Commit Graph
3225 Commits
Author SHA1 Message Date
weichen fee1cc2a8f Record approved U3 design and r0.5 implementation plan
ci / svc-realcombo (pull_request) Successful in 2m1s
ci / test (pull_request) Successful in 5m18s
ci / test-pg (pull_request) Successful in 8m51s
Why: The user approved the r0.5 written design for detailed planning; the resulting plan must be traceable from the Dev task and project entry.

Evidence: Documents 25a561b passed link and diff checks; staged Dev make test completed exit 0 through make evidence in the task card.

Impact: Pin plan and approval status only. Product code, new paid model calls, merge, and deployment remain not run.

Refs: U3 r0.5 plan; Documents PR #95; Dev PR #512
2026-10-14 07:25:13 +00:00
weichen c7ff687c1d Record U3 r0.5 review sync and replay
ci / svc-realcombo (pull_request) Successful in 1m49s
ci / test (pull_request) Successful in 5m1s
ci / test-pg (pull_request) Successful in 8m29s
Why: The authoritative main advanced with facts and task-governance changes before the written design review.

Evidence: make task-sync SELF receipt /tmp/fast-slow-u3-r05-design-review-sync.json; the post-sync make test completed exit 0 and its full evidence output is in the task card.

Impact: Preserve the unchanged Documents 0d473fe design pin while recording the new Dev base and the need for exact-head CI. No product code or paid model call changed.

Refs: U3 r0.5 design; Dev PR #512; Documents PR #95
2026-10-14 06:51:03 +00:00
weichen 749e834e89 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e; before_record=baf722610c95d37d2b3b7fe901f942772795ab31.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 06:45:48 +00:00
weichen baf722610c Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 06:45:22 +00:00
weichen d40579ed7f Merge pull request 'Fix facts registry commands and make precheck parsing escape-aware' (#539) from fix/facts-registry-commands into main
ci / svc-realcombo (push) Successful in 1m55s
ci / test (push) Successful in 5m9s
ci / test-pg (push) Successful in 7m32s
2026-10-14 06:40:53 +00:00
weichen 23895cd608 Record U3 r0.5 design for review
ci / svc-realcombo (pull_request) Successful in 1m48s
ci / test (pull_request) Successful in 5m43s
ci / test-pg (pull_request) Successful in 7m45s
Why: The single r0.4 A01 failed both staged-result and fast-feedback quality; the user approved writing a conservative next design.

Evidence: Documents 0d473fe link check and diff check; Dev staged-gitlink make test exit 0 through make evidence in the task card. The prior paid sample and independent assessment remain unchanged.

Impact: Add only design, navigation, and task traceability. Product behavior, paid model allowance, merge, and deployment remain unapproved.

Refs: U3 r0.5 design; Dev PR #512; Documents PR #95
2026-10-14 06:36:33 +00:00
weichen 8a86d5a916 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=427e9faf47641a427c5f2173244f65b8867c4500; before_record=736c6650a555b10b52fd027fdcbf5137c65dbc7d.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 06:24:28 +00:00
weichen 736c6650a5 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=427e9faf47641a427c5f2173244f65b8867c4500.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 06:24:05 +00:00
weichen 3b0e100fba Fix facts registry commands and make precheck parsing escape-aware
ci / svc-realcombo (pull_request) Successful in 1m59s
ci / test (pull_request) Successful in 5m13s
ci / test-pg (pull_request) Successful in 8m6s
Why: F2 token extraction predates the two-section (HOME/IMC) layout of
~/.secrets/gitea so it concatenated both tokens and always failed; F6
registered a grep BRE alternation that facts-verify unescapes into a
literal pipe, failing re-verification and misaligning precheck's naive
pipe split into a spurious F6 date-format expiry warning, while both
underlying facts still hold.

Evidence: make facts-verify now 6/6 PASS with last_verified refreshed
to 2026-10-14; new regression test for escaped pipes in facts rows;
full governance suite 342 tests OK (18 skipped); precheck [facts] line
reports all facts fresh on the fixed parser.

Impact: policy/facts.md F2 (HOME-section awk extraction) and F6
(negated pipe-free grep); scripts/task.sh precheck neutralizes escaped
pipes the same way facts-verify does; tests/test_task.py covers it.

