Why: Final U4 combination must include the independently reviewed authorization and administration fixes.
Evidence: Backend SQLite and isolated PostgreSQL suites, RDM overlay full suite, Frontend tests/build, and independent final review passed.
Impact: Advances only Backend and Frontend gitlinks and records SELF evidence; RDM remains separately overlaid pending a trusted Backend release.
Refs: feature/iam-u4-role-authority
Why: The final U4 component combination needs an exact-head verification receipt.
Evidence: make evidence recorded make test exit 0 at 60133981c5.
Impact: Adds SELF evidence only; no source or component pin changes.
Refs: feature/iam-u4-role-authority
Why: The exact Dev combination must use the cleaned Backend-authoritative role and account administration surface.
Evidence: Frontend 280 tests, UI 163 tests, production build, and knip 43/43 passed.
Impact: Advances only the U4 Frontend gitlink and records prior combination evidence.
Refs: feature/iam-u4-role-authority
Why: The focused authorization module introduces four intentional dependencies that the architecture ratchet must review explicitly.
Evidence: make test-boundaries passed with 89 recorded edges after the initial full make test stopped at the unregistered-edge gate.
Impact: Records only app/authz, authz/store, server/authz, and store/authz; no unrelated dependency edge is admitted.
Refs: Focused role and permission system task 8
Why: Combination verification requires fixed Backend, Documents, Frontend, and UI component identities.
Evidence: Component suites passed; the first Dev make test was correctly rejected before gitlinks were fixed.
Impact: Pins the local U4 candidate for subsequent Dev tests; RDM remains separately verified through its Backend overlay.
Refs: Focused role and permission system task 8
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-iam-u4-role-authority.md; R0=99119a733830bc120cd6747b8b61736ea6da6078.
Impact: task metadata only; the feature workspace starts at 99119a7338.
Refs: .task/feature-iam-u4-role-authority.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=bc76b68cd075379122430acb24fa080b0a38ff5e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Main advanced during UI delivery and task metadata must identify the new combined candidate.
Evidence: task-sync source-out receipt 6122ca6; Backend ead5ade includes both reviewed run history and concurrent vendor skills.
Impact: Fill the task PR link and mark the new Backend combination and final checks pending.
Refs: Agent-System-Dev #550; Agent-System-Backend #199 and #200
Why: Dev main advanced with a vendor skills task while this UI combination was being verified.
Evidence: Backend main ead5ade contains both Backend #199 and #200; the component merge affects recipes, not run-history handlers.
Impact: Preserve the new main task card and pin the Backend merge containing both changes; combination checks follow on this head.
Refs: Agent-System-Dev #550; Agent-System-Backend #199 and #200
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-vendor-popular-skills.md(PR#549) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: The fast and slow channel UI duplicated work cards and hid intermediate output after the final reply.
Evidence: SELF isolated-network make test and make build; 15 browser scenarios; independent component review; component PRs #55, #199, #85.
Impact: Pin merged Backend, Frontend and UI revisions and update DESIGN.md for one detail location and durable folded history.
Refs: .task/feature-work-companion-visibility.md; Agent-System-UI #55; Agent-System-Backend #199; Agent-System-Frontend #85
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-vendor-popular-skills.md; R0=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: task metadata only; the feature workspace starts at e1bc2602e1.
Refs: .task/feature-vendor-popular-skills.md
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-work-companion-visibility.md; R0=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: task metadata only; the feature workspace starts at e1bc2602e1.
Refs: .task/feature-work-companion-visibility.md
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-plan-progress-note.md(PR#547) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.
Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.
Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.
Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pptx-register-structural-gate.md(PR#543) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-plan-progress-note.md; R0=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: task metadata only; the feature workspace starts at c8eead49c5.
Refs: .task/feature-dhf-plan-progress-note.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-card-merge-squash-detect.md(PR#544) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The archived card should remain accurate after its own closure PR merges.
Evidence: Only three temporal phrases changed; the card still points to PR #542 as the authoritative closure result.
Impact: Review, CI and cleanup records remain intact.
Refs: Dev PR #542