Why: The approved merge queue U6 plan requires an evidence-linked record of three real controlled deliveries before deciding whether to expand the manual trial.
Result: Add the 2026-10-14 trial report with actual component dependencies, R0/base/head/merge objects, final PR and main-push CI costs, no-op syncs, recovery events, and MQ1–MQ9 limits. It distinguishes manual coordination from untested automatic fencing and leaves expansion for user review.
Evidence: git diff --check and the relative-link check passed on fixed head 3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e. Independent REPLAY /root/merge_queue_review passed this exact report (/tmp/mq-u6-report-final-independent-review-20261014.json). The report links the actual GATE runs and primary PRs. This document repository defines no Actions CI workflow, so CI is N/A here; Dev component and parent CI are listed in the report.
Impact: Documentation only; no product code, branch protection, shared database, or live service change.
Refs: Dev queue #518; approved merge queue implementation plan U6.
Root merged fixed report head 3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e as 2d35cd49c203820d24d7c38acead06d37793c1f1; the complete merge tree matches the independently reviewed report. No workflow or required status exists in this document repository (CI=N/A); trial GATE links remain in the report. Expansion remains a separate user decision.
Why: The approved merge queue U6 plan requires an evidence-linked record of three real controlled deliveries before deciding whether to expand the manual trial.
Result: Add the 2026-10-14 trial report with actual component dependencies, R0/base/head/merge objects, final PR and main-push CI costs, no-op syncs, recovery events, and MQ1–MQ9 limits. It distinguishes manual coordination from untested automatic fencing and leaves expansion for user review.
Evidence: `git diff --check` and the relative-link check passed on fixed head `3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e`. Independent REPLAY `/root/merge_queue_review` passed this exact report (`/tmp/mq-u6-report-final-independent-review-20261014.json`). The report links the actual GATE runs and primary PRs. This document repository defines no Actions CI workflow, so CI is N/A here; Dev component and parent CI are listed in the report.
Impact: Documentation only; no product code, branch protection, shared database, or live service change.
Refs: Dev queue #518; approved merge queue implementation plan U6.
<!-- mq-u6-report-actual -->
Root merged fixed report head `3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e` as `2d35cd49c203820d24d7c38acead06d37793c1f1`; the complete merge tree matches the independently reviewed report. No workflow or required status exists in this document repository (CI=N/A); trial GATE links remain in the report. Expansion remains a separate user decision.
Why: The approved U6 plan requires a reviewable account of three real serial deliveries, CI costs, recovery paths, and manual adoption limits.
Evidence: Dev #489/#488/#486 fixed-head Actions runs 3038/3050/3067 and main runs 3040/3053/3068; component PRs and Issue #518 preserve raw SELF and independent REPLAY.
Impact: Document observed behavior and untested automatic coordination boundaries without changing product code or declaring rollout authority.
Refs: Dev issue #518; merge queue implementation plan U6
weichen
merged commit 2d35cd49c2 into main2026-10-14 04:51:47 +00:00
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Why: The approved merge queue U6 plan requires an evidence-linked record of three real controlled deliveries before deciding whether to expand the manual trial.
Result: Add the 2026-10-14 trial report with actual component dependencies, R0/base/head/merge objects, final PR and main-push CI costs, no-op syncs, recovery events, and MQ1–MQ9 limits. It distinguishes manual coordination from untested automatic fencing and leaves expansion for user review.
Evidence:
git diff --checkand the relative-link check passed on fixed head3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9e. Independent REPLAY/root/merge_queue_reviewpassed this exact report (/tmp/mq-u6-report-final-independent-review-20261014.json). The report links the actual GATE runs and primary PRs. This document repository defines no Actions CI workflow, so CI is N/A here; Dev component and parent CI are listed in the report.Impact: Documentation only; no product code, branch protection, shared database, or live service change.
Refs: Dev queue #518; approved merge queue implementation plan U6.
Root merged fixed report head
3e0cdae1bfa0da3c3cb4dfacaba15431d9426e9eas2d35cd49c203820d24d7c38acead06d37793c1f1; the complete merge tree matches the independently reviewed report. No workflow or required status exists in this document repository (CI=N/A); trial GATE links remain in the report. Expansion remains a separate user decision.