Why: The user approved the r0.5 written design for detailed planning; the resulting plan must be traceable from the Dev task and project entry.
Evidence: Documents 25a561b passed link and diff checks; staged Dev make test completed exit 0 through make evidence in the task card.
Impact: Pin plan and approval status only. Product code, new paid model calls, merge, and deployment remain not run.
Refs: U3 r0.5 plan; Documents PR #95; Dev PR #512
Why: The single r0.4 A01 failed both staged-result and fast-feedback quality; the user approved writing a conservative next design.
Evidence: Documents 0d473fe link check and diff check; Dev staged-gitlink make test exit 0 through make evidence in the task card. The prior paid sample and independent assessment remain unchanged.
Impact: Add only design, navigation, and task traceability. Product behavior, paid model allowance, merge, and deployment remain unapproved.
Refs: U3 r0.5 design; Dev PR #512; Documents PR #95
Why: preserve the approved design decision and a staged, verifiable plan before code work.
Evidence: six tasks and thirty steps self-reviewed; local links pass; make test passed with Documents 276f885 staged, receipt imported as SELF.
Impact: documentation, task card and Documents gitlink only; no model calls or production behavior changes.
Refs: modules/documents/docs/proposals/2026-10-14-fast-slow-u3-r04-reliable-first-checkpoint-implementation-plan.md; .task/feature-fast-slow-u2-u3-plan.md
Why: preserve the failed A01 outcome and an actionable design for reliable staged material work.
Evidence: Documents links and diff checks pass; Dev make test passed with the staged Documents gitlink; original A01 and offline diagnostic receipts remain SELF.
Impact: documentation, task-card evidence and Documents pin only; no product behavior or model budget change.
Refs: modules/documents/docs/proposals/2026-10-14-fast-slow-u3-r04-reliable-first-checkpoint-design.md; .task/feature-fast-slow-u2-u3-plan.md
Why: The approved implementation and mechanism validation are complete, while the real-model quality gate remains unrun.
Evidence: Dev ef6f650 make test/build exit 0 with imported SELF receipt; Backend 5f53f80 independent code replay and v10 PostgreSQL/HTTP receipts are linked in the card.
Impact: Update task/project status for human stage-6 review; no provider request, merge or deployment.
Refs: Dev PR #512; Documents PR #95
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=415f9ac58ece9d9b63bd9b3fea39978bb847fcce.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=1e5c6b9c10ba77ed34663fd670138621a17342bd.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The approved r0.3 plan must run against the current project member and IAM mainline.
Evidence: First task-sync conflict receipt was imported; Backend full Go tests and Frontend test/build passed after resolving component interactions; git diff --cached --check passed.
Impact: Combine current main with the existing U3 draft, preserving both planning entries and the Backend private project event proof transaction.
Refs: Dev PR #512; Backend PR #193; Frontend PR #79; Documents PR #95
Why: The r0.2 real-model sample failed semantic quality, and the user approved the r0.3 written design for detailed planning.
Evidence: Prior r0.2 A01 report and imported SELF receipts remain in the task card; plan self-review and git diff --cached --check passed.
Impact: Pin Documents f608ae5 and update planning state; implementation and paid model trials remain gated.
Refs: Documents PR #95; Dev PR #512
Why: The failed A01 needs a documented next design while the six PRs remain draft and unmerged.
Evidence: Independent semantic FAIL and the committed r0.3 spec with resolved links and explicit no-paid/no-implementation boundary.
Impact: Project entry and task card point to a pending design review; no new semantic behavior is enabled.
Refs: U3 r0.2 A01 assessment, r0.3 design
Why: The approved document dependencies have been reviewed and merged. Their actual immutable merge commits must be fixed before final host validation, while operational activation remains a separate gate.
Evidence: Independent document replay and verified PR merges are recorded in the task card. The staged host combination passed make test with actual merged child pointers; final commit build/CI remains pending and will be recorded outside source.
Impact: Advance only the two reviewed merged child pins, expose the real plan path, and record partial stage-seven approval and pending activation. Preserve current main components and existing admission/owner boundaries.
