Commit Graph
147 Commits
Author SHA1 Message Date
weichen 3bb02a119b Guard final-only continuation in the U3 plan
Why: Hiding a tool declaration alone does not prevent a model from calling a tool already in the runtime registry.

Evidence: The agent-native loop continues after tool errors; the plan now requires a local stop latch before any later provider call.

Impact: Clarify the zero-paid test and implementation boundary without changing the approved design or authorizing model usage.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 09:21:29 +00:00
weichen dfe99d530e Plan the U3 quality revision implementation
Why: The approved written design needs testable work items before changing model behavior or spending another sample.

Evidence: The plan maps all three design duties to existing code seams, RED-to-GREEN checks, a fixed combination gate and a separately authorized real-model exit.

Impact: Record stage-five review material without modifying product code, using paid models, or opening merge gates.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 09:17:49 +00:00
weichen 67e924041e Draft the U3 quality revision design
Why: The approved model samples showed unsupported approval claims, repeated source input and no final answer before the run budget stopped.

Evidence: The design cites the preserved A01 provider usage, persisted findings and independent sample audit without claiming new model validation.

Impact: Define a reviewable source, claim and final-reserve revision while keeping code, paid trials and merge gated.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 08:51:35 +00:00
weichen 9cdb14010c Disclose the A01 stop-rule deviation
Why: The controlled trial made one more paid provider request after rejecting a nonliteral quote.

Evidence: Independent transcript audit found a 14231-token continuation within the same child run; original receipts and failed quality verdict remain intact.

Impact: Make the authorization deviation explicit and reference a zero-paid prevention guard; no additional model run is authorized.

Refs: Agent-System-Documents#95; Agent-System-Backend#193; Agent-System-Dev#512
2026-10-13 08:02:43 +00:00
weichen f7a68e5882 Record the failed bounded A01 follow-up
Why: The approved v7 sample saved two checkpoints but still missed semantic and final-result acceptance.

Evidence: Independent DB replay, provider usage reconciliation, source checks and the original failed evaluation receipt.

Impact: Preserve the exhausted one-shot boundary and keep all draft PRs unmerged.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 07:42:45 +00:00
weichen fb06fccfa2 Prepare a bounded review proposal after failed checkpoint delivery
Why: The approved extra sample ended with no valid saved findings and exhausted its per-run token threshold.

Evidence: Provider responses, strict-source rejections, Usage and independent analysis are retained; v7 has only local checks.

Impact: Define a separately approvable two-run 30000-token-per-run experiment without altering original acceptance rules or claiming model success.

Refs: Approved U2/U3 plan r0.1; independent extra A01 assessment
2026-10-13 06:50:16 +00:00
weichen 4b20983ccd Update plan entry points and archive current verification
Why: The project and proposal indexes still said no U2/U3 implementation or experiment existed.

Evidence: Current combination, full PG backend, two HTTP browser cases and independent code review are linked with their actual statuses.

Impact: Documentation only; real-model acceptance is explicitly failed and no release is claimed.

Refs: Approved U2/U3 task card and validation report
2026-10-13 06:34:34 +00:00
weichen dd3b9da619 Archive current verification and the failed extra A01 assessment
Why: Keep the latest merged candidate reviewable without turning failed model findings into a release claim.

Evidence: Exact d06792c composition, two current browser cases and independent model review are linked and source-labeled.

Impact: Documentation only; model quality gate and merge remain closed.

Refs: Approved U2/U3 task card
2026-10-13 06:23:53 +00:00
weichen 1b296a1773 Record the failed approved A01 replay and next acceptance conditions
Why: The model produced no admissible findings, so release and further paid work remain gated.

Evidence: Original provider calls, 42203 tokens, independent SQLite replay and strict source rejection are linked from the validation report.

Impact: Correct planning status and recommend a bounded lower-complexity test design for separate approval.

Refs: Approved U2/U3 plan r0.1; extra A01 user approval 2026-10-13
2026-10-13 06:13:39 +00:00
weichen 7fe00e052f Merge current planning records before U2/U3 review
Why: Preserve other approved planning records and index updates.

Evidence: Exact current main fetched; no overlapping source behavior.

Impact: Retain both planning histories.

Refs: Agent-System-Dev U2/U3 delivery
2026-10-13 05:28:02 +00:00
weichen 0e9c6710e4 Archive the final code review and fixed combination evidence
Why: Make the current corrected candidate reviewable while preserving the failed model acceptance boundary.

Evidence: Native SELF receipt for exact source composition 7fd5288 is green; independent reviewer verifies Backend 6a2d85c and all fixed regressions.

