents 559af219); the Dev gitlink and PROJECT.md entry must follow.
Evidence: Documents PR #67 merged=True (API); closeout doc check receipt in card; RDM PR #197 merge fe8a75b.
Impact: modules/documents gitlink, PROJECT.md planning entry, task card; no code change.
Refs: Documents PR #67; RDM PR #197/#198
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-rdm-u2-closeout.md; R0=866086c2a080716195c3dd35e6ef362016347c94.
Impact: task metadata only; the feature workspace starts at 866086c2a0.
Refs: .task/feature-rdm-u2-closeout.md