Implement development norm remediation and bounded agent work #616

Merged
weichen merged 109 commits from feature/norm-remediation into main 2026-10-18 19:21:50 +00:00
109 Commits
Author SHA1 Message Date
weichen 1f18601274 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 2m10s
ci / test (pull_request) Successful in 7m36s
ci / test-pg (pull_request) Successful in 8m30s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation.md -> .task/archive/feature-norm-remediation.md; status 已完成(合入前闭合); PR #616 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/616.
Impact: task metadata only; the card is archived within PR #616 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 19:11:39 +00:00
weichen 5fae1888e7 Record final norm remediation verification
ci / svc-realcombo (pull_request) Successful in 2m4s
ci / test (pull_request) Successful in 7m37s
ci / test-pg (pull_request) Successful in 8m27s
Why: finish the approved U1-U7 delivery with accurate review and test provenance.

Evidence: preserve failed combination receipts and the successful unchanged-source continuation.

Impact: task metadata only; implementation remains at f52df0e.

Refs: PR #616; U1-U7 remediation plan
2026-10-18 19:09:05 +00:00
agent-exec-transport f52df0e2e6 agent-exec transport a843e40dbd0a9999047fd1c2d49d9ebd/e65c5571b4d1 2026-10-18 18:56:00 +00:00
weichen 6b5806078f Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=eef7e5e778cabcb6216f74b74213a3d7511f383b; before_record=fd00a06096a27750c76eb202ec5515d2ac9379b6.

Impact: task metadata only.

Refs: .task/feature-norm-remediation.md
2026-10-18 18:47:17 +00:00
weichen fd00a06096 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=eef7e5e778cabcb6216f74b74213a3d7511f383b.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-18 18:46:25 +00:00
weichen 3812031e6b Preserve approved plan and complete child registry
ci / svc-realcombo (pull_request) Successful in 2m15s
ci / test (pull_request) Successful in 7m40s
ci / test-pg (pull_request) Successful in 8m8s
Why: Keep the approved plan accessible after task worktrees are recycled and mark all child delivery results.

Evidence: Plan snapshot matches original bytes; U6 #624 merged as 84aa411 with exact-head CI success.

Impact: Task and plan metadata only; final main verification remains pending.

Refs: PR #616
2026-10-18 18:45:41 +00:00
weichen 84aa411fda Merge pull request 'Adopt reviewed Guidelines and executor revisions with accurate evidence' (#624) from feature/norm-remediation-u6 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m24s
ci / test (pull_request) Successful in 7m50s
ci / test-pg (pull_request) Successful in 8m34s
2026-10-18 18:45:02 +00:00
weichen aa9a9e18e9 Fold-close the task card before merge
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m46s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u6.md -> .task/archive/feature-norm-remediation-u6.md; status 已完成(合入前闭合); PR #624 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/624.
Impact: task metadata only; the card is archived within PR #624 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 18:35:53 +00:00
weichen a381f515d8 Record U6 clean final child sync
ci / svc-realcombo (pull_request) Skipped
ci / test-pg (pull_request) Skipped
ci / test (pull_request) Successful in 7m30s
Why: Preserve successful target synchronization after task metadata was saved.

Evidence: task-sync passed with changed=0 against 38c5b93; implementation paths unchanged from reviewed 847fb002.

Impact: Task record only; no candidate source changes.

Refs: PR #616
2026-10-18 18:35:25 +00:00
weichen 20c8fd00f6 Record materialized U6 verification receipt
Why: Preserve the successful materialized dependency checks before final sync.

Evidence: Full receipt 079c7647661d7879 was imported by evidence; the earlier missing-dependency failure remains recorded.

Impact: Task metadata only.

Refs: PR #616
2026-10-18 18:34:27 +00:00
weichen 45ea82951f Merge parent initiative feature/norm-remediation into the task branch
Why: include the current parent initiative baseline before verification.

Evidence: resolved feature/norm-remediation=38c5b93b79a8f383dbb7d7883b26d8432355a52c.

Impact: integrate parent initiative changes without rewriting task history.

Refs: task-sync
2026-10-18 18:33:34 +00:00
weichen 2dde6e6c0d Record U6 fixed adoption verification
Why: Preserve controlled pin provenance, independent review and honest validation limits.