Impact: Documentation only; the six failed or limited model samples remain unchanged and no merge or deployment is claimed.

Refs: Approved U2/U3 plan; pending explicit extra A01 test authorization
2026-10-13 04:45:51 +00:00
weichen 53a7d37e6c Record implemented work checkpoints and the pending model acceptance gate
Why: Planning-only status no longer matches the candidate, while failed model samples must remain explicit.

Evidence: Native SELF receipts and independent REPLAY reports distinguish code checks, six model cases and the failed quality/fidelity boundaries; relative links verified.

Impact: Update only this approved U2/U3 planning record and validation report; CI, merge, deployment and an extra sample remain pending.

Refs: User confirmation 2026-10-13; Dev feature-fast-slow-u2-u3-plan
2026-10-13 04:31:50 +00:00
weichen 0b290b7461 Record the login recovery implementation as proposal r3
Why: The 2026-10-13 login recovery flow was approved and merged
(Backend #187, Frontend #76, Dev #504); the master proposal must carry
the three adjudications, implementation record, and evidence pointers
per the repo's lineage conventions.

Evidence: Dev #504 HEAD CI (test/test-pg/svc-realcombo) success; browser
acceptance receipts be7ae9a2/b3a9e691 bound to Dev HEAD 268ef29 (SELF).

Impact: r3 is an implementation record only; R/KTD/U numbering semantics
unchanged; U7 explicitly NOT marked complete (atomic bootstrap and CLI
credential delivery remain). INDEX.md status line updated.

Refs: Dev docs/svc-deploy/2026-10-13-login-recovery-contract.md
2026-10-13 04:30:04 +00:00
weichen a73c84b5be Add RDM settings, members, duties and permissions increment plan r1
Why: 固化 2026-10-13 评审通过的 RDM 完善增量方案(承接总案 U3/U4/U6,衔接 U5),含三处技术评审补充与顺序裁定。
Evidence: 方案核查记录见提案文末;源码锚点 Backend settings.go / RDM perms.go, plugin.go / Frontend adminRdmSections.tsx。
Impact: 仅新增提案文档与索引条目,无代码变更。
Refs: 2026-10-12-rdm-function-implementation-plan.md
2026-10-13 03:22:46 +00:00
weichen 59db26eb9c Merge commit '05c13a42b14d70f878cc8a51c543e018a7f7a663' into feature/fast-slow-u2-u3-plan 2026-10-13 02:44:19 +00:00
weichenandCursor 53354996f2 Record the K4 artifact retest in the collaboration plan
Why: the 2026-10-12 drill left artifact recovery failed, and the retest changed that SELF result without changing the write-traffic gate.
Evidence: backup-20261013-013354 on Dev a83588dd and backend 46073d30; K1-K7 true, RPO 65s, RTO 3s, five artifacts matched and cross-user access returned 404. SELF.
Impact: proposal moves to r2.3. Second-instance writes stay closed until REPLAY or CI and the second host exist.
Refs: docs/records/2026-10-12-u7-ops-drill-report.md docs/proposals/2026-10-11-collaboration-storage-and-distribution.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-13 01:44:03 +00:00
weichen c2b17f620b Prepare the U2 and U3 work projection implementation plan
Why: make persistent activity and grounded findings reviewable before business changes.

Evidence: fixed source audit and scoped plan self-review; business and live checks remain NOT_RUN.

Impact: proposed contracts, implementation sequence, compatibility and bounded verification only.

Refs: fast-slow design r1.1, Dev feature/fast-slow-u2-u3-plan
2026-10-12 23:44:37 +00:00
weichen cf74a200e8 Record the corrected workbench candidate and single delivery record
Why: Keep planning progress aligned with actual implemented corrections without duplicating CI and merge state.

Evidence: Reference UI155, Frontend210 and 19 local browser cases via Dev native receipts; final GATE remains separately tracked.

Impact: Planning metadata only; no deployment or model-routing claim.

Refs: work-companion-ui r0.2/r1, UI01-UI13
2026-10-12 19:07:32 +00:00
weichen f7ae1ecce6 Record workbench implementation evidence and remaining delivery gates
Why: Keep the approved design and implementation plan consistent with the current candidate.

Evidence: Reference actual SELF verification and pending independent Review and GATE, without copying command output.

Impact: Planning progress only; inherited live-model capabilities and deployment remain separate.

Refs: UI01-UI13, work-companion-ui U5
2026-10-12 16:59:30 +00:00
weichen b184bfb109 Merge current Documents main into the workbench design branch
Why: preserve concurrent planning records before the Dev combination sync.

