weichen a042edaa73 Propose the Q2 and Q3 implementation plans: topologies and convergence
Why: N1-N3/Q1/I1-I2 are closed; per the completion doc dependency
order Q2 then Q3 are next. Both need plans grounded in current code:
squad has no topology abstraction (two modes, dormant Cond
combinators, dead FactItem.Verified), RespondDecision has no actor
attribution (the mailbox acceptance attack surface), WorkflowDef
execution compresses steps into SpawnSubagent, and adapters/a2a does
not exist.
Evidence: three-area survey with file:line citations at the pinned
baselines (agent-squad c462bc4, backend 6e02a1f); the review
equivalence baseline is quoted from backend runReview with its test
anchors; the P4 ruling is quoted verbatim from agent-harness.md.
Impact: documentation only; Q2 implementation starts after merge,
Q3 after Q2 closes.
Refs: 2026-10-02-agent-stack-completion.md Q2/Q3 sections
2026-10-07 23:27:56 +00:00
2026-09-29 18:07:44 +00:00

Agent-System-Documents

系统文档与过程记录仓:架构决策、方案与验证记录、使用与插件开发指南;不含产品代码。

目录

docs/
  proposals/   设计方案(骨架设计/方案/计划,含 D1–D16 决策)
  guides/      使用报告 · 插件开发指南
  reports/     测试报告
  records/     实施记录(阶段、决策、偏差)

当前版本

0.1.0(2026-09-29):使用报告 · 测试报告 · 实施记录 · 设计方案

规范基线:Development-Guidelines(Dev 仓 deps/development-guidelines)。

S
Description
系统文档与过程记录仓:架构决策、方案与验证记录、插件开发指南;不含产品代码。
Readme
2.8 MiB
Languages
Shell 100%