Evidence: Materialized config/governance/pins and 14 focused tests passed on 847fb002; scoped independent review approved.

Impact: Task record only; full main-composition verification remains at L1 final candidate.

Refs: PR #616, Guidelines #11, DM #27
2026-10-18 18:33:31 +00:00
agent-exec-transport 847fb00222 agent-exec transport de195d91b85f6775bdd03cfbd10335b4/c119872546a1 2026-10-18 18:31:24 +00:00
weichen 38c5b93b79 Record final adoption handoff and prerequisites
ci / svc-realcombo (pull_request) Successful in 2m0s
ci / test (pull_request) Successful in 7m32s
ci / test-pg (pull_request) Successful in 7m50s
Why: Persist U5 and executor delivery results and the exact U6 continuation state.

Evidence: Merged Dev #623 and DM #27; controlled pin/document transports and local validators.

Impact: Task metadata only; final main delivery remains explicitly pending.

Refs: PR #616
2026-10-18 18:29:16 +00:00
agent-exec-transport 30f1ba7596 agent-exec transport 784bbb17249cbafbbe0b175ffedc8d0e/2d4460afee16 2026-10-18 18:26:17 +00:00
agent-exec-transport 97745ca387 agent-exec transport 894b87c98892e9529639900a7a15191f/b3e2d02a91b9 2026-10-18 18:22:17 +00:00
weichen 19b5056a0e Define U6 fixed-version adoption scope
Why: Bind the final adoption unit to reviewed merged Guidelines and executor revisions.

Evidence: Guidelines PR #11 a15db508; DM PR #27 6c019595 with independent review and exact-head CI.

Impact: Task metadata only; controlled gitlink transport remains required.

Refs: PR #616
2026-10-18 18:21:25 +00:00
weichen 9d56df8b49 Record the task card for feature-norm-remediation-u6
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u6.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.

Impact: task metadata only; the feature workspace starts at 69174fcb69.

Refs: .task/feature-norm-remediation-u6.md
2026-10-18 18:20:28 +00:00
weichen 69174fcb69 Merge pull request 'Route project rules through concise authoritative entrypoints' (#623) from feature/norm-remediation-u5 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m1s
ci / test (pull_request) Successful in 7m29s
ci / test-pg (pull_request) Successful in 8m10s
2026-10-18 18:16:30 +00:00
weichen 68233fd503 Fold-close the task card before merge
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m38s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u5.md -> .task/archive/feature-norm-remediation-u5.md; status 已完成(合入前闭合); PR #623 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/623.
Impact: task metadata only; the card is archived within PR #623 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 18:05:30 +00:00
weichen ca52f434bb Record U5 synchronized delivery checks
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m46s
Why: Preserve final authority/configuration checks after U7 integration.

Evidence: task-sync merged 2e5d981; entrypoint files unchanged from reviewed 1b04fd4; config and link checks passed.

Impact: Task metadata only.

Refs: PR #616
2026-10-18 18:05:19 +00:00
weichen 45bcba0829 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=2e5d98118fe436794d1267c5d2ab5ce5013d25ca; before_record=405d00ba05cdf3db643d2bc4d35a8aaf92ed0370.

Impact: task metadata only.

Refs: .task/feature-norm-remediation-u5.md
2026-10-18 18:03:01 +00:00
weichen 405d00ba05 Merge parent initiative feature/norm-remediation into the task branch
Why: include the current parent initiative baseline before verification.

Evidence: resolved feature/norm-remediation=2e5d98118fe436794d1267c5d2ab5ce5013d25ca.

Impact: integrate parent initiative changes without rewriting task history.

Refs: task-sync
2026-10-18 18:02:31 +00:00
weichen 92c74cee99 Record U5 authority checks and independent review
Why: Preserve entrypoint scope, rule consistency and verification limits before delivery.

Evidence: Fixed-diff independent PI review has no blocker; host authority targets and diff checks passed.

Impact: Task metadata only; no broad prose mirror tests added.

Refs: PR #616
2026-10-18 18:02:27 +00:00
agent-exec-transport d0ae825547 agent-exec transport bc130d2da03be945bab6afc5cad0a1df/5f6c2d373b6c 2026-10-18 18:01:13 +00:00
weichen 2e5d98118f Record U4 and U7 integration milestones
ci / svc-realcombo (pull_request) Successful in 2m17s
ci / test (pull_request) Failing after 7m7s
ci / test-pg (pull_request) Successful in 8m16s
Why: Persist completed normative work and the concrete U6 execution prerequisite.