Refs: precheck WARN 过期事实 F6(日期格式); AGENTS.md 证据与验证门禁.
2026-10-14 06:13:51 +00:00
weichen 427e9faf47 Merge pull request 'Close merged task cards (feature/card-close-20261012-123313Z)' (#471) from feature/card-close-20261012-123313Z into main
ci / svc-realcombo (push) Successful in 1m48s
ci / test (push) Successful in 5m13s
ci / test-pg (push) Successful in 8m39s
2026-10-14 06:13:17 +00:00
weichen b22c61584f Record failed U3 A01 and pin usage accounting fix
ci / svc-realcombo (pull_request) Successful in 1m58s
ci / test (pull_request) Successful in 5m14s
ci / test-pg (pull_request) Successful in 7m56s
Why: The authorized real-model sample failed without checkpoints or a final result, and failed-child Usage was underreported in the original candidate.

Evidence: Independent A01 assessment 2ac373ed; Backend accounting review d53cc969; SELF combination receipt /tmp/fast-slow-u3-r04-20261014/usage-fix-final-dev-combo.json and Backend GATE run 3079.

Impact: Keep eight draft PRs and the original sample intact; pin Backend 0637547 and Documents c53662a while marking stage 7, merge, and deployment not run.

Refs: U3 r0.4 implementation plan; task feature-fast-slow-u2-u3-plan
2026-10-14 06:00:26 +00:00
weichen 7c183b8821 Merge remote-tracking branch 'origin/main' into feature/card-close-20261012-123313Z
ci / svc-realcombo (pull_request) Successful in 1m56s
ci / test (pull_request) Successful in 5m15s
ci / test-pg (pull_request) Successful in 7m56s
2026-10-14 06:00:11 +00:00
weichen d38dbdc396 Pin approved U3 A01 evaluation selector
ci / svc-realcombo (pull_request) Successful in 1m47s
ci / test (pull_request) Successful in 5m8s
ci / test-pg (pull_request) Successful in 8m37s
Why: Record the separate one-time A01 resource authorization and fix the exact Backend revision with its own guarded label and output name.

Evidence: The selector tests failed before the change and passed afterward. Full Backend vet/Go and selected zero-paid live-tag suites, Dev strict pins and build passed; full new-head CI and preflight are required before any paid call.

Impact: Evaluation-only Backend gitlink and task evidence. No provider request, merge or deployment.

Refs: U3 r0.4 stage-6 conclusion and one-time A01 resource proposal; Backend PR #193
2026-10-14 05:27:48 +00:00
weichen ffb0ff5c79 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 4m6s
ci / test-pg (pull_request) Successful in 9m5s
ci / test (pull_request) Successful in 9m37s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=4f84c2e1630cd0311643529fae1c3a99f1dd5d64; before_record=4412df508ea707f1cd1cf0b39066c362206aa8ab.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 05:09:19 +00:00
weichen 4412df508e Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=4f84c2e1630cd0311643529fae1c3a99f1dd5d64.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 05:08:54 +00:00
weichen 4f84c2e163 Merge pull request 'Close three trial task cards and fix long-history detection' (#538) from feature/card-close-merge-queue-trial-20261014 into main
ci / svc-realcombo (push) Successful in 3m5s
ci / test (push) Successful in 7m53s
ci / test-pg (push) Successful in 9m31s
2026-10-14 05:08:39 +00:00
weichen f64a9da9af Record approved U3 stage and synchronized mainline
ci / svc-realcombo (pull_request) Successful in 3m43s
ci / test (pull_request) Successful in 6m22s
ci / test-pg (pull_request) Successful in 9m25s
Why: Preserve the user-approved stage-6 conclusion at the reviewed Dev SHA and distinguish it from the newly synchronized U7-containing candidate.

Evidence: Readiness precheck and task-resume passed after Backend/Dev main merges; Backend vet/full Go/live-tag checks and Dev strict pins passed. Failed precheck/sync receipts remain attached. New exact-head combination/CI are still required.

Impact: Task record only; no paid model authorization, merge or deployment.

Refs: U3 r0.4 stage-6 review; Dev PR #512
2026-10-14 05:07:22 +00:00
weichen 34796df9c8 Merge current Dev main into U3 candidate
Why: Preserve the accepted U7 account transaction integration and pin the Backend merge that retains U3 checkpoint behavior.

