Record the controlled merge queue trial #101

Merged
weichen merged 1 commits from feature/merge-queue-trial-report into main 2026-10-14 04:51:47 +00:00
Owner

Why: The approved merge queue U6 plan requires an evidence-linked record of three real controlled deliveries before deciding whether to expand the manual trial.

Result: Add the 2026-10-14 trial report with actual component dependencies, R0/base/head/merge objects, final PR and main-push CI costs, no-op syncs, recovery events, and MQ1–MQ9 limits. It distinguishes manual coordination from untested automatic fencing and leaves expansion for user review.

Evidence: git diff --check and the relative-link check passed on fixed head 3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e. Independent REPLAY /root/merge_queue_review passed this exact report (/tmp/mq-u6-report-final-independent-review-20261014.json). The report links the actual GATE runs and primary PRs. This document repository defines no Actions CI workflow, so CI is N/A here; Dev component and parent CI are listed in the report.

Impact: Documentation only; no product code, branch protection, shared database, or live service change.

Refs: Dev queue #518; approved merge queue implementation plan U6.

Root merged fixed report head 3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e as 2d35cd49c203820d24d7c38acead06d37793c1f1; the complete merge tree matches the independently reviewed report. No workflow or required status exists in this document repository (CI=N/A); trial GATE links remain in the report. Expansion remains a separate user decision.

Why: The approved merge queue U6 plan requires an evidence-linked record of three real controlled deliveries before deciding whether to expand the manual trial. Result: Add the 2026-10-14 trial report with actual component dependencies, R0/base/head/merge objects, final PR and main-push CI costs, no-op syncs, recovery events, and MQ1–MQ9 limits. It distinguishes manual coordination from untested automatic fencing and leaves expansion for user review. Evidence: `git diff --check` and the relative-link check passed on fixed head `3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e`. Independent REPLAY `/root/merge_queue_review` passed this exact report (`/tmp/mq-u6-report-final-independent-review-20261014.json`). The report links the actual GATE runs and primary PRs. This document repository defines no Actions CI workflow, so CI is N/A here; Dev component and parent CI are listed in the report. Impact: Documentation only; no product code, branch protection, shared database, or live service change. Refs: Dev queue #518; approved merge queue implementation plan U6. <!-- mq-u6-report-actual --> Root merged fixed report head `3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e` as `2d35cd49c203820d24d7c38acead06d37793c1f1`; the complete merge tree matches the independently reviewed report. No workflow or required status exists in this document repository (CI=N/A); trial GATE links remain in the report. Expansion remains a separate user decision.
weichen added 1 commit 2026-10-14 04:51:04 +00:00
Why: The approved U6 plan requires a reviewable account of three real serial deliveries, CI costs, recovery paths, and manual adoption limits.

Evidence: Dev #489/#488/#486 fixed-head Actions runs 3038/3050/3067 and main runs 3040/3053/3068; component PRs and Issue #518 preserve raw SELF and independent REPLAY.

Impact: Document observed behavior and untested automatic coordination boundaries without changing product code or declaring rollout authority.

Refs: Dev issue #518; merge queue implementation plan U6
weichen merged commit 2d35cd49c2 into main 2026-10-14 04:51:47 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Documents#101