Commit Graph
481 Commits
Author SHA1 Message Date
weichenandCursor 1a5afe219d Point the service at four-model vision routing
Why: Chat, lightweight, fallback and vision settings need a seed path, and the backend now sends current-turn images only to models declared capable of seeing them.

Evidence: The backend change is cfde38d. The seed test covers fallback and vision settings. A local image conversation on each builtin profile returned the pictured content from the expected model, and removing the chat model from the capable list switched that turn to the vision model.

Impact: New runs can use the four builtin profiles and image input. Secrets stay in the ignored env file. The live 8788 process is unchanged.

Refs: .task/feature-four-model-vision.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-14 17:51:29 +00:00
weichen dde99af83d Merge current main into work companion integration
Why: Dev main advanced with a vendor skills task while this UI combination was being verified.

Evidence: Backend main ead5ade contains both Backend #199 and #200; the component merge affects recipes, not run-history handlers.

Impact: Preserve the new main task card and pin the Backend merge containing both changes; combination checks follow on this head.

Refs: Agent-System-Dev #550; Agent-System-Backend #199 and #200
2026-10-14 15:01:07 +00:00
weichen c79458793e Integrate work companion visibility across components
ci / svc-realcombo (pull_request) Successful in 3m0s
ci / test (pull_request) Failing after 4m49s
ci / test-pg (pull_request) Successful in 13m36s
Why: The fast and slow channel UI duplicated work cards and hid intermediate output after the final reply.

Evidence: SELF isolated-network make test and make build; 15 browser scenarios; independent component review; component PRs #55, #199, #85.

Impact: Pin merged Backend, Frontend and UI revisions and update DESIGN.md for one detail location and durable folded history.

Refs: .task/feature-work-companion-visibility.md; Agent-System-UI #55; Agent-System-Backend #199; Agent-System-Frontend #85
2026-10-14 14:52:04 +00:00
weichen c27400fb33 Bump backend pin for vendored skills 2026-10-14 14:14:44 +00:00
weichen 3c29e3cd1f Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 09:41:51 +00:00
weichen 32a678f7ed Pin the DHF plan progress-note update in Documents
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.

Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.

Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.

Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
2026-10-14 09:41:20 +00:00
weichen fc929bd2a3 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 08:49:43 +00:00
weichen 3707d6b964 Bump backend pin with backfill fixture fix 2026-10-14 07:42:36 +00:00
weichen d16917cb4e Pin reviewed DHF plan status in Documents
Why: Stage 8 review found that the main plan still described the approved increment as a draft.

Evidence: Documents commit 6619835 adds a dated status note without changing the approved plan body; the first pre-commit combination check correctly rejected the uncommitted pin drift.

Impact: Dev now records the exact Documents component SHA for renewed combination validation.

Refs: Documents PR #102; Dev PR #540; DHF U1 Stage 8 review
2026-10-14 07:40:41 +00:00
weichen 158d33b638 Bump backend pin for pptx structural gate 2026-10-14 07:36:53 +00:00
weichen f628e6b38b Advance DHF Documents pin after main sync
Why: The Documents main gained an unrelated merge-queue report before PR submission, so the feature branch must include the current authoritative base.

Evidence: Comparing c256558 and fdca353 shows only the merge-queue report changed; the DHF plan, index and asset inventory retain their bytes. Dev combination tests follow on this exact pin.

Impact: Update the Documents gitlink and stage-seven trace; no DHF package, publication or runtime data change.

Refs: .task/feature-dhf-template-pipeline-plan.md
2026-10-14 06:37:41 +00:00
weichen c5eae5d488 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=4f84c2e1630cd0311643529fae1c3a99f1dd5d64.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 06:13:02 +00:00
weichen 665955279b Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=d852c159b6b3387a2f418a42ab6d3696ac873d01.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 04:16:47 +00:00
weichen 1f347c5ec4 Pin the merged account transaction backend
Why: The Dev U7 task must consume the actual reviewed Backend merge and record the current agent-only delivery authorization.

Evidence: Backend #185 merged as 8e80e261 after independent REPLAY and exact-head GATE run 3062; task card preserves the original SELF resume receipt.

Impact: Advance the Backend gitlink to the merged component; parent combination and CI remain pending final synchronization.

Refs: Dev #486; Backend #185; Dev queue #518
2026-10-14 04:15:55 +00:00
weichen 205b611ca6 Record approved DHF U1 progress and Documents pin
Why: Keep the Dev project entry and task record aligned with the approved DHF implementation and saved U1 evidence.

Evidence: SELF make test passed on the Dev combination with Documents c256558; the complete output is in the task card.