Evidence: fetched authoritative Documents main f76cce9e32.

Impact: planning record integration without rewriting history.

Refs: work-companion-ui U5.
2026-10-12 16:32:44 +00:00
weichenandCursor 95c2ec260c Record the U7 ops drill and advance the storage plan to r2.2
Why: B6, C4, and C5 now have same-host results, and the plan still said the ops drills were not done and that replay was the next step.
Evidence: Dev results pgbench-20261012-131948, fault-20261012-142734, and backup-20261012-153441 (SELF). The user declined a capacity replay on 2026-10-12.
Impact: Second-instance writes stay closed. K4 remains a product defect. Replay and C3 are not started.
Refs: feature/u7-ops-drills
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 15:49:44 +00:00
weichen 8d8600024d Record the approved progressive workbench design and implementation plan
Why: implement a simple workbench for nontechnical users under continuous authorization.

Evidence: current source audit and the reviewed r0.1 prototype; runtime verification remains pending.

Impact: design and plan only; task execution state stays in the Dev task card.

Refs: UI01-UI13 and the existing fast-slow display design r1.1.
2026-10-12 15:03:27 +00:00
weichenandCursor cb7e25439a Record D1-D3 deploy remediation on the recovery plan
Why: the 2026-10-12 batch-update failure still had identity, rollback, and real-combo gaps after Dev #474, Backend #180, and RDM #276. The recovery plan is the single record for that work, and the rdmcand data-ownership check needed a written result before any restore.
Evidence: read-only queries on runtime-backups/{dev,rdm1,rdmcand}/20261012T133921Z and the matching domain backups. No business rows were moved.
Impact: adds r3.1 sections D1/D2/D3 and the ownership finding that dev conversations predate rdmcand's use of dev/data, so no cross-instance restore is indicated. r3's earlier unapproved text stays unapproved.
Refs: Dev feature/svc-d1-identity-flow; Backend feature/d1-identity-open
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 13:47:46 +00:00
weichen 3cc6438030 Merge pull request 'Revise svc account durability and recovery plans (r2/r3)' (#87) from feature/svc-account-durability-plan into main
Reviewed-on: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Documents/pulls/87
2026-10-12 12:18:24 +00:00
weichen 0952b50aef Merge pull request 'Add fast-slow channel display design r1.1 and U1 plan' (#84) from feature/fast-slow-display-design into main
Reviewed-on: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Documents/pulls/84
2026-10-12 12:16:07 +00:00
weichen 9c31d3c308 Merge Documents main into account durability plan branch
Why: keep r2/r3 proposal updates rebase-friendly before PR.
Evidence: origin/main at fetch time.
Impact: Documents feature tip includes latest main.
Refs: feature/svc-account-durability-plan
2026-10-12 12:11:40 +00:00
weichenandCursor dbdec82466 Record U7 capacity window SELF report and plan r2.1
Why: Capacity ladder/60m/2h dual-instance windows finished; planning
progress must reflect SELF-pass vs remaining GATE/REPLAY/C3 gaps.
Evidence: SELF load results summarized in the new capacity report.
Impact: Preferred next becomes independent REPLAY or C3/C4/C5.
Refs: Dev feature/u7-capacity-wrap-measure; release-multi-instance.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 12:07:12 +00:00
weichen ebf655c4d7 Merge Documents main into fast-slow display design branch
Why: Dev #451 cannot pin modules/documents while feature tip and main diverge.
Evidence: merge-tree reports submodule conflict 1048e7c vs 9e4ee27.
Impact: Documents #84 tip includes main@1048e7c plus r1.1/U1 plan.
Refs: Dev PR #451; Documents PR #84
2026-10-12 12:07:02 +00:00
weichen fe8d08be21 Record the final baseline and isolated candidate data
Why: distinguish timed observations from current service ownership.

Evidence: SELF task-sync and read-only observations at 18:14 Beijing time.

Impact: planning metadata only; runtime and component deployment unchanged by this task.

Refs: account r2; recovery r3
2026-10-12 10:16:32 +00:00
weichen dca4265e37 Plan stable accounts and durable service recovery
Why: account help, dev credential writes and crash recovery need a current, reviewable contract.

Evidence: SELF source and sanitized runtime observations; seven document review lenses; business and fault validation NOT_RUN.

Impact: revise two planning documents only; preserve prior approvals and mark additions pending review.

