weichen a379a9fbe6 Backfill the E1 increment completion in the plan and index
Why: The E1 quick-fix increment landed (delegate full text, MiniMax
reasoning split, sandbox deps layer, parallel tool execution with kernel
ordering) and the proposal is the master record, so its stage table and
the index row must reflect the actual progress with links.

Evidence: Agent-Native #42/#43/#44, Backend #127, Dev task
feature/agent-e1-parallel-fixes (live verification receipts: F2 zero
think-leak, F3 sandbox IMPORTS-OK, F5 concurrent overlap; eval
toolFailures 19->11, unverifiedFacts 7->12 recorded honestly).

Impact: Documents-only progress backfill; E2-E5/S0 remain unauthorized.
2026-10-10 09:47:25 +00:00

Agent-System-Documents

系统文档与过程记录仓:架构决策、方案与验证记录、使用与插件开发指南;不含产品代码。

从 项目方向与规划索引 查找主记录、里程碑、关联任务及待确认差异。 索引给出固定版本的核验快照;方案批准、PR 合入和运行验收分别记录。

目录

docs/
  proposals/   设计方案(骨架设计/方案/计划,含 D1–D16 决策)
  guides/      使用报告 · 插件开发指南
  reports/     测试报告
  records/     实施记录(阶段、决策、偏差)

当前版本

0.1.0(2026-09-29):使用报告 · 测试报告 · 实施记录 · 设计方案

规范基线:Development-Guidelines(Dev 仓 deps/development-guidelines)。

S
Description
系统文档与过程记录仓:架构决策、方案与验证记录、插件开发指南;不含产品代码。
Readme
2.8 MiB
Languages
Shell 100%