Commit Graph
1096 Commits
Author SHA1 Message Date
weichen 8865beb983 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=1f7217f5bb2657418845d6bec6ae28c56920ddc8; candidate=9b745e27361733380bc6511bdb8a4779ba31e27f.

Impact: task metadata only.

Refs: .task/feature-agent-stack-i1.md
2026-10-07 08:42:49 +00:00
weichen 9b745e2736 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=1f7217f5bb2657418845d6bec6ae28c56920ddc8.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-07 08:42:25 +00:00
weichen 3711be36ef Record the failed sync attempt receipt
Why: Failed runs' receipts belong to the card too.

Evidence: native fixtures restored; tree clean.

Impact: Task card only.
2026-10-07 08:42:23 +00:00
weichen c3e90bb673 Record increment three and the I1 verification results
ci / test (pull_request) Failing after 1m56s
Why: All six work packages landed; the card carries the acceptance
evidence and the recorded boundaries.

Evidence: CI success on the five PRs of this increment; make test
exit=0 at 037c678f; both eval suites green.

Impact: Task card only.
2026-10-07 08:37:24 +00:00
weichen 83bb8b3962 Record the eval-v2 pin test evidence
Why: The Dev combination passed make test; the receipt belongs to
the card.

Evidence: make test exit=0 at the amended head.

Impact: Task card only.
2026-10-07 08:36:52 +00:00
weichen 037c678fae Pin the merged I1 eval-v2 combination
Why: The I1 eval increments landed across the chain (intent #8,
squad #21/#22, native #22, backend #77/#78); Dev pins must point at
those merged component main heads.

Evidence: check-pins exit=0 after full matrix propagation.

Impact: Four gitlinks.

Refs: Agent-Intent PR #8; Agent-Squad PR #21/#22; Agent-Native PR #22; Agent-System-Backend PR #77/#78
2026-10-07 08:35:46 +00:00
weichen 1f7217f5bb Merge pull request 'Pin the merged I1 command-model and router combination' (#234) from feature/agent-stack-i1 into main
ci / test (push) Failing after 2m0s
2026-10-07 08:04:19 +00:00
weichen e793587677 Record increment two on the I1 task card
ci / test (pull_request) Failing after 2m9s
Why: WP2/WP3/WP4 landed through the chain; scope rulings and the
boundary fix belong to the record.

Evidence: CI success on the seven PRs; make test exit=0 at 612b51bd.

Impact: Task card only.
2026-10-07 08:02:56 +00:00
weichen b7beb9450d Record the post-baseline make test evidence
Why: lint-boundaries and lint-architecture both pass now; the
receipt belongs to the card.

Evidence: make test exit=0 at the amended head.

Impact: Task card only.
2026-10-07 08:02:38 +00:00
weichen 612b51bdb4 Register the route package edges in the architecture baseline
Why: The dependency ratchet blocks new edges by default; the unique
router's four edges (route->intentgate, runmgr->intentgate,
runmgr->route, server->route) are the I1 router's intended shape.

Evidence: lint-architecture.sh ok (73 edges) and negative probe ok.

Impact: Policy baseline only.
2026-10-07 08:01:31 +00:00
weichen 75434a429a Pin backend at the gate-surface projection head
Why: Backend PR #76 fixed the boundary violation by projecting the
command types through intentgate; the Dev pin must carry it for
lint-boundaries to pass.

Evidence: backend CI success on #76; check-pins ok.

Impact: One gitlink plus the card receipt.
2026-10-07 07:59:25 +00:00
weichen e780e1f765 Record the failed test-worktree attempt receipt
Why: The failed run's receipt belongs to the card; nested chains
are normalized now.

Evidence: all nested checkouts normalized; check-pins ok.

Impact: Task card only.
2026-10-07 07:55:51 +00:00
weichen 6c71ee5493 Pin the merged I1 command-model and router combination
Why: The I1 intent/router increments landed across the chain (intent
#6/#7, squad #19/#20, native #21, backend #74/#75); Dev pins must
point at those merged component main heads.