Impact: Advances only the Documents pin and progress metadata; no template publication, migration, or deployment.

Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
2026-10-14 03:27:57 +00:00
weichen 3e39e8fcdb Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=f00165e8d71e4dc8ba0ceb7dc50c1a8a3deb6d60.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 03:21:51 +00:00
weichen 000eb75245 Pin delivered frontend export and record current dependency
Why: Prepare genuine Dev #488 for its final window using actually merged component versions and the authorized agent merge scope.

Evidence: Frontend PR 73 tree-identical merge and independent review; RDM PR 301 GATE3044, independent replay, Root merge ef510. Full Dev combination and exact-head CI remain pending.

Impact: Advances the frontend pin and task record only; current target main sync follows in the scheduled final window.

Refs: Dev PR #488; Frontend PR #73; RDM PR #301; Issue #518
2026-10-14 03:19:40 +00:00
weichen 143228d85f Record approval and preserve the DHF implementation baseline
Why: Resume the approved DHF work from saved planning artifacts and a clean task tree.

Evidence: Startup failure and combination-check receipts are retained in the task card.

Impact: Planning entry, task authorization and Documents composition only.

Refs: feature/dhf-template-pipeline-plan; DHF plan r0.1
2026-10-14 02:00:44 +00:00
weichen 839b2a3af0 Synchronize proposal status delivery with the current integration baseline
Why: restore the assigned task against the current target while retaining its original baseline and all newer component capabilities.
Evidence: startup precheck and real parent/component sync receipts capture the original conflict; Documents PR89 was independently reviewed, merged by the agent, and its tree verified.
Impact: include origin/main and the delivered documentation merge 7bd4e17827d4c7c88647bf3c9199c495b60cb107 without rewriting task history or pushing waiting branches.
Refs: Dev PR #489; Documents PR #89; merge queue Issue #518; user takeover authorization on 2026-10-14
2026-10-14 01:18:47 +00:00
weichen d26e1b0b5b Adopt the approved IAM projection contract and delivery evidence
Why: Carry the actual merged contract and approved permission implementation boundary into the integration composition.

Evidence: Documents PR 99 merged as a7ff466d9ae91fc67a53d2bf4991f47fc63a2a4c after independent review and verified source digest; RDM PR 360 preserves actual-actor projection semantics.

Impact: Update documentation pin, navigation and delivery records only; new composition tests and final-head CI remain required.

Refs: IAM I1 permission contract section 8; Documents PRs 98 and 99; RDM PR 360.
2026-10-13 16:26:05 +00:00
weichen f3c0551feb Adopt the reviewed IAM contract from merged Documents
Why: Record user acceptance and use the actual merged permission contract in the integration composition.

Evidence: Documents PR 98 merged as 3cf263962bd106529ee0531c8415cb16eecedfe3; independent document review and full SELF receipts retained in the task record.

Impact: Advance only Documents and delivery evidence; full IAM later increments and deployment remain outside scope.

Refs: Documents PR 98; IAM I1 U1-U2; policy/delivery.md stages 8-9.
2026-10-13 15:41:52 +00:00
weichen 4af5956eb7 Pin the I1 formal acceptance report
Why: Keep the user-approved implementation and pending acceptance separate in the fixed integration records.

Evidence: Current Dev make test passed at10789653 and RDM combined checks passed at70e27b08; final text-only combination is verified next.

Impact: Documents and card records only; no permission source, pins in RDM, existing services or production data changes.

Refs: I1 stage 7 acceptance candidate
2026-10-13 14:52:43 +00:00
weichen 10789653f9 Save the approved I1 objects and bounded acceptance stage
Why: Preserve the human stage 6 approval separately from the synchronized formal test candidate.

Evidence: Original reviewed objects and the user approval are recorded; startup recovery and synchronization outputs are captured as complete SELF receipts.

Impact: Advance approval records only, retain all upstream membership records and enter planned I1 API/command verification. No production operations or later increments started.

Refs: User approval; policy/delivery.md stage 6 to 7
2026-10-13 14:31:56 +00:00
weichen 10e484ca87 Restore the I1 workspace on the current integration baseline
Why: The resumed task requires a fresh baseline before recording the approved implementation and formal checks.

Evidence: Startup identified SYNC_REQUIRED; Documents pointer conflict was resolved by merging the referenced upstream commit while preserving all three approved I1 documents byte-for-byte.

Impact: Workspace recovery only; retain incoming project-membership records and the fixed I1 approval objects. Formal checks remain pending.