Evidence: Backend merged main without text conflicts; full Go vet/test and zero-paid live-tag evaluation checks passed. Dev combination and current-head CI will be revalidated.

Impact: Mainline U7 docs/task records and Backend gitlink; no U3 public-contract or model-budget change.

Refs: U3 r0.4 resource-preparation sync; Dev main 05b997b
2026-10-14 05:05:10 +00:00
weichen 2221a099b7 Backfill the three archived trial card outcomes
ci / svc-realcombo (pull_request) Successful in 2m12s
ci / test (pull_request) Successful in 5m19s
ci / test-pg (pull_request) Successful in 7m44s
Why: The archive move staged the path changes while leaving the status and merge receipts as unstaged content; each archived card must carry its actual completed result.

Evidence: The recorded merge commits f00165e8, d852c159, and 05b997b8 are present in origin/main and match Dev PR #489/#488/#486.

Impact: Mark exactly three authorized cards complete and record their merge subjects without changing other task cards.

Refs: Dev merge queue #518; Dev #489, #488, #486
2026-10-14 04:50:27 +00:00
weichen deff43ae59 Close trial task cards and keep long histories visible
Why: pipefail treated a recent merged-card match as a failed git log after grep exited early, hiding completed cards from precheck and task-close.

Evidence: A disposable long-history regression failed before the fix and passed after it; make test-governance passed 341 cases. Git history confirms PR #489/#488/#486 merge SHAs.

Impact: Detect merged cards reliably and archive only the three authorized trial cards; four unrelated eligible cards remain untouched.

Refs: Dev merge queue #518; Dev #489, #488, #486
2026-10-14 04:50:06 +00:00
weichen 05b997b84d Merge pull request 'Deliver U7 account transactions on the current combination' (#486) from feature/u7-account-tx-audit into main
ci / svc-realcombo (push) Successful in 2m13s
ci / test (push) Successful in 5m3s
ci / test-pg (push) Successful in 7m52s
2026-10-14 04:36:00 +00:00
weichen d805cc1697 Record U7 integration evidence and correct the specification
ci / svc-realcombo (pull_request) Successful in 1m54s
ci / test (pull_request) Successful in 5m1s
ci / test-pg (pull_request) Successful in 7m19s
Why: The account task needs the actual synchronized combination and raw local checks before freezing its final Dev candidate; two spec lines overstated identity and test behavior.

Evidence: SELF make test, isolated PostgreSQL and Redis backend tests, make build, and task-sync receipts are imported; Backend #185 has independent REPLAY and exact-head GATE.

Impact: Keep current component pins, clarify read-only identity verification and test coverage, and prepare the Dev PR for final exact-head admission.

Refs: Dev #486; Backend #185; merge queue #518
2026-10-14 04:23:31 +00:00
weichen d2783e4061 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=d852c159b6b3387a2f418a42ab6d3696ac873d01; before_record=665955279bac407e2f55bbba9f7299e48fd70031.

Impact: task metadata only.

Refs: .task/feature-u7-account-tx-audit.md
2026-10-14 04:17:13 +00:00
weichen 665955279b Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=d852c159b6b3387a2f418a42ab6d3696ac873d01.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 04:16:47 +00:00
weichen 1f347c5ec4 Pin the merged account transaction backend
Why: The Dev U7 task must consume the actual reviewed Backend merge and record the current agent-only delivery authorization.

Evidence: Backend #185 merged as 8e80e261 after independent REPLAY and exact-head GATE run 3062; task card preserves the original SELF resume receipt.

Impact: Advance the Backend gitlink to the merged component; parent combination and CI remain pending final synchronization.

Refs: Dev #486; Backend #185; Dev queue #518
2026-10-14 04:15:55 +00:00
weichen aedcc7c61e Pin closed tool terminal variants in U3 candidate
ci / svc-realcombo (pull_request) Successful in 1m58s
ci / test (pull_request) Successful in 5m16s
ci / test-pg (pull_request) Successful in 7m58s
Why: Both supported tool finish reasons must fail closed when no call was collected; the Dev composition pins that exact Agent-Native revision through Agent-Squad and Backend.