Evidence: Merged child PRs #621 and #622; Guidelines PR #11; bounded DM repair receipts and independent U5 review remain explicit.

Impact: Task metadata only; no completion claim for U5/U6 or pending tool repair.

Refs: PR #616
2026-10-18 18:01:00 +00:00
weichen 2ce6bc9dfb Merge pull request 'Bound CLI tasks and preserve model-aware phase handoffs' (#622) from feature/norm-remediation-u7 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m12s
ci / test (pull_request) Successful in 7m42s
ci / test-pg (pull_request) Successful in 8m19s
2026-10-18 18:00:19 +00:00
agent-exec-transport 1b04fd4a04 agent-exec transport 14d2ac0fdd84c5730977b08931b20f33/e50bd60abf55 2026-10-18 17:56:21 +00:00
agent-exec-transport 36103dc62d agent-exec transport cf4fb0102e06376a0064e0c98ad916d5/4cd636618802 2026-10-18 17:53:36 +00:00
agent-exec-transport 832bee2053 agent-exec transport 7aa236e24b902ce9a8710d8f03f70165/2c3c97021f49 2026-10-18 17:51:40 +00:00
weichen f61c53e7a3 Fold-close the task card before merge
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m19s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u7.md -> .task/archive/feature-norm-remediation-u7.md; status 已完成(合入前闭合); PR #622 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/622.
Impact: task metadata only; the card is archived within PR #622 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 17:50:22 +00:00
weichen ffbfecfe94 Record U7 integrated target checks
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m19s
Why: Fix the delivery target and preserve direct checks after U4 integration.

Evidence: task-sync merged 825e4fc; config validate and 14 focused tests passed on 3da20d4.

Impact: Task metadata only; no additional source changes.

Refs: PR #616
2026-10-18 17:50:08 +00:00
weichen 741bd45ede Define U5 entrypoint simplification scope
Why: Bind the two-file documentation unit to its approved authority and safety boundaries.

Evidence: U1-U4 prerequisite records; U4 merged in PR #621.

Impact: Task record only.

Refs: PR #616
2026-10-18 17:49:19 +00:00
weichen c46b326442 Record the task card for feature-norm-remediation-u5
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u5.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.

Impact: task metadata only; the feature workspace starts at 825e4fc98f.

Refs: .task/feature-norm-remediation-u5.md
2026-10-18 17:48:21 +00:00
weichen 3da20d47b5 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=825e4fc98f30da4950a48d15d59f5338206726bf; before_record=66696bfc436a4adadf70fe7ecfc6ab4cda631d65.

Impact: task metadata only.

Refs: .task/feature-norm-remediation-u7.md
2026-10-18 17:48:16 +00:00
weichen 66696bfc43 Merge parent initiative feature/norm-remediation into the task branch
Why: include the current parent initiative baseline before verification.

Evidence: resolved feature/norm-remediation=825e4fc98f30da4950a48d15d59f5338206726bf.

Impact: integrate parent initiative changes without rewriting task history.

Refs: task-sync
2026-10-18 17:47:51 +00:00
weichen 825e4fc98f Merge pull request 'Protect fact-check credentials and verify precise failure claims' (#621) from feature/norm-remediation-u4 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m1s
ci / test (pull_request) Successful in 7m21s
ci / test-pg (pull_request) Successful in 7m44s
2026-10-18 17:47:38 +00:00
weichen 2de3d398cc Record U7 configuration checks and independent review
Why: Preserve bounded-work policy, actual model provenance, and honest validation limits.

Evidence: Configuration validate, six entry tests and fixed-diff independent PI review passed; actual events report MiniMax-M3.

Impact: Task metadata only; Guidelines pin/adoption remains in U6.

Refs: Guidelines PR #11, Dev PR #616
2026-10-18 17:42:55 +00:00
agent-exec-transport 892cf59c50 agent-exec transport 3f164db777f4fee27b17f3af4de05ab0/d8c8668687a0 2026-10-18 17:42:08 +00:00
weichen 4b718344c7 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m33s
ci / test-pg (pull_request) Skipped
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u4.md -> .task/archive/feature-norm-remediation-u4.md; status 已完成(合入前闭合); PR #621 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/621.
Impact: task metadata only; the card is archived within PR #621 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 17:38:14 +00:00
weichen a5318e58a9 Record U4 delivery sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Failing after 5m37s
Why: Preserve the current initiative sync and distinguish skipped tests accurately.

