Harden OOXML registration gate to reference integrity #559

Merged
weichen merged 9 commits from feature/pptx-gate-reference-integrity into main 2026-10-15 03:33:08 +00:00
9 Commits
Author SHA1 Message Date
weichen 4cc480ab9a Resync and re-record evidence
ci / svc-realcombo (pull_request) Successful in 2m0s
ci / test (pull_request) Successful in 5m21s
ci / test-pg (pull_request) Successful in 7m51s
2026-10-15 03:24:37 +00:00
weichen a370a6d594 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=59cbf1109634b66c88f5b1702f330cd738aa75ef; before_record=bc52e40d81fb619437e42d5c84c2ccee88dc7ca1.

Impact: task metadata only.

Refs: .task/feature-pptx-gate-reference-integrity.md
2026-10-15 03:20:11 +00:00
weichen bc52e40d81 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=59cbf1109634b66c88f5b1702f330cd738aa75ef.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-15 03:19:41 +00:00
weichen d7f43acf31 Align multi-instance bootstrap with the U3 account contract
ci / svc-realcombo (pull_request) Successful in 1m58s
ci / test (pull_request) Successful in 5m18s
ci / test-pg (pull_request) Successful in 7m28s
Why: The multi-instance acceptance test still created alice with a literal
password; backend U3 replaced local password-bearing creation with trusted
pending-account activation, so the first pin bump past U3 failed test-pg
with RECOVERY_CONTRACT_REPLACED. The seam was left pending by the U3 task
and this PR is the first to cross it.

Evidence: Full TestTwoInstancesOverSharedPG passes against a disposable
PostgreSQL 16 container (identity ensure -> bootstrap-admin -> pending
create with activation key -> key redemption -> grant-setup password ->
api key -> all cross-instance scenarios, 15s).

Impact: Test-only bootstrap rewrite (deployment-level identity ensured once
per pair, admin bootstrapped first, alice activated through the key
redemption and grant-setup password flow); no product code changes.

Refs: Dev task feature/pptx-gate-reference-integrity; backend U3 #198
2026-10-15 03:11:08 +00:00
weichen 518c11e400 Re-record evidence at synced head
ci / svc-realcombo (pull_request) Successful in 2m27s
ci / test-pg (pull_request) Failing after 2m47s
ci / test (pull_request) Successful in 6m20s
2026-10-15 02:25:05 +00:00
weichen 986baa8962 Finalize task card review and verification 2026-10-15 02:20:06 +00:00
weichen 01fd9f8523 Record test and build evidence 2026-10-15 02:19:43 +00:00
weichen c61ecf98b1 Bump backend pin for gate upgrade and fill task card 2026-10-15 02:14:18 +00:00
weichen 1e6c1924c0 Record the task card for feature-pptx-gate-reference-integrity
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-pptx-gate-reference-integrity.md; R0=cc40e10f3b4b6e41cb3a7aa0826e08dd3b8b7270.

Impact: task metadata only; the feature workspace starts at cc40e10f3b.

Refs: .task/feature-pptx-gate-reference-integrity.md
2026-10-15 02:02:50 +00:00