Evidence: check-pins exit=0 after the full cascade.

Impact: Four gitlinks.

Refs: Agent-Intent PR #6/#7; Agent-Squad PR #19/#20; Agent-Native PR #21; Agent-System-Backend PR #74/#75
2026-10-07 07:53:57 +00:00
weichen 3fc766085b Record the I1 task scope and increment one
Why: The card carries the authorized scope and the increment record.

Evidence: Agent-Intent PR #6 merged; intent suite green.

Impact: Task card only.
2026-10-07 07:29:16 +00:00
weichen 460603f659 Record the task card for feature-agent-stack-i1
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-agent-stack-i1.md; R0=3e8d2d3ba3e45589c93857f0cc6997ee3a9676d7.

Impact: task metadata only; the feature workspace starts at 3e8d2d3ba3.

Refs: .task/feature-agent-stack-i1.md
2026-10-07 07:07:07 +00:00
weichen 3e8d2d3ba3 Merge pull request 'Close the N1 task card' (#233) from feature/agent-stack-n1 into main
ci / test (push) Failing after 1m58s
2026-10-07 06:54:36 +00:00
weichen 01a9dcc36d Merge origin/main into the N1 closure branch
ci / test (pull_request) Failing after 2m3s
2026-10-07 06:54:05 +00:00
weichen 0de23d0d9d Close 1 merged task card(s) and archive them
ci / test (pull_request) Failing after 1m56s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-agent-stack-n1.md(PR#232) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-07 06:50:45 +00:00
weichen eb8719a91b Mark the N1 task card completed for folding
Why: All six work packages are merged and the acceptance clauses are
verified; the close scan only folds completed cards.

Evidence: twelve PRs merged across the chain; make test exit=0 at
d464d0a9; A/B and plugin-validation tests green.

Impact: Task card only.
2026-10-07 06:50:45 +00:00
weichen ae40cee917 Merge pull request 'Pin the merged WP5 gate-sinking combination' (#232) from feature/agent-stack-n1 into main
ci / test (push) Failing after 1m58s
2026-10-07 06:50:22 +00:00
weichen 1a4053810a Record the post-sync make test evidence
ci / test (pull_request) Failing after 1m55s
Why: Branch protection required the main merge commit in head; the
synced combination was retested.

Evidence: make test exit=0 at d78692c9 after syncing to b6974fa.

Impact: Task card only.
2026-10-07 06:49:51 +00:00
weichen d464d0a9b1 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=b6974fa0d6fba0d28984fcfcb4418c541b83f915; candidate=d78692c9d70c2291fa4b5ca5d5be2f9634199f09.

Impact: task metadata only.

Refs: .task/feature-agent-stack-n1.md
2026-10-07 06:48:36 +00:00
weichen d78692c9d7 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=b6974fa0d6fba0d28984fcfcb4418c541b83f915.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-07 06:48:10 +00:00
weichen acc0372927 Record the failed sync attempt receipt on the card
Why: The first task-sync attempt failed on a dirty tree; its receipt
is part of the record.

Evidence: transcript fixtures restored; tree clean.

Impact: Task card only.
2026-10-07 06:48:07 +00:00
weichen cbcfc30054 Record increment four and the N1 verification results
ci / test (pull_request) Failing after 1m56s
Why: All six work packages landed; the card carries the acceptance
evidence and the deferred follow-ups (WP6b/WP6c).

Evidence: CI success on the five PRs of this increment; make test
exit=0 at f9d51b3f; A/B tests green.

Impact: Task card only.
2026-10-07 06:42:24 +00:00
weichen f9d51b3f99 Pin the merged WP5 gate-sinking combination
Why: Increment four landed across the chain (native #19/#20, backend
#72, squad #18, backend #73); Dev pins must point at those merged
component main heads.

Evidence: check-pins exit=0; native c9c2f23, squad 7ecc04e and
backend 303983bd are direct merge commits on their component mains.

Impact: Three gitlinks.