Refs: Guidelines PR #5 (2f5b198); Documents PR #96 (129cc35); Dev PR #519; implementation plan U4-U6; Issue #518
Why: The resumed task requires a fresh baseline before recording the approved implementation and formal checks.
Evidence: Startup identified SYNC_REQUIRED; Documents pointer conflict was resolved by merging the referenced upstream commit while preserving all three approved I1 documents byte-for-byte.
Impact: Workspace recovery only; retain incoming project-membership records and the fixed I1 approval objects. Formal checks remain pending.
Refs: User approval of I1 implementation; policy/governance.md startup and recovery
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=20e086e48b9cec7f300feba5342db7a0661a4d4e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Keep the accepted IAM direction and I1 review entry visible from the authoritative integration checkout.
Evidence: Full SELF document consistency receipts are recorded in the I1 task card. Final synchronized parent combination verification follows this checkpoint.
Impact: Advance Documents only and record I1 local authorization; backend, frontend and UI behavior pins remain unchanged.
Refs: Approved IAM plan r1; I1 U1-U2
Why: Host-only project creation and domain membership must form one verified identity.
Evidence: Tool-imported SELF receipts and independent Backend and Frontend replay attestations; composed acceptance and final CI remain in progress.
Impact: Advance fixed component pins and record the authorized implementation and privacy boundaries without deployment or runtime changes.
Refs: .task/feature-project-member-access.md; system-project-membership proposal r1
Why: agents need consistent entrypoints and recording defaults to avoid retrying synchronization and CI outside the final delivery window.
Evidence: SELF generated-task-card red-green regression and governance suite recorded through make evidence; pending shared record created as Issue #518.
Impact: rules, task template and capability matrix stay explicit about pending activation, default strict startup, manual coordination and unchanged CI triggers.
Refs: U4; policy/merge-queue.md; .task/feature-merge-queue-policy-draft.md
Why: preserve the user's continuation from the delivered r1 specification into a concrete implementation and verification plan.
Evidence: precheck and plan source/link/example checks are preserved as SELF receipts in the task card; code, CI and platform trials remain NOT_RUN.
Impact: approval metadata, plan association and project entry only; the delivery mode remains unchanged and the plan awaits stage 5 review.
Refs: policy/merge-queue.md; .task/feature-merge-queue-policy-draft.md; Documents docs/proposals/2026-10-13-merge-queue-implementation-plan.md
Why: The project entry and task card must reflect current code evidence and the failed model gate.
Evidence: Native SELF receipts and independent review report cover the exact current component combination.
Impact: Save the report and status without merging or deploying the candidate.
Refs: U2/U3 plan r0.1
Why: prepare a reviewable delivery window and migration contract that reduces repeated synchronization while preserving final CI and approval requirements.
Evidence: SELF precheck, document checks and read-only platform observations are preserved in .task/feature-merge-queue-policy-draft.md; runtime queue and platform trials remain NOT_RUN.
Impact: proposed policy, project entry and task record only; scripts, workflow, platform protection and guideline gitlink are not changed by this draft.
Refs: policy/merge-queue.md; .task/feature-merge-queue-policy-draft.md
Why: Final task verification must include the latest authoritative composition.
Evidence: Task-sync receipt records incoming main and component conflicts; each component preserves both branches.
Impact: Retains artifact typed-nil recovery, RDM role rejection state, lifecycle governance, and task checkpoint changes.
Refs: fast-slow-u2-u3 task-sync
Why: The live deploy journal never called fault injection, and test-lifecycle failed closed on login so CI could not require the real combination cases.
Evidence: SELF python3 -m unittest tests.test_svc_u2.U2ReleaseTests -q exit 0 (35 ok, 1 skipped) on 3602a87; receipt sha256 9b5785577751e8e9e7947cf9700fb8854b1c80142f34273ae25f3097ee4c9aa8.
Impact: test-pg builds the Dev binary and runs make test-lifecycle. Login and full-track deploy without SVC_RDM_ORIGIN stay NOT_RUN. No live data move and no account CLI.