Evidence: The function_call regression failed before the fix and passed afterward. Agent-Native, Agent-Squad and Backend full vet/test suites, strict Dev pins, and task-owned PostgreSQL/browser checks passed at their recorded versions. Current Dev HEAD CI and final independent replay remain pending.

Impact: Component gitlinks and task evidence only; no paid model call or deployment.

Refs: U3 r0.4 review Important 2; Agent-Native PR #46; Agent-Squad PR #53; Backend PR #193
2026-10-14 04:13:34 +00:00
weichen 4c5cd40ce8 Pin synchronized browser validation and evidence
ci / svc-realcombo (pull_request) Successful in 1m43s
ci / test (pull_request) Successful in 5m17s
ci / test-pg (pull_request) Successful in 10m4s
Why: Preserve the latest Frontend mainline export controls and the corrected batched-notice browser assertion in the U3 candidate.

Evidence: Frontend 269 unit tests/build and six task-owned HTTP/Playwright scenarios passed after merge; required Dev sync returned changed=0 at d852c15. Earlier failed sync and browser receipts are retained.

Impact: Frontend gitlink and task evidence only; current-head full Dev CI, PostgreSQL replay and review closure remain pending.

Refs: U3 r0.4 Task 6; Frontend PR #79
2026-10-14 04:07:04 +00:00
weichen 0e6369b8c3 Merge current Dev main into U3 candidate
Why: Incorporate the accepted RDM audit export and its Frontend component while retaining U3 browser coverage.

Evidence: Frontend main merged without textual conflicts, 269 unit tests and build passed. Dev composition, task-owned browser, and current-head CI will be revalidated.

Impact: Frontend gitlink and unrelated mainline RDM export files; no U3 contract change.

Refs: U3 r0.4 Task 6 final review synchronization
2026-10-14 04:04:29 +00:00
weichen 431b679746 Pin reviewed U3 r0.4 fixes and validation
Why: Close the independent review blockers and keep Dev, Backend, Agent-Squad and Agent-Native on one exact stream/runtime combination.

Evidence: Review issues reproduced RED then passed; component suites and six HTTP/Playwright cases passed. The staged Dev composition passed make test && make build with 340 governance tests and strict pins; full original receipts are in the task card. Current committed-head CI and review closure remain pending.

Impact: Component gitlinks and task evidence only; no paid A01 or deployment.

Refs: U3 r0.4 Task 6; Agent-Native PR #46; Agent-Squad PR #53; Backend PR #193; Frontend PR #79
2026-10-14 04:03:38 +00:00
weichen d852c159b6 Merge pull request 'Deliver RDM audit export in the controlled integration window' (#488) from feature/rdm-audit-export-entry into main
ci / svc-realcombo (push) Successful in 1m59s
ci / test (push) Successful in 5m16s
ci / test-pg (push) Successful in 7m35s
2026-10-14 03:46:36 +00:00
weichen d260cbc58a Merge current Dev main into U3 r0.4 candidate
ci / svc-realcombo (pull_request) Successful in 2m14s
ci / test (pull_request) Successful in 6m36s
ci / test-pg (pull_request) Successful in 8m10s
Why: Incorporate the accepted proposal-status and merge-queue policy updates before U3 review.

Evidence: The Documents branch merged origin/main without overlapping content; Dev has no remaining unmerged paths. Strict pins and full combination will be revalidated at this head.

Impact: Documents gitlink and unrelated mainline task/policy files; U3 runtime components unchanged.

Refs: U3 r0.4 Task 6 review synchronization
2026-10-14 03:40:40 +00:00
weichen 6294f06a55 Pin U3 r0.4 components for zero-cost review
Why: Fix the exact Agent-Native consumer chain and publish the r0.4 Backend and browser test candidate as a reviewable Dev combination.

Evidence: Strict pin preflight, component tests, isolated PostgreSQL, six HTTP/Playwright cases, and make build passed. The full local make test was interrupted by an unrelated concurrent fixed-port collision; this failure and prior pin failures remain in the task card. Exact-HEAD CI and independent review remain pending.

Impact: Dev gitlinks and task evidence only; no paid model call or deployment.