Evidence: task-sync merged c6fe5ad with task metadata only; implementation diff from 39834ead remains empty.

Impact: Task record only; candidate ready for exact-head CI.

Refs: PR #616
2026-10-18 17:37:52 +00:00
agent-exec-transport e16a75c511 agent-exec transport c4e7bcc1003fb3b60d968183cc9674cd/2e81d2e9845e 2026-10-18 17:37:43 +00:00
weichen e2da2fef9a Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=c6fe5adba34d7266e7bcfbb9a2c64a0ae61e9b8e; before_record=ddad7838535ae06070bfef973106e582c75c6380.

Impact: task metadata only.

Refs: .task/feature-norm-remediation-u4.md
2026-10-18 17:37:17 +00:00
weichen ddad783853 Merge parent initiative feature/norm-remediation into the task branch
Why: include the current parent initiative baseline before verification.

Evidence: resolved feature/norm-remediation=c6fe5adba34d7266e7bcfbb9a2c64a0ae61e9b8e.

Impact: integrate parent initiative changes without rewriting task history.

Refs: task-sync
2026-10-18 17:36:55 +00:00
weichen 53897dc218 Record U4 verification and independent review
Why: Preserve credential-boundary and truthful-fact verification before delivery.

Evidence: Eight offline tests and 503 governance tests passed (18 skipped); independent fresh PI review has no blocker.

Impact: Task record only; implementation remains at reviewed candidate 39834ead.

Refs: U4 remediation plan
2026-10-18 17:36:51 +00:00
weichen c16665365b Define U7 bounded execution scope
Why: Bind the Dev routing update to the approved context-capacity and handoff requirements.

Evidence: Guidelines PR #11 merged at a15db508 with independent review and exact-head CI.

Impact: Task metadata only; concrete project configuration remains pending.

Refs: PR #616
2026-10-18 17:36:15 +00:00
weichen ea8121b9b0 Record the task card for feature-norm-remediation-u7
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u7.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.

Impact: task metadata only; the feature workspace starts at c6fe5adba3.

Refs: .task/feature-norm-remediation-u7.md
2026-10-18 17:35:52 +00:00
agent-exec-transport 25cdc6adc8 agent-exec transport 03b4578a94b710425f11bd74df523a20/d0bfc2e77832 2026-10-18 17:33:03 +00:00
agent-exec-transport 39834ead7d agent-exec transport 3cbfba3aed64b516704b0d68a7a9f2fa/82da3fb3f31d 2026-10-18 17:28:55 +00:00
weichen c6fe5adba3 Preserve remediation milestone handoff
ci / svc-realcombo (pull_request) Successful in 2m8s
ci / test (pull_request) Successful in 7m32s
ci / test-pg (pull_request) Successful in 8m5s
Why: Persist verified U2/U3 results and bounded U4/U7 continuation facts at a phase boundary.

Evidence: Linked task records, transports, packets and external receipt paths; pending work remains explicit.

Impact: Task metadata only; no execution or delivery claim for pending units.

Refs: PR #616, PR #618, PR #620
2026-10-18 17:24:44 +00:00
weichen 9b29e0f6ec Record U4 first verification receipt
Why: Save offline verification before the final credential-boundary repair.

Evidence: Six offline fact verification tests and syntax/diff checks passed on 7e0b0e4.

Impact: SELF task record only.

Refs: U4 remediation plan
2026-10-18 17:22:38 +00:00
agent-exec-transport 7e0b0e4ff8 agent-exec transport 49a82f74c1def272b56afa8e0ac78c2e/97ab25ec9da4 2026-10-18 17:20:46 +00:00
weichen 804a5749cb Define U4 credential and fact verification scope
Why: Bind the worker to approved U4 paths and offline regression scenarios.

Evidence: U4 plan and strict READY receipt; parent head 6cee4c5.

Impact: Task metadata only.