Refs: Dev feature/svc-account-durability-plan; account r2; recovery r3
2026-10-12 10:09:49 +00:00
weichen a183e663de Propose RDM function implementation plan r1
Why: 2026-10-12 全系统核对产出的功能/实现矩阵与 U1-U9 整改方案需入仓评审;独立文件已过期于共享门禁解除。
Evidence: 报告含冻结源码/运行时快照与逐条需求索引;发布补记记录冻结后部署时序与 U2 已合入切片(RDM PR #251/#254/#256/#258)。
Impact: 仅新增 docs/proposals 一份方案与 README 入口;不改代码与既有文档。
Refs: RDM docs/requirements V2.2、Documents 2026-10-11-rdm-final-target-completion.md
2026-10-12 09:28:44 +00:00
weichen 9e4ee27c7e Mark fast-slow U1 plan approved for implementation
Why: User authorized stage-5 start; record plan status for executors.
Evidence: Chat authorization "开始"; no runtime tests.
Impact: Documents proposal status only.
Refs: 2026-10-12-fast-slow-channel-display-u1-plan.md
2026-10-12 07:39:03 +00:00
weichen 5b71525818 Merge Documents main into fast-slow display design branch 2026-10-12 07:33:22 +00:00
weichenandCursor f9d96dfc59 Add fast-slow display design r1.1 and U1 plan
Why: Record approved stage-4 design with R03 splits and U1 exit
whitelist, plus stage-5 U1 implementation plan for review.
Evidence: Document edits only; no runtime verification.
Impact: Documents proposals INDEX; no business code.
Refs: feature/fast-slow-display-design

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 07:31:46 +00:00
weichenandCursor 2cec59016a Update collab storage plan progress to r2 after U1-U7
Why: Delivery requires writing planning progress back after U7
landed; the proposal still claimed U1+U2 start / NOT_RUN.
Evidence: SELF doc edit against archived U7 cards and release
checklist A1-A7/B1 facts.
Impact: Readers see code-done vs capacity-window-pending; adds
HTTP multi-instance vs Manager-test lesson.
Refs: Dev feature/u7-capacity-wrap-measure; release-multi-instance.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 06:39:26 +00:00
weichen 9d9b1523c8 Merge Documents main into svc unified-deploy proposal branch
Why: Dev #422 conflicted on modules/documents gitlink after main advanced past the proposal pin.
2026-10-12 05:26:12 +00:00
weichen e39d327850 Record GenUI prod-acceptance action fixes on the usage guide
Why: Capture nil-card panic and intent data-flatten field fixes found
during local prod acceptance without revising the final closure verdict.
Evidence: Backend#173 #174; prod action checklist
Impact: Field-fix log lists the two hotfixes and their PRs.
Refs: GenUI prod deploy; fix track
2026-10-12 04:17:07 +00:00
weichen 66ddd37870 Note Generative UI prod instance acceptance on the usage guide
Why: Record that the known-boundary production deploy/acceptance ran
on the local prod svc instance with auth and PG.
Evidence: scripts/svc.sh prod list; acceptance API checklist
Impact: Usage guide boundary list no longer says deploy is pending.
Refs: GenUI prod deploy task
2026-10-12 04:08:58 +00:00
weichenandCursor 16cafca00c Approve Generative UI auto-trigger opt-in design
Why: Capture the fixed opt-in/budget/anti-self-trigger decisions and
update the usage guide boundary list.
Evidence: proposal r1 status approved
Impact: Authority for backend auto-present implementation.
Refs: plan GenUI boundaries T2/T3

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:46:26 +00:00
weichenandCursor 7df7d786d0 Record r1 approval for svc unified deploy proposal
Why: user approved the proposal and U1/U4 specs and authorized push/PRs
plus U1/U4 implementation start.
Evidence: SELF conversation approval 2026-10-12; implementation still NOT_RUN.
Impact: planning status only.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:32:55 +00:00
weichenandCursor 923537e9a1 Add svc unified deploy and one-time login key proposal r1
Why: capture the reviewed design for binary/source install, env prep,
and passwordless activation via one-time restricted sessions.
Evidence: SELF source review against Dev af9c2de; implementation NOT_RUN.
Impact: Documents planning index only; no runtime change.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:28:37 +00:00
weichen 0b314e2029 Record the admin-zone partition delivery in the two-trees plan progress
Why: policy requires updating applicable plan progress on task
completion; WP3-I3 landed the admin-zone entrance via the generic
declaration mechanism.
Evidence: Dev PR #414 and live verification comment (R5, SELF).
Impact: progress line of 2026-10-11-rdm-two-trees-trace-audit-integration.md only.
Refs: WP3-I3/KTD4.
2026-10-12 03:24:50 +00:00
weichenandCursor 7fbfad1851 Approve B-class allowlist for help and intent actions
Why: Record the independent U5-style review for the first two B-class
surface actions and update the usage guide allowlist note.
Evidence: proposal r1 status approved; usage doc API table updated.
Impact: Documents authority for backend whitelist implementation.
Refs: U5 action-scope r2; plan GenUI boundaries 2026-10-12