Refs: U3 r0.4 implementation plan; Agent-Native PR #46; Agent-Squad PR #53; Backend PR #193; Frontend PR #79
2026-10-14 03:39:46 +00:00
weichen a70de2c54a Validate export delivery in the controlled integration window
ci / svc-realcombo (pull_request) Successful in 1m54s
ci / test (pull_request) Successful in 5m12s
ci / test-pg (pull_request) Successful in 8m42s
Why: Finish Dev #488 with delivered Frontend and RDM objects, explicit audit grants in private browser fixtures, and owned process cleanup.

Evidence: Tool-imported SELF precheck, final sync, make test, and real-browser runs retain failures and passes; latest isolated runtime completed seven browser cases. Final exact-head GATE and independent parent Review follow.

Impact: Preserves other main components and existing CI jobs while the one final candidate is fixed for formal checks.

Refs: Dev PR #488; Frontend PR #73; RDM PR #301; queue Issue #518
2026-10-14 03:35:17 +00:00
weichen 925c6a989d Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=f00165e8d71e4dc8ba0ceb7dc50c1a8a3deb6d60; before_record=3e39e8fcdbb885dfe6537b578c20bbcac647b5a3.

Impact: task metadata only.

Refs: .task/feature-rdm-audit-export-entry.md
2026-10-14 03:22:16 +00:00
weichen 3e39e8fcdb Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=f00165e8d71e4dc8ba0ceb7dc50c1a8a3deb6d60.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 03:21:51 +00:00
weichen 000eb75245 Pin delivered frontend export and record current dependency
Why: Prepare genuine Dev #488 for its final window using actually merged component versions and the authorized agent merge scope.

Evidence: Frontend PR 73 tree-identical merge and independent review; RDM PR 301 GATE3044, independent replay, Root merge ef510. Full Dev combination and exact-head CI remain pending.

Impact: Advances the frontend pin and task record only; current target main sync follows in the scheduled final window.

Refs: Dev PR #488; Frontend PR #73; RDM PR #301; Issue #518
2026-10-14 03:19:40 +00:00
weichen f00165e8d7 Merge pull request 'Pin proposal status and start the controlled merge queue trial' (#489) from feature/proposal-status-20261012 into main
ci / svc-realcombo (push) Successful in 1m56s
ci / test (push) Successful in 5m14s
ci / test-pg (push) Successful in 7m47s
2026-10-14 02:30:51 +00:00
weichen 5e6bf4aa05 Pin proposal status and start the controlled merge queue trial
ci / svc-realcombo (pull_request) Successful in 1m46s
ci / test (pull_request) Successful in 5m10s
ci / test-pg (pull_request) Successful in 7m22s
Why: retain the approved status changes and current documentation while adopting the already approved manual delivery window after real platform validation.
Evidence: original startup, conflict resolution, combination test and writer inventory receipts are preserved in the task card; independent Doc89 and platform replay reports are referenced. Final candidate CI and review remain required.
Impact: publish the delivered Documents merge, manual trial policy and truthful capability state; keep all workflow triggers/checks and original task baseline unchanged.
Refs: Dev PR #489; Documents PR #89; Issue #518; approved merge queue implementation plan r1; user continuation authorization on 2026-10-14
2026-10-14 02:10:35 +00:00
weichen a74318ab4b Record U3 r0.4 implementation plan for review
ci / svc-realcombo (pull_request) Successful in 1m48s
ci / test (pull_request) Successful in 4m56s
ci / test-pg (pull_request) Successful in 7m20s
Why: preserve the approved design decision and a staged, verifiable plan before code work.

Evidence: six tasks and thirty steps self-reviewed; local links pass; make test passed with Documents 276f885 staged, receipt imported as SELF.

Impact: documentation, task card and Documents gitlink only; no model calls or production behavior changes.

Refs: modules/documents/docs/proposals/2026-10-14-fast-slow-u3-r04-reliable-first-checkpoint-implementation-plan.md; .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 01:56:46 +00:00
weichen 0ed41bb14e Record U3 r0.4 design for review
ci / svc-realcombo (pull_request) Successful in 1m43s
ci / test (pull_request) Successful in 4m59s
ci / test-pg (pull_request) Successful in 7m42s
Why: preserve the failed A01 outcome and an actionable design for reliable staged material work.

Evidence: Documents links and diff checks pass; Dev make test passed with the staged Documents gitlink; original A01 and offline diagnostic receipts remain SELF.