Refs: PR #616
2026-10-18 17:17:27 +00:00
weichen 033aef5171 Record the task card for feature-norm-remediation-u4
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u4.md; R0=eef7e5e778cabcb6216f74b74213a3d7511f383b.

Impact: task metadata only; the feature workspace starts at 6cee4c5728.

Refs: .task/feature-norm-remediation-u4.md
2026-10-18 17:17:00 +00:00
weichen 6cee4c5728 Record U2 and U3 integration progress
ci / svc-realcombo (pull_request) Successful in 2m41s
ci / test (pull_request) Successful in 8m3s
ci / test-pg (pull_request) Successful in 8m53s
Why: Keep the initiative registry aligned with merged child PRs and the authorized U7 follow-up.

Evidence: PR #618 merged at fe0f1cd; PR #620 merged at feaf1b6.

Impact: Task metadata only; U4 is next.

Refs: PR #616
2026-10-18 17:15:51 +00:00
weichen feaf1b68fb Merge pull request 'Decouple task priority from integration topology' (#620) from feature/norm-remediation-u3 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m26s
ci / test (pull_request) Successful in 8m3s
ci / test-pg (pull_request) Successful in 8m44s
2026-10-18 17:15:06 +00:00
weichen 985afeeda4 Record U3 final target sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m32s
Why: Record the final pre-merge sync against the current initiative head.\nEvidence: make task-sync exited 0 with changed=0 at target fe0f1cd.\nImpact: Keep exact-target evidence with the archived task card.\nRefs: PR #620
2026-10-18 17:04:07 +00:00
weichen 532c7f3b60 Correct U3 target metadata
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m39s
Why: The child card must distinguish root main from its immediate initiative target.\nEvidence: Initiative PR #616 is open with base main; task-pr-check rejected the incorrect root_target.\nImpact: Restore correct target provenance without changing policy or gates.\nRefs: PR #620, PR #616
2026-10-18 17:02:54 +00:00
weichen 4c80fc3b0a Record U3 pre-merge closeout evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m20s
Why: Retain the SELF receipt for task-card closure in the archived U3 record.\nEvidence: task-close SELF=1 exited successfully for PR #620.\nImpact: Keep the pre-merge closeout reproducible without changing policy code.\nRefs: PR #620
2026-10-18 17:01:14 +00:00
weichen 1f34c35e44 Fold-close the task card before merge
ci / test (pull_request) Successful in 7m20s
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u3.md -> .task/archive/feature-norm-remediation-u3.md; status 已完成(合入前闭合); PR #620 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/620.
Impact: task metadata only; the card is archived within PR #620 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 17:00:45 +00:00
weichen 56d16ac458 Record U3 independent review and sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m22s
Why: Preserve the independent review receipt and latest initiative sync before task closure.\nEvidence: Fresh PI review found no blocking issue; task-sync reported changed=0 at the initiative target.\nImpact: Keep the L2-to-L1 handoff traceable.\nRefs: U3 remediation plan
2026-10-18 16:59:04 +00:00
agent-exec-transport cb582d170c agent-exec transport 995bd5f17433165f7fda25874b87f73e/364c25599d5d 2026-10-18 16:57:53 +00:00
weichen f4a95e5698 Record U3 task channel verification
Why: Record the approved U3 scope, worker transport, review, and affected checks.\nEvidence: make test-affected passed test-worktree and test-governance (495 passed, 18 skipped).\nImpact: Keep the child task auditable before L2-to-L1 delivery.\nRefs: U3 remediation plan
2026-10-18 16:54:43 +00:00
agent-exec-transport 98447e269c agent-exec transport ef41add06bee63d92fdd10ad80710aee/4bce0a1e4ce8 2026-10-18 16:47:21 +00:00
weichen d3223f5ec1 Record the task card for feature-norm-remediation-u3
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u3.md; R0=fe0f1cd4649f11b0d855ec39b882b8ca37fffb6b.

Impact: task metadata only; the feature workspace starts at fe0f1cd464.