Refs: User approval of I1 implementation; policy/governance.md startup and recovery
2026-10-13 14:22:19 +00:00
weichen 3606ed4ee8 Select merged project membership components
Why: The final base combination must reference actual reviewed main commits.

Evidence: Component PRs are merged, and each merged tree matches the independently tested candidate; whole review receipts remain unmodified.

Impact: Advance gitlinks and preserve acceptance evidence; new exact-head CI follows with no runtime changes.

Refs: Backend195 Frontend82 Documents97; feature/project-member-access
2026-10-13 11:53:42 +00:00
weichen 8419c1b584 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=946cc13c9a10a2023a766b211e1148e625b62943.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 11:35:37 +00:00
weichen 033db6f7ec Bump frontend pin to set-role rename 42cda9c
Why: Frontend #83(member.set-role 调用点改名)合入后的顶层组合——同时是 RDM #350 改名的组合校验载体。
Evidence: check-pins 由 CI 复核;组合验证由本 PR 三作业承担。
Impact: gitlink 一枚。
Refs: RDM #350;Frontend #83
2026-10-13 11:14:56 +00:00
weichen 82acec9ee3 Compose the final private project event candidate
Why: Existing upload history must stay private after project adoption, and final object evidence must remain traceable.

Evidence: Original tool receipts and independent reports saved byte-for-byte; new fixed combination and CI remain pending.

Impact: Select Backend d26f3cf and proposal r1.1 with unchanged public downstream contracts; preserve workspaces and live data.

Refs: feature/project-member-access; Frontend PR82; Documents PR97
2026-10-13 11:14:22 +00:00
weichen 1484c58763 Save I1 local verification and the review record
Why: Keep the reviewable contract and observed verification together in the fixed parent composition.

Evidence: Dev make test passed on 0ab70b0c and RDM make test passed on ef075bd1, recorded as complete SELF receipts. Final parent pin verification follows this metadata checkpoint.

Impact: Advance the text-only review record and save evidence; no implementation components changed.

Refs: IAM I1 U1-U2 local review
2026-10-13 10:46:39 +00:00
weichen d03c1d4cde Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=143e6367367760deceac91ac3de5ccb3ed6adebc.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 10:39:24 +00:00
weichen 5869f74aa5 Pin the I1 contract and local review record
Why: Keep the accepted IAM direction and I1 review entry visible from the authoritative integration checkout.

Evidence: Full SELF document consistency receipts are recorded in the I1 task card. Final synchronized parent combination verification follows this checkpoint.

Impact: Advance Documents only and record I1 local authorization; backend, frontend and UI behavior pins remain unchanged.

Refs: Approved IAM plan r1; I1 U1-U2
2026-10-13 10:39:21 +00:00
weichen 712481b9bd Compose reviewed project upload and duty fixes
Why: Final review and real composition exposed member upload rejection, private project cards and stale duty selection.

Evidence: Component correction receipts and fixed clean source SHAs; independent replays and final composition are in progress.

Impact: Select Backend d2f96e7 and Frontend 2ba275b with current UI, preserving private originals and verified project commands.

Refs: feature/project-member-access
2026-10-13 10:24:30 +00:00
weichen 9f522657b0 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=86d975b822c2384e96edd75f9c3a2dca63593b3a.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 10:02:54 +00:00
weichen 23522b3f65 Bump frontend pin to duties and permission page rebuild
ci / svc-realcombo (pull_request) Successful in 1m45s
ci / test (pull_request) Successful in 4m53s
ci / test-pg (pull_request) Successful in 7m38s
Why: P7-B/C(Frontend #81:职责页清单+详情+批量;权限页矩阵+三态覆盖)合入后的顶层组合。
Evidence: check-pins 通过;组合验证由本 PR 三作业 CI 承担。
Impact: gitlink 一枚。
Refs: 提案 r1 P7;Dev 任务卡
2026-10-13 09:57:30 +00:00
weichen 0a5d218b06 Compose system project membership implementation candidates
Why: Host-only project creation and domain membership must form one verified identity.

Evidence: Tool-imported SELF receipts and independent Backend and Frontend replay attestations; composed acceptance and final CI remain in progress.

Impact: Advance fixed component pins and record the authorized implementation and privacy boundaries without deployment or runtime changes.

