Decouple task priority from integration topology #620

Merged
weichen merged 9 commits from feature/norm-remediation-u3 into feature/norm-remediation 2026-10-18 17:15:06 +00:00
9 Commits
Author SHA1 Message Date
weichen 985afeeda4 Record U3 final target sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m32s
Why: Record the final pre-merge sync against the current initiative head.\nEvidence: make task-sync exited 0 with changed=0 at target fe0f1cd.\nImpact: Keep exact-target evidence with the archived task card.\nRefs: PR #620
2026-10-18 17:04:07 +00:00
weichen 532c7f3b60 Correct U3 target metadata
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m39s
Why: The child card must distinguish root main from its immediate initiative target.\nEvidence: Initiative PR #616 is open with base main; task-pr-check rejected the incorrect root_target.\nImpact: Restore correct target provenance without changing policy or gates.\nRefs: PR #620, PR #616
2026-10-18 17:02:54 +00:00
weichen 4c80fc3b0a Record U3 pre-merge closeout evidence
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m20s
Why: Retain the SELF receipt for task-card closure in the archived U3 record.\nEvidence: task-close SELF=1 exited successfully for PR #620.\nImpact: Keep the pre-merge closeout reproducible without changing policy code.\nRefs: PR #620
2026-10-18 17:01:14 +00:00
weichen 1f34c35e44 Fold-close the task card before merge
ci / test (pull_request) Successful in 7m20s
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u3.md -> .task/archive/feature-norm-remediation-u3.md; status 已完成(合入前闭合); PR #620 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/620.
Impact: task metadata only; the card is archived within PR #620 and lands with its merge commit.
Refs: task.sh close --self
2026-10-18 17:00:45 +00:00
weichen 56d16ac458 Record U3 independent review and sync
ci / test-pg (pull_request) Skipped
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Successful in 7m22s
Why: Preserve the independent review receipt and latest initiative sync before task closure.\nEvidence: Fresh PI review found no blocking issue; task-sync reported changed=0 at the initiative target.\nImpact: Keep the L2-to-L1 handoff traceable.\nRefs: U3 remediation plan
2026-10-18 16:59:04 +00:00
agent-exec-transport cb582d170c agent-exec transport 995bd5f17433165f7fda25874b87f73e/364c25599d5d 2026-10-18 16:57:53 +00:00
weichen f4a95e5698 Record U3 task channel verification
Why: Record the approved U3 scope, worker transport, review, and affected checks.\nEvidence: make test-affected passed test-worktree and test-governance (495 passed, 18 skipped).\nImpact: Keep the child task auditable before L2-to-L1 delivery.\nRefs: U3 remediation plan
2026-10-18 16:54:43 +00:00
agent-exec-transport 98447e269c agent-exec transport ef41add06bee63d92fdd10ad80710aee/4bce0a1e4ce8 2026-10-18 16:47:21 +00:00
weichen d3223f5ec1 Record the task card for feature-norm-remediation-u3
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-norm-remediation-u3.md; R0=fe0f1cd4649f11b0d855ec39b882b8ca37fffb6b.

Impact: task metadata only; the feature workspace starts at fe0f1cd464.

Refs: .task/feature-norm-remediation-u3.md
2026-10-18 16:45:52 +00:00