Refs: .task/feature-norm-remediation-u3.md
2026-10-18 16:45:52 +00:00
weichen fe0f1cd464 Merge pull request 'Allow safe local task continuation (U2)' (#618) from feature/norm-remediation-u2 into feature/norm-remediation
ci / svc-realcombo (pull_request) Successful in 2m14s
ci / test (pull_request) Successful in 7m27s
ci / test-pg (pull_request) Successful in 8m6s
2026-10-18 16:43:37 +00:00
weichen b6e5bba91d Record U2 cached target review evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m32s
Why: Record the cached-target outage fix, host review, and final local verification for U2.\nEvidence: SELF receipts cover 84 focused tests and 495 governance tests; 18 checks skipped.\nImpact: Preserve exact-head delivery traceability without changing implementation.\nRefs: PR #618
2026-10-18 16:33:54 +00:00
agent-exec-transport a06209ff0a agent-exec transport dfbdcf8f9879479cec6791f6db4182b1/9e213bfbef61 2026-10-18 16:13:01 +00:00
weichen 398d12141c Record final U2 recovery gates and test evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Failing after 7m4s
Why: Preserve the final network-error classification, child-parent identity gate, and full governance test result.
Evidence: 83 focused tests and all 494 governance tests passed (18 skips) on the code candidate; child outage/missing-parent contrast tests passed.
Impact: New task and formal delivery gates remain strict; current PR head CI and final review are still required.
Refs: U2 / PR #618
2026-10-18 15:58:11 +00:00
agent-exec-transport 471948c59c agent-exec transport 7bc7519fb1dc6e9f12e152359a795c89/731d7f5ba3a5 2026-10-18 15:46:44 +00:00
agent-exec-transport bc304111a4 agent-exec transport ba0e59b31b8b4e18bc7e8df0ab680c80/ccf1734d8c5b 2026-10-18 15:41:58 +00:00
agent-exec-transport 59c27869bf agent-exec transport adeb3ec7854d8724c54dcac15493e3b5/523f5b51ad61 2026-10-18 15:26:49 +00:00
weichen 06b6ceea5f Record U2 offline resume and parent-reference closure
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m46s
Why: Preserve final root/child offline resume behavior and its reachable-parent-missing guard.
Evidence: 80 evidence/recovery tests and all 491 governance tests pass (18 expected skips) on the code candidate.
Impact: Local resume remains bounded; known missing remote parent refuses, network outage may use the registered local parent. Final-head CI remains required.
Refs: U2 / PR #618
2026-10-18 15:16:42 +00:00
agent-exec-transport 1059015958 agent-exec transport d47c50b0ed7fa9d2d7e0b4d58d5bd564/a79c762899de 2026-10-18 15:05:22 +00:00
agent-exec-transport 5b5537aa0f agent-exec transport 0579081fa29ea1bd6d1d532a7a177e36/f55c4a162b49 2026-10-18 14:58:04 +00:00
weichen 2fb7d2d30f Record offline resume and R0 comparison evidence
Why: Preserve host verification and worker transport records for offline root and child task resume.
Evidence: 79 evidence/recovery tests passed; governance validation is being rerun on the final implementation candidate.
Impact: LOCAL_READY remains local-only; exact-head CI and final independent review remain required.
Refs: U2 / PR #618
2026-10-18 14:55:31 +00:00
agent-exec-transport 1ff6444d33 agent-exec transport 2f332e8b99c2b13e0f8734136a777328/db30d3293d24 2026-10-18 14:34:23 +00:00
agent-exec-transport f81326bd08 agent-exec transport 7da469a725ec41f651cf89a8616adaa7/78f40f5a0c57 2026-10-18 14:25:10 +00:00
agent-exec-transport 8d8585afec agent-exec transport 2cd24625d2b60b7c6db7aa1bc628a9c0/af7e0b3bb4d6 2026-10-18 14:17:22 +00:00
agent-exec-transport fbb2aacb71 agent-exec transport 973ce511e924ce5ab0953e16e46a42ec/7671c49f7667 2026-10-18 14:04:13 +00:00
weichen 5b50d50b2a Record U2 unreachable and uncomparable target distinction
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m29s
Why: Preserve the final guard for a reachable advertised target whose commit object cannot be compared locally.
Evidence: The regression test, 74 focused evidence/recovery tests, and all 485 governance tests pass.
Impact: Network outages retain LOCAL_READY; known but unverified target history returns REMOTE_UNVERIFIED. Exact-head CI remains pending.
Refs: U2 / PR #618
2026-10-18 13:48:10 +00:00
agent-exec-transport 9c0e765708 agent-exec transport 3d1dd4ef1d7a2e761c3af308dc662a98/0cfaf24c9ad2 2026-10-18 13:37:32 +00:00
agent-exec-transport 95d1718858 agent-exec transport c8c8cc86667d1b3309eb41b4a2808131/d60aee058c18 2026-10-18 13:19:42 +00:00
weichen b492bea7c3 Record U2 final edge coverage and governance run
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m25s
Why: Preserve the final test matrix and review corrections for the U2 candidate.