Refs: Agent-Native PR #19/#20; Agent-Squad PR #18; Agent-System-Backend PR #72/#73
2026-10-07 06:40:40 +00:00
weichen b6974fa0d6 Merge pull request 'Pin the merged N1 spec and guardrails increments' (#231) from feature/agent-stack-n1 into main
ci / test (push) Successful in 2m40s
2026-10-07 05:24:55 +00:00
weichen af9eb8d82a Record the post-sync make test evidence
ci / test (pull_request) Successful in 2m13s
Why: Branch protection requires main in head; the synced combination
was retested and the receipt belongs to the card.

Evidence: make test exit=0 at c2e5de0d after syncing to main 42f5ac4.

Impact: Task card only.
2026-10-07 05:24:24 +00:00
weichen c2e5de0d63 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=42f5ac4b763fcbfaf9490bb8943c970cb0f4d293; candidate=a4e4ac8b5aa9982316a1567515d3f631213f6b1e.

Impact: task metadata only.

Refs: .task/feature-agent-stack-n1.md
2026-10-07 05:22:56 +00:00
weichen a4e4ac8b5a Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=42f5ac4b763fcbfaf9490bb8943c970cb0f4d293.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-07 05:22:32 +00:00
weichen 2c37f83c88 Record increment three on the N1 task card
ci / test (pull_request) Successful in 2m12s
Why: WP1/WP4 landed through the native/squad/backend chain; the card
records scope rulings and evidence.

Evidence: CI success on #18/#17/#71; make test exit=0 at fa0e30bd.

Impact: Task card only.
2026-10-07 05:18:00 +00:00
weichen fa0e30bd83 Pin the merged N1 spec and guardrails increments
Why: Increment three landed across the chain (native #18, squad #17,
backend #71); Dev pins must point at those merged component main
heads so the tested combination is the released one.

Evidence: check-pins exit=0; native c5b9dca, squad fc9620e and
backend f0b0db9 are direct merge commits on their component mains.

Impact: Three gitlinks.

Refs: Agent-Native PR #18; Agent-Squad PR #17; Agent-System-Backend PR #71
2026-10-07 05:16:12 +00:00
weichen 02180816e0 Record the merge cascade for increments one and two
Why: The pin cascade (#17, #69, #16, #70, #230) is part of the
delivery record; the card reflects the current merged pins.

Evidence: all five PRs merged; Dev pins at native c2befaf, squad
a75d359, backend d34c2e8; make test exit=0 at 3f824790.

Impact: Task card only.
2026-10-07 04:49:31 +00:00
weichen 42f5ac4b76 Merge pull request 'Pin the merged N1 ask-loop combination' (#230) from feature/agent-stack-n1 into main
ci / test (push) Successful in 2m10s
2026-10-07 04:48:47 +00:00
weichen 479f7163e0 Record the cascaded pin test evidence on the task card
ci / test (pull_request) Successful in 2m11s
Why: The Dev-level pin combination (native c2befaf, squad a75d359,
backend d34c2e8) passed make test; the receipt belongs to the card.

Evidence: make test exit=0 at 3f824790; check-pins exit=0.

Impact: Task card only.
2026-10-07 04:47:18 +00:00
weichen 3f82479094 Pin the cascaded N1 combination from squad and backend
Why: Squad PR #16 and Backend PR #70 completed the pin cascade;
Dev's squad and backend pins must point at those merged heads for
check-pins to verify the tested combination.

Evidence: a75d359 is the #16 merge on squad main; backend main head
is the #70 merge; backend CI passed before each merge.

Impact: Two gitlinks.

Refs: Agent-Squad PR #16; Agent-System-Backend PR #70
2026-10-07 04:44:54 +00:00
weichen f318492334 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=9c9483ac54ff5355c86824ac94097e65e59dcb5d; candidate=f8525792c0b1c8c0e4b11e1bd2736e28fb57ad1b.

Impact: task metadata only.

Refs: .task/feature-agent-stack-n1.md
2026-10-07 04:40:04 +00:00
weichen f8525792c0 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=9c9483ac54ff5355c86824ac94097e65e59dcb5d.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-07 04:39:43 +00:00
weichen 3fb6e631db Pin the merged N1 ask-loop increments from native and backend
Why: Library PR #17 and Backend PR #69 are merged; the Dev pins must
point at the merged component main heads (native c2befaf, backend
fe0c5a4) so the tested combination is the released one.