Refs: recovery plan D2/D3; Dev #485
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: preserve current-source evidence and the reviewable next increment.
Evidence: READY receipt at5212fef, exact source and open-PR audit; plan r0.1 remains pending stage5 review.
Impact: task record, proposal link and exact Documents pin; no business code or runtime changes.
Refs: fast-slow r1.1, work-companion PR493
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=2c016931044bebdc4a114c1ca1127d1b40d4ab17.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
# Conflicts:
# modules/documents
Why: isolate the approved interface work and fix its component baseline.
Evidence: imported startup precheck SELF receipt; source requirements and plan recorded in Documents.
Impact: task metadata, project links and authoritative UI/Frontend baselines; existing service state is untouched.
Refs: UI01-UI13 and work-companion-ui implementation plan r1.
Why: probing identity by running the subcommand still launched old RDM
builds, and ensure on a missing database created an empty one. A batch
update also inherited the caller's AGENT_SYSTEM_* variables.
Evidence: python3 -m unittest tests.test_svc_identity tests.test_svc_recover passed (41 tests, 1 skipped). tests.test_svc_lifecycle_isolation caller-env and restart cases passed.
Impact: capability probes use version --json only. Established instances
refuse a missing identity row until adopt --confirm. update and recover
run each service in a clean environment. serve reads a 0600 serve.env
and does not inherit the caller environment. Backend and documents pins
move to the D1 identity and recovery-plan commits.
Refs: recovery plan r3.1 D1; Backend feature/d1-identity-open; RDM feature/d1-version-json
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: preserve evidence, current contracts and the next review scope without changing the running system.
Evidence: SELF startup, sync and document validation receipts in the task card; runtime and fault acceptance NOT_RUN.
Impact: task metadata, planning index and account specifications only; component pins and business code unchanged.
Refs: feature/svc-account-durability-plan; Documents account r2 and recovery r3
Why: capture the 2026-10-12 approval so push/PR and U1/U4 starts are gated.
Evidence: SELF task-card update after user approval.
Impact: task metadata and Documents gitlink; no runtime change.
Refs: .task/feature-svc-unified-deploy-login-key.md
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: land the approved review conclusions as a formal proposal, U1/U4
specs, and draft task cards without starting business implementation.
Evidence: SELF precheck READY (receipt in task card); docs-only change.
Impact: planning docs and Documents gitlink; runtime behavior unchanged.
Refs: .task/feature-svc-unified-deploy-login-key.md
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: U2's first slice landed via main (PR #396/#401); the plan card's next-task line must point at the remaining U2 delta instead of the closed task.
Evidence: SELF - documents gitlink advanced; merged main range 555fb2162f..c622372 (96 commits) inspected.
Impact: task metadata and submodule pointer only.
Refs: .task/archive/feature-svc-autorecover.md
Why: stage-review table, phase line and next-task line must carry the 2026-10-12 approval and vehicle decision.
Evidence: SELF - user decision; documents gitlink advanced to the approval-record commit.
Impact: task metadata and submodule pointer only.
Refs: modules/documents/docs/records/2026-10-12-service-restart-data-recovery-review.md
Why: the reviewed candidate moves from untracked drafts to a fixed two-repo combination; task card and project index must reference r2 and record the svc-autorecover ownership decision as a human gate.
Evidence: SELF - documents gitlink cbc64eb (r1 pinned at 54fc24e, revised to r2 with SHA256 9cfda252...); resume precheck receipt imported above; task-sync merged origin/main 555fb2162f cleanly.
Impact: task metadata, submodule pointer and index only; no business code, no push/PR.
Refs: modules/documents/docs/records/2026-10-12-service-restart-data-recovery-review.md (round 2)
Why: finish the prior session's in-flight records so the tree is clean before the resume precheck (P1.1 object pinning).
Evidence: SELF - documents gitlink now points at 54fc24e (proposal r1 + review record + INDEX); task card carries the prior session's evidence rows and authorization scope.