Evidence: All 484 governance tests pass (18 skipped); the targeted evidence and recovery cases pass on the same implementation.
Impact: SELF evidence only; final-head CI and independent review remain required.
Refs: U2 / PR #618
2026-10-18 13:08:30 +00:00
agent-exec-transport 2e0da0dadb agent-exec transport 15c16d890ff16327f11293fe6ecbfdde/f7c42d8ea545 2026-10-18 13:00:18 +00:00
weichen f2c24015b0 Record U2 review fixes and governance tests
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 8m10s
Why: Preserve the closed-task and remote-target rewind corrections with their regression and governance test evidence.
Evidence: 71 focused tests and all 482 governance tests passed; the previous exact-head CI failed in an unrelated backend runtime test and requires a fresh run.
Impact: Review findings are fixed in scope; independent final review and current-head CI remain required.
Refs: U2 / PR #618
2026-10-18 12:52:11 +00:00
agent-exec-transport 05a9a3bc89 agent-exec transport a41de1816057eb4de14b0175a36c9c68/dfebc3695180 2026-10-18 12:41:18 +00:00
agent-exec-transport d5b8e74c43 agent-exec transport ba8f131d4f2b8d718c2fa2b84ec799b9/b503d085cc5b 2026-10-18 12:31:40 +00:00
weichen c88311bbf6 Record missing-ref coverage and final U2 tests
ci / test (pull_request) Failing after 6m30s
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
Why: Capture the final offline recovery cases and host verification on the PR candidate.
Evidence: 68 focused evidence and task-recovery tests pass; two broader task-start failures reproduce on the parent baseline.
Impact: Local evidence remains SELF; exact-head CI and independent review are still required.
Refs: U2 / PR #618
2026-10-18 12:15:07 +00:00
agent-exec-transport 74e4b06e5e agent-exec transport fc1ce3b002ab4e66a7985a9417b6839b/73e49d7b97cc 2026-10-18 12:13:18 +00:00
agent-exec-transport d2986f1f5f agent-exec transport 2633f16b2b409f0873abdc9c2fc89d4f/40f7d143ac3c 2026-10-18 12:03:23 +00:00
agent-exec-transport eb6be71cfc agent-exec transport ed920f07e90db7046ab42bec91f8095a/ed5fe66131b3 2026-10-18 11:59:50 +00:00
agent-exec-transport a43aa171ea agent-exec transport 5a7bc332a82e8c04309dc5fcac926434/4bad7f41a3dc 2026-10-18 11:57:29 +00:00
agent-exec-transport dcbd36656b agent-exec transport b091b4ca30479a9e3b114d35fa32630d/c9ea726dc405 2026-10-18 11:53:49 +00:00
weichen e022948747 Fold-close the task card before merge
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m52s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u2.md -> .task/archive/feature-norm-remediation-u2.md; status 已完成(合入前闭合); PR #618 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/618.
Impact: task metadata only; the card is archived within PR #618 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 11:44:00 +00:00
weichen 0815ab9f19 Record final U2 focused test evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m54s
Why: Preserve the final synchronized candidate's local verification receipt before closing its task card.
Evidence: python3 -m unittest tests.test_evidence tests.test_task_recovery passed 66 tests on the synchronized candidate.
Impact: SELF evidence only; independent review and CI remain required for formal delivery.
Refs: feature/norm-remediation-u2
2026-10-18 11:42:52 +00:00
weichen 1e26b1cccd Record local recovery implementation results (U2)
Why: Preserve worker transport outcomes and host verification evidence for U2.
Evidence: 66 focused evidence and task-recovery tests passed on the recorded HEAD.
Impact: Records SELF verification and the observed worker edit-serialization deviation; formal review and CI remain NOT_RUN.
Refs: feature/norm-remediation-u2
2026-10-18 11:27:37 +00:00
agent-exec-transport 210bb031d4 agent-exec transport 9c7c1417e62f511b5f90669f58d69da9/682c27506bb4 2026-10-18 11:24:49 +00:00
weichen 2bbe4d8fcf Record local task resume evidence
Why: Preserve the validated LOCAL_READY resume receipt before starting a worker.
Evidence: make precheck returned LOCAL_READY; make task-resume imported the receipt.
Impact: SELF-only task metadata; delivery still requires authoritative sync and checks.
Refs: feature/norm-remediation-u2
2026-10-18 11:16:55 +00:00
agent-exec-transport d6df427e39 agent-exec transport 3fe48cd812763be825a67eebc5ea78f6/a9ce16b6d684 2026-10-18 11:12:05 +00:00
agent-exec-transport 30a582372b agent-exec transport af2c39009af24615b572532ee5c44eaf/4f8f2959f25a 2026-10-18 11:08:18 +00:00
weichen e5a1881dfa Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=74bd05a876136ed8506332c76d535a6eb6356433; before_record=f65d0169f61addfc0b2a21ef3813f38b55deb687.