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:19:03 +00:00
weichen 877d0683cd Add the Generative UI usage guide and U1-U6 evaluation record (final)
Why: The direction closes at U7 - the master record needs its
companion usage guide (enable/generate/revise/act/disable for owners)
and the combined evaluation record covering every landed increment
with its evidence chain and known boundaries.

Evidence: Live E2E on dev@b634a27 (real MiniMax-M3): progress page
presented autonomously, conversation surfaces=2, project aggregation
returns cross-conversation pages under the owner scope; receipts in
Dev task feature/generative-ui-u7-acceptance.

Impact: Documents-only (new guide + index closeout).

Refs: r2 master record; U5 scope r2; Dev task
feature/generative-ui-u7-acceptance
2026-10-12 02:47:27 +00:00
weichen da59ccff04 Track the merged svc-autorecover outcome in the review record and index
Why: between the review round and the approval decision another session completed and merged svc-autorecover (PR #396/#400/#401/#402), so the (a)-decision tracking must reflect the landed slice and the remaining U2 delta.

Evidence: SELF - merged main history c622372 and archived card .task/archive/feature-svc-autorecover.md (10/10 tests, 146/146 governance, CI green on e0b49d1).

Impact: review record, INDEX; proposal r2 body unchanged.

Refs: PR #396 #401
2026-10-12 01:29:31 +00:00
weichen 5a807933c2 Record the r2 approval and the svc-autorecover vehicle decision
Why: the human gate resolved on 2026-10-12 - r2 approved (five stages at once) and option (a) adopted; the review record, proposal index and status navigation must reflect it.

Evidence: SELF - user decision relayed in conversation; stage-review details in the Dev task card; proposal r2 body unchanged (SHA256 9cfda252...).

Impact: review record, INDEX entry; no plan content change.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-12 01:26:50 +00:00
weichen 71cd9d1db2 Record the post-sync drift check and svc-autorecover in-flight findings in the review record
Why: the reviewer record must reflect that all r2 gap claims hold at the post-sync backend pin 25fbea85, and that the svc-autorecover ownership decision now has 373 lines of unregistered, partially failing in-flight work to weigh.

Evidence: SELF - drift-check receipt in the Dev task card (exit 0, all cited gaps hold); svc-autorecover suite observed 5 of 10 tests failing on 2026-10-11.

Impact: review record addendum only; proposal r2 (SHA256 9cfda252...) unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:51:54 +00:00
weichen cbc64eb8ab Revise the recovery proposal to r2 with external review findings
Why: absorb the external source-review round - pin the shutdown budget change, close the U1 acceptance gap for program/cwd changes, gate U4 public states on a mapping table, and make the svc-autorecover coordination an explicit human decision.

Evidence: SELF - external review round 2 in the review record; r2 SHA256 9cfda2520b913e6966c68fb3f66fb7bc8382a8f7a2b69cb364122216dcdb72cd; all reviewed claims re-verified against the pinned baselines.

Impact: documents only; four targeted amendments (U1/U3/U4/section 9) plus version bump and INDEX update; requirements and metrics unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:45:09 +00:00
weichen 54fc24e4d5 Add the service restart and recovery proposal r1 with review record
Why: pin the reviewed candidate as a fixed git object before human review (external review P1.1); untracked drafts made check-evidence report unverified.

Evidence: SELF - proposal SHA256 cfc9b768a4596a268810e20101cddc2a6040e24a640e6e34dbda17b838cd45ed matches the review record; source baseline Dev 5e57029b, Backend eb12f102, Core 89f3906c, Frontend aaced879, Documents 23e2276.

Impact: documents repo only; adds proposal r1, six-lens review record and INDEX entry; no implementation, NOT_RUN statuses preserved.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:42:23 +00:00
weichen 2085447701 Record U5 progress and mark U1-U5 implementation complete in the master plan
Why: U5 landed via RDM PR #213 (merge 1dce69d); all five implementation units now complete.

Evidence: RDM PR #213 merged=True.

Impact: plan status + U5 progress + INDEX.

Refs: RDM PR #213
2026-10-11 15:57:13 +00:00