Refs: .task/feature-project-member-access.md; system-project-membership proposal r1
2026-10-13 09:57:00 +00:00
weichen 674fad0a85 Bump UI and frontend pins to picker integration
ci / svc-realcombo (pull_request) Successful in 1m46s
ci / test (pull_request) Successful in 4m51s
ci / test-pg (pull_request) Successful in 7m47s
Why: P5+P7-A 组合——UI #53(Picker 原语)与 Frontend #80(成员页接入)合入后的顶层 pin 前进。
Evidence: check-pins 通过;组合验证由本 PR 的三作业 CI 承担。
Impact: gitlink 两枚。
Refs: 提案 r1 P5/P7;Dev 任务卡
2026-10-13 09:36:36 +00:00
weichen ae76efbc78 Bump UI pin to regenerated contracts mirror 88122c8
ci / svc-realcombo (pull_request) Successful in 1m43s
ci / test (pull_request) Successful in 4m58s
ci / test-pg (pull_request) Successful in 7m26s
Why: Core 权威 TS 补受管 scope 后的镜像链闭合——Core #32 → Backend #194(嵌套 pin)→ UI #52(contracts 镜像)→ Dev 组合。
Evidence: 本地 make build 前置检查仅剩 gitlink 漂移(本提交闭合);组合验证由本 PR CI 承担。
Impact: gitlink 一枚。
2026-10-13 07:29:36 +00:00
weichen ddee8d5460 Bump backend pin to embedded core sync 15566f9a
ci / svc-realcombo (pull_request) Successful in 1m50s
ci / test (pull_request) Failing after 4m36s
ci / test-pg (pull_request) Successful in 7m56s
Why: Backend PR 194(嵌套 core pin 同步)合入后的 Dev 顶层组合 bump,闭合三层全等。
Evidence: check-pins 通过;组合验证由本 PR CI 承担。
Impact: gitlink 一枚。
2026-10-13 07:12:30 +00:00
weichen e8e436d009 Bump core pin to TS mirror fix
ci / svc-realcombo (pull_request) Successful in 1m53s
ci / test (pull_request) Failing after 3m33s
ci / test-pg (pull_request) Successful in 8m27s
Why: Core PR 32 把受管 scope 补进权威 TS 镜像,修复 Dev 组合构建的 contracts 再生成覆盖(嵌套 pin 同步对齐)。
Evidence: check-pins 由 CI 复核;Core go test 全绿。
Impact: gitlink 两枚。
2026-10-13 06:54:45 +00:00
weichen dc679e9ded Bump frontend and backend pins; register account facts F5/F6
ci / svc-realcombo (pull_request) Failing after 34s
ci / test-pg (pull_request) Failing after 2m34s
ci / test (pull_request) Failing after 4m24s
Why: P2 前端系统设置面板(Frontend #78)与 P3 账号搜索扩展(Backend #191)已合入各仓 main,组合 bump 进 Dev;账号姓名字段与停用能力现状按门禁登记 facts。
Evidence: check-pins 通过(evidence 写卡);组合验证由本 PR 的 Dev CI 承担(test/test-pg/svc-realcombo);前端 design-guard 6/6 与 tsc/build 在 Frontend PR 内完成。
Impact: gitlink 两枚 + facts F5/F6 新增。
Refs: 提案 r1 P2/P3;Frontend #78;Backend #191;RDM #345/#346
2026-10-13 06:41:34 +00:00
weichen d518b3eab2 Close the login recovery contract leftovers in Dev
Why: The remaining open items (API-key SSE closure, cross-instance
redeem backoff, U7 atomic bootstrap/create, CLI credential delivery)
landed in Backend #192; Dev pins it and closes the contract leftovers.

Evidence: Backend #192 CI success at head bc1e0a3 (GATE); composite CI
on this PR re-runs the suite incl. test-pg (GATE).

Impact: backend pin cfb8308; contract leftover section now records all
items closed; task card H1-H6 requirement table.

Refs: Backend #192; docs/svc-deploy/2026-10-13-login-recovery-contract.md.
2026-10-13 06:07:57 +00:00
weichen 0b32c75064 Merge origin/main, keep main-side mock comment in multi-instance test 2026-10-13 05:21:40 +00:00
weichen 68cb9eb76e Merge origin/main into feature/rdm-increment-settings-duties 2026-10-13 05:20:58 +00:00
weichen 396b89836a Adapt multi-instance acceptance to system-managed mock
ci / svc-realcombo (pull_request) Successful in 2m7s
ci / test-pg (pull_request) Successful in 2m59s
ci / test (pull_request) Successful in 4m57s
Why: P2 受管把 runtime.mock 收进系统层——Backend #190 让 --mock 播种系统层(对全部租户生效),两进程验收随之简化:去掉逐租户显式开启,backend pin 前进到 741da4a。
Evidence: 本地真实 PG(容器)+ AGENT_BIN 跑 make test-multi-instance 全绿(15.3s);此前 --mock 经 user 层写入被受管拦截导致实例无法启动的根因已由 Backend #190 修复并复验。
Impact: 测试文件与 gitlink;无产品代码变更。
Refs: 提案 r1 P2;Backend PR #188/#190
2026-10-13 05:14:44 +00:00
weichen 7518cdeb7d Align the core pin with backend's nested agent-system-core pin
ci / svc-realcombo (pull_request) Successful in 1m45s
ci / test-pg (pull_request) Successful in 2m39s
ci / test (pull_request) Successful in 4m47s
Why: check-pins failed on the follow-up CI: the newly pinned backend
(741da4a) carries deps/agent-system-core at 0f94e4b while Dev's
modules/core stayed at ba289e7 - the three-layer pin rule requires the
top-level core pin to match.