Impact: task metadata only.

Refs: .task/feature-norm-remediation-u2.md
2026-10-18 10:58:22 +00:00
weichen f65d0169f6 Merge parent initiative feature/norm-remediation into the task branch
Why: include the current parent initiative baseline before verification.

Evidence: resolved feature/norm-remediation=74bd05a876136ed8506332c76d535a6eb6356433.

Impact: integrate parent initiative changes without rewriting task history.

Refs: task-sync
2026-10-18 10:57:50 +00:00
weichen 9632c8f859 docs(task): record blocked U2 attempt evidence
Why: Preserve the exact failure provenance and prepare a clean recovery record.

Evidence: The original agent-exec receipt shows overlapping edits in one Cursor session, terminal blocked, no transport, and no host fallback.

Impact: The next U2 work will use new run IDs and single-writer, short task packets.

Refs: Development Norm Remediation U2 recovery.
2026-10-18 10:57:36 +00:00
weichen 74bd05a876 docs(task): record single-writer recovery plan
ci / svc-realcombo (pull_request) Successful in 2m22s
ci / test (pull_request) Successful in 7m45s
ci / test-pg (pull_request) Successful in 8m40s
Why: Record the confirmed same-session overlapping edit cause and the bounded recovery sequence after the shared executor prompt fix.

Evidence: Development-Manager PR #26 merged at b178dec; the initiative still pins the prior DM revision pending the later combined adoption step.

Impact: U2 will restart from a fresh execution run using smaller serialized packets. U3-U6 remain registered but not started.

Refs: Development Norm Remediation recovery.
2026-10-18 10:56:54 +00:00
weichen fc3a740ad1 Define safe local continuation scope (U2)
Why: Specify the authorized continuation boundary before implementation begins.

Evidence: Task card records U2 files, hard stops, and acceptance criteria from the approved plan.

Impact: New-task remote triage and formal delivery gates remain unchanged.

Refs: Development Norm Remediation U2.
2026-10-18 09:52:07 +00:00
weichen d6829afb95 Record the task card for feature-norm-remediation-u2
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u2.md; R0=b5e23daed2f0ea46261979de1d62e4de0cfa88f9.

Impact: task metadata only; the feature workspace starts at 01d9f50ee8.

Refs: .task/feature-norm-remediation-u2.md
2026-10-18 09:51:35 +00:00
weichen 01d9f50ee8 Define the norm remediation initiative
ci / svc-realcombo (pull_request) Successful in 2m17s
ci / test-pg (pull_request) Failing after 2m22s
ci / test (pull_request) Successful in 7m56s
Why: The cross-repository remediation needs an explicit integration contract before child implementation can start.

Evidence: The charter records approved scope, U1 merge, child-unit dependencies, and verification gates.

Impact: New requirement intake is closed; only registered U2-U6 children may join this initiative.

Refs: Development Norm Remediation plan U1-U6.
2026-10-18 09:35:41 +00:00
weichen fbffe1d407 Record the task card for feature-norm-remediation
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation.md; R0=b5e23daed2f0ea46261979de1d62e4de0cfa88f9.

Impact: task metadata only; the feature workspace starts at b5e23daed2.

Refs: .task/feature-norm-remediation.md
2026-10-18 09:24:53 +00:00