Impact: task metadata and submodule pointer only; no business code.
Refs: modules/documents/docs/proposals/2026-10-12-service-restart-data-recovery.md
Why: resolve the interrupted sync: take the reconciled Documents pin eb36571 (union of U2 progress and template/final-target plans) plus main's card/PROJECT updates.
Evidence: Documents PR #68 merge eb36571; gitlink conflict resolved to the superset tip.
Impact: task-branch integration merge only.
Refs: Documents #68; Dev #340/#354
Why: the master record now records U2 as merged (Documents 559af219); the Dev gitlink and PROJECT.md entry must follow.
Evidence: Documents PR #67 merged=True (API); closeout doc check receipt in card; RDM PR #197 merge fe8a75b.
Impact: modules/documents gitlink, PROJECT.md planning entry, task card; no code change.
Refs: Documents PR #67; RDM PR #197/#198
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=866086c2a080716195c3dd35e6ef362016347c94.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: retain the clarified shared-project and private-document design with complete requirements coverage.
Evidence: SELF source receipt, 112-row requirements matrix, plan review and documentation checks in the task card.
Impact: local planning candidate only; no business implementation, push, merge to main or deployment.
Refs: modules/documents/docs/proposals/2026-10-11-rdm-final-target-completion.md
Why: the master record now records U1 as merged (Documents 2a5f658); the Dev gitlink and PROJECT.md entry must follow.
Evidence: Documents PR #66 merged=True (API); closeout doc check receipt in card; RDM PR #195 merge 05b7d1a.
Impact: modules/documents gitlink, PROJECT.md planning entry, task card; no code change.
Refs: Documents PR #66; RDM PR #195
Why: save this task owned pending documentation before resuming the broader system plan.
Evidence: user confirmation and SELF documentation check receipt are retained in the task card.
Impact: local documentation snapshot only; no push or implementation.
Refs: .task/feature-rdm-template-dialog-plan.md
Why: retain the requested template audit and proposed delivery design in the project entrypoints.
Evidence: SELF precheck, source inventory and documentation checks are preserved in the task card; business and combination tests NOT_RUN.
Impact: local documentation candidate only; no push, merge, migration or deployment.
Refs: .task/feature-rdm-template-dialog-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: the plan was approved and merged in Documents (PR #63); the Dev pin and planning entry must follow the approved master record.
Evidence: modules/documents gitlink d3e40c783d1a092b67d025303f28384a564548f4 (Documents PR #63 merge, SELF API query); task card backfilled with the user rulings and merge record.
Impact: documents gitlink, PROJECT.md planning entry, and task-card metadata only; no code change.
Refs: Documents PR #63; .task/feature-rdm-two-trees-audit-plan.md
Why: The U1 controlled trial finished; its fixtures, validator, runner,
per-run results, report, and renderer spike must be reviewable from the
task branch, and the task card needs the final PASS/FAIL record.
Evidence: results/summary.json + report.md (SELF, MiniMax official
channel, CNY 3 of 200 cap); make evidence receipts for precheck,
task-sync, and make test follow in this branch.
Impact: Task-scoped experiment artifacts only (.task/genui-u1/); no
production code changes.
Refs: Documents PR #62 (proposal r2); task card feature/generative-ui-u1
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=2afcfd5d6db29e76ae89b34798b8f34f030a3a69.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
# Conflicts:
# PROJECT.md
Why: The user ruled the three open choices on 2026-10-11 (first pilot =
in-conversation analysis page; trusted compiled-plugin delivery for
enable/disable; U1 trial limited to MiniMax M3 + M2.7-highspeed,
sanitized materials, CNY 200 cap), converting the research draft into a
publishable direction record.
Evidence: Precheck and evidence receipts live in the task card;
Documents PR #60 (merged at 3304efe) carries the proposal and index
entry that this gitlink pins.
Impact: Dev-side PROJECT.md entry, documents gitlink, and the task card
only; no code or contract changes.
Refs: modules/documents/docs/proposals/2026-10-10-generative-ui-plugin.md