Evidence: 0f94e4b verified as an ancestor of Core origin/main; this
PR's composite CI re-runs check-pins (GATE).

Impact: modules/core gitlink to 0f94e4b; no source changes.

Refs: check-pins failure on job 4204.
2026-10-13 04:52:42 +00:00
weichen ecf310fcf1 Fix multi-instance seeding for system-managed settings and repin backend
ci / svc-realcombo (pull_request) Successful in 2m22s
ci / test-pg (pull_request) Successful in 3m16s
ci / test (pull_request) Failing after 3m49s
Why: The follow-up CI exposed that backend #188 broke the Dev
multi-instance suite: serve --mock seeded runtime.mock at the user
scope, which system-managed settings now reject, so instances never
became healthy. Backend #190 seeds the startup flag into the system
scope; this PR repins and drops the now-invalid alice user-scope write.

Evidence: Backend #190 CI success at head 0af1ebc (GATE); this PR's
composite CI re-runs make test-multi-instance (GATE for the fix).

Impact: backend pin 741da4a; multi-instance test comments updated to
the system-managed regime.

Refs: Backend #188, #190.
2026-10-13 04:47:23 +00:00
weichen 15861a0713 Wire login recovery follow-up: SSE close, browser e2e, proposal r3
ci / svc-realcombo (pull_request) Successful in 1m57s
ci / test-pg (pull_request) Failing after 2m29s
ci / test (pull_request) Failing after 3m32s
Why: The completion audit flagged four gaps over the merged login
recovery implementation: real-browser acceptance, the login-key e2e
spec, SSE stream invalidation, and the Documents write-back.

Evidence: Browser acceptance receipts be7ae9a2/b3a9e691 (SELF, bound to
Dev HEAD 268ef29); Backend #189 CI success at head 8b73afe (GATE);
Documents #94 merged; this PR's composite CI is the GATE for frontend
pin 44b9646.

Impact: Pins backend=349a47d (SSE close) and frontend=44b9646 (e2e
spec); contract doc leftovers updated; task card carries the follow-up
record for closure.

Refs: docs/svc-deploy/2026-10-13-login-recovery-contract.md; Documents
proposal r3; Backend #189; Frontend #77.
2026-10-13 04:38:16 +00:00
weichen 70304498c3 Point core pin at merged main commit 0f94e4b0
ci / test-pg (pull_request) Failing after 2m44s
ci / test (pull_request) Successful in 5m30s
ci / svc-realcombo (pull_request) Successful in 2m19s
Why: 前一提交因本地缺 fetch 把 core gitlink 记成了分支头 aced665;Core main 的服务端合入提交是 0f94e4b0。
2026-10-13 04:30:23 +00:00
weichen 6aedcfac4b Bump backend and core pins to merged main
ci / test-pg (pull_request) Failing after 2m41s
ci / test (pull_request) Successful in 5m32s
ci / svc-realcombo (pull_request) Successful in 2m21s
Why: P2 组合 bump——Core 0f94e4b0(受管作用域契约)与 Backend 76c75ce5(受管拦截/系统设置 API/播种迁移)均已合入各仓 main。
Evidence: Backend CI(PR #188,rerun 后全绿)与本地 GOWORK=off go test 全绿;Core go test 全绿。
Impact: 仅 gitlink;Dev 组合 CI 将在 PR 上验证。
Refs: Agent-System-Documents PR #93 提案 r1 P2
2026-10-13 04:30:06 +00:00
weichen deb675fb6d Pin backend and frontend to the login recovery implementation
Why: The Dev composite must carry the exact backend (467718a) and
frontend (9fc7da2) commits implementing the login recovery contract.

Evidence: component branches pushed to their origins; make test runs in
this task worktree validate the composite (receipts in task card).

Impact: gitlink bump only; no other Dev tree changes.

Refs: docs/svc-deploy/2026-10-13-login-recovery-contract.md
2026-10-13 03:44:03 +00:00