Evidence: both pins are direct merge commits on their component
mains; backend CI passed at 4075cc6 before its merge.

Impact: Two gitlinks plus the task card evidence records.

Refs: Agent-Native PR #17; Agent-System-Backend PR #69
2026-10-07 04:39:40 +00:00
weichen 9c9483ac54 Merge pull request 'Propose the RDM phase plan (docs only)' (#229) from feature/rdm-phase-plan into main
ci / test (push) Successful in 2m10s
2026-10-07 04:34:51 +00:00
weichen 0384abc9af Close 1 merged task card(s) and archive them
ci / test (pull_request) Successful in 2m7s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-rdm-phase-plan.md(already-complete) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-07 04:34:40 +00:00
weichen 34e955f422 Mark the RDM phase plan card completed for folding
Why: The close scan only folds completed cards; the plan PRs are
approved for merge.

Evidence: Documents PR #41 and Dev PR #229 open at b8eaa16/2b1d949.

Impact: Task card only.
2026-10-07 04:34:39 +00:00
weichen 2b1d94939c Record the PR links and sync checkpoint on the task card
ci / test (pull_request) Successful in 2m8s
Why: The card and the PR description are the same document; links and
the sync record belong to the delivery record.

Evidence: Documents PR #41 and Dev PR #229 open; task-sync already up
to date at bc3f74f8.

Impact: Task card only.
2026-10-07 04:29:24 +00:00
weichen c592fb0b5b Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=df2b72b4803a17ef1b725c3125a31529f15f3272; candidate=bc3f74f8266deb9ee73e9e1fc74ce16b41ca0db2.

Impact: task metadata only.

Refs: .task/feature-rdm-phase-plan.md
2026-10-07 04:29:12 +00:00
weichen bc3f74f826 Record the make test evidence on the task card
ci / test (pull_request) Successful in 2m9s
Why: The evidence gate writes command output through make evidence;
commit it before the next capture so sync sees a clean tree.

Evidence: make test exit=0 at e698c646 (receipt in the card).

Impact: Task card only.
2026-10-07 04:28:27 +00:00
weichen e698c64624 Record the RDM phase plan task and pin the proposal
Why: Register the docs-only planning task and point the documents
gitlink at the phase-plan commit on its feature branch.

Evidence: task card carries the precheck receipt; documents commit
b8eaa16 holds the proposal.

Impact: Task card plus documents gitlink; no code changes.

Refs: docs/proposals/2026-10-07-rdm-phase-plan.md
2026-10-07 04:27:04 +00:00
weichen de4a66fd25 Record the task card for feature-rdm-phase-plan
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-rdm-phase-plan.md; R0=df2b72b4803a17ef1b725c3125a31529f15f3272.

Impact: task metadata only; the feature workspace starts at df2b72b480.

Refs: .task/feature-rdm-phase-plan.md
2026-10-07 04:22:46 +00:00
weichen c3df1d3255 Record increment two on the N1 task card
Why: Backend PR #69 and its test receipt join the delivery record.

Evidence: backend go vet + full go test ok at the backend branch head.

Impact: Task card only.
2026-10-07 04:05:36 +00:00
weichen df2b72b480 Merge pull request 'Archive iterative delivery with verified cleanup evidence' (#228) from feature/card-close-20261007-031829Z into main
ci / test (push) Successful in 2m10s
2026-10-07 03:29:09 +00:00
weichen 5f9e43abdb Record independent closure integrity verification
ci / test (pull_request) Successful in 2m11s
Why: preserve the independent audit of archived receipts and completed workspace disposal.

Evidence: SELF review verifies 29 receipt digests, unchanged failed-test originals and current Git cleanup state.

Impact: task records only; no code or component changes.

Refs: PR #227; .task/reviews/iterative-delivery-closure.json
2026-10-07 03:26:00 +00:00