Impact: documentation, task-card evidence and Documents pin only; no product behavior or model budget change.

Refs: modules/documents/docs/proposals/2026-10-14-fast-slow-u3-r04-reliable-first-checkpoint-design.md; .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 01:41:00 +00:00
weichen 37ab85c401 Align task card with resume metadata
Why: allow the registered task worktree to pass the current resume validator.

Evidence: precheck READY at 3de8793; registered path, branch, and R0 were verified against Git.

Impact: task-card metadata only; no product code or component pointer changes.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 01:29:01 +00:00
weichen 3de8793964 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=add097d06137c4912a4ed9279e98ca353e4e4cf1; before_record=b0b868911e585735642a7868e0725f18693b9866.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 01:27:39 +00:00
weichen b0b868911e Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=add097d06137c4912a4ed9279e98ca353e4e4cf1.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 01:27:03 +00:00
weichen 839b2a3af0 Synchronize proposal status delivery with the current integration baseline
Why: restore the assigned task against the current target while retaining its original baseline and all newer component capabilities.
Evidence: startup precheck and real parent/component sync receipts capture the original conflict; Documents PR89 was independently reviewed, merged by the agent, and its tree verified.
Impact: include origin/main and the delivered documentation merge 7bd4e17827d4c7c88647bf3c9199c495b60cb107 without rewriting task history or pushing waiting branches.
Refs: Dev PR #489; Documents PR #89; merge queue Issue #518; user takeover authorization on 2026-10-14
2026-10-14 01:18:47 +00:00
weichen add097d061 Merge pull request 'Require agent-only merges and archive the delivered merge queue increment' (#536) from feature/card-close-merge-queue-20261014 into main
ci / svc-realcombo (push) Successful in 1m42s
ci / test (push) Successful in 4m51s
ci / test-pg (push) Successful in 7m34s
2026-10-13 18:22:26 +00:00
weichen e31443a8ff Present the U3 r0.3 zero-paid review candidate
ci / svc-realcombo (pull_request) Successful in 1m44s
ci / test (pull_request) Successful in 5m4s
ci / test-pg (pull_request) Successful in 7m10s
Why: The approved implementation and mechanism validation are complete, while the real-model quality gate remains unrun.

Evidence: Dev ef6f650 make test/build exit 0 with imported SELF receipt; Backend 5f53f80 independent code replay and v10 PostgreSQL/HTTP receipts are linked in the card.

Impact: Update task/project status for human stage-6 review; no provider request, merge or deployment.

Refs: Dev PR #512; Documents PR #95
2026-10-13 18:08:21 +00:00
weichen ef6f650892 Preserve final U3 r0.3 sync receipt
Why: The one-shot trial candidate must be tied to the current authoritative main before its exact combination and CI gates.

Evidence: make task-sync exit 0, sync_base 57bcb17, changed 0; complete SELF receipt imported by make evidence.

Impact: Task record only; no paid trial authorization or provider call.

Refs: Dev PR #512; r0.3 plan Task 5
2026-10-13 18:02:25 +00:00
weichen 3cc7ec2c28 Pin distinct U3 r0.3 evaluation preparation
Why: The separately gated A01 trial needs a unique label and raw result file while preserving the consumed r0.2 sample.

Evidence: Backend 5f83454 label/output tests and prior Dev 6f91ca9 combination receipt are recorded with their exact SHAs; new exact-head validation follows.

Impact: Zero-paid evaluator code and report pin only; no provider request, merge or deployment.

Refs: Dev PR #512; Backend #193; Documents #95
2026-10-13 18:00:59 +00:00
weichen 6f91ca911a Preserve U3 r0.3 acceptance sync evidence
Why: The latest authoritative main must be included before fixing the final validation object.

Evidence: make task-sync exit 0 at sync_base 57bcb17, complete SELF receipt imported by make evidence; component gitlinks did not change.

Impact: Task record only; exact-head Dev combination and platform checks remain pending.

Refs: Dev PR #512; r0.3 plan Task 4
2026-10-13 17:52:48 +00:00
weichen be3c8d68db Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=57bcb17ea212a531186b6e21617a7f3bea65a791; before_record=dc93443e55bc0af91c15129273822563bace2d34.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-13 17:52:11 +00:00