Let agents review and merge PRs after resolving conflicts and passing CI #476

Merged
weichen merged 19 commits from feature/agent-pr-merge into main 2026-10-12 13:39:05 +00:00
Owner

Why: PR 合入由智能体在完成 Review、解决冲突且当前 HEAD 的全部必需 CI 通过后执行,无需再由人操作。当前任务边界和平台批准要求继续适用,闭合 PR 采用同一流程。

Evidence: 独立 review 收据 status=complete、无主发现;原始独立重放与最终规范 hash 关系已由工具保存于任务卡。SELF 治理回归 212 用例(211通过,1个既有真实PG专项未配置而跳过)与12个链接/锚点核验见任务卡;最终 PR HEAD 的 CI 待平台执行。来源仍分别为 REPLAY/SELF/GATE,不以本地记录提升可信等级。

Impact: 本次只调整项目交付规范、智能体入口、任务模板与闭合提示;平台能力登记为 manual。实际合入前核验运行/job/SHA及最新base/head,不变更分支保护。

Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/src/commit/a19c5b4c0e63568e12ebf79327d6e12f3c42fb48/.task/feature-agent-pr-merge.md

审阅覆盖限制

交叉审阅引用了范围外的历史任务卡,相关材料和推理已排除;原始收据保留于任务卡。平台负例、runner隔离与凭据权限不由这次只读审阅证明。既有模板测试未逐项断言新增三个记录字段,是非阻断覆盖建议;本次未实现新的合入守护器。

Post-Deploy Monitoring & Validation

No additional operational monitoring required:本次修改开发交付规范与提示,无产品运行改动;合入后核对实际规范内容和任务卡归档。


Compound Engineering

Why: PR 合入由智能体在完成 Review、解决冲突且当前 HEAD 的全部必需 CI 通过后执行,无需再由人操作。当前任务边界和平台批准要求继续适用,闭合 PR 采用同一流程。 Evidence: 独立 review 收据 status=complete、无主发现;原始独立重放与最终规范 hash 关系已由工具保存于任务卡。SELF 治理回归 212 用例(211通过,1个既有真实PG专项未配置而跳过)与12个链接/锚点核验见任务卡;最终 PR HEAD 的 CI 待平台执行。来源仍分别为 REPLAY/SELF/GATE,不以本地记录提升可信等级。 Impact: 本次只调整项目交付规范、智能体入口、任务模板与闭合提示;平台能力登记为 manual。实际合入前核验运行/job/SHA及最新base/head,不变更分支保护。 Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/src/commit/a19c5b4c0e63568e12ebf79327d6e12f3c42fb48/.task/feature-agent-pr-merge.md ## 审阅覆盖限制 交叉审阅引用了范围外的历史任务卡,相关材料和推理已排除;原始收据保留于任务卡。平台负例、runner隔离与凭据权限不由这次只读审阅证明。既有模板测试未逐项断言新增三个记录字段,是非阻断覆盖建议;本次未实现新的合入守护器。 ## Post-Deploy Monitoring & Validation No additional operational monitoring required:本次修改开发交付规范与提示,无产品运行改动;合入后核对实际规范内容和任务卡归档。 --- [![Compound Engineering](https://img.shields.io/badge/Built_with-Compound_Engineering-6366f1)](https://github.com/EveryInc/compound-engineering-plugin)
weichen added 12 commits 2026-10-12 13:25:08 +00:00
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-agent-pr-merge.md; R0=d8a269ab2fd20e4783ba0cde6a4794a702ad7571.

Impact: task metadata only; the feature workspace starts at d8a269ab2f.

Refs: .task/feature-agent-pr-merge.md
Why: make the agent responsible for merging reviewed PRs without another human merge step.

Evidence: SELF governance and generated-card checks are captured in .task/feature-agent-pr-merge.md; CI remains required on the final PR HEAD.

Impact: update project delivery policy, agent entry points, task metadata and closure guidance; preserve platform protection and scoped authorization.

Refs: .task/feature-agent-pr-merge.md; user instruction on 2026-10-12
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=d8a269ab2fd20e4783ba0cde6a4794a702ad7571; candidate=ab622e5bc8a5f192db7658b1df1fe7b13144ad5e.

Impact: task metadata only.

Refs: .task/feature-agent-pr-merge.md
Why: preserve the tested policy object and separate local checks from pending review and CI.

Evidence: SELF command receipts in the task card; 212 governance cases with one existing PG-only skip and 12 verified links.

Impact: task metadata only; policy and component content are unchanged.

Refs: .task/feature-agent-pr-merge.md
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=d8a269ab2fd20e4783ba0cde6a4794a702ad7571; candidate=da33045cfd425ae07cd566935da5fdcde97b36c8.

Impact: task metadata only.

Refs: .task/feature-agent-pr-merge.md
Why: avoid general manual-stage wording overriding stages eight and nine.

Evidence: SELF document and link checks captured in the task card; existing governance checks cover unchanged script and test content.

Impact: clarify two policy sentences and record review-node synchronization; no mechanism or component change.

Refs: .task/feature-agent-pr-merge.md; policy/delivery.md
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=6a44736f03f08428e68861f923b18ca645043efe.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=8ebf5021468a1301ccbe2fe0568508e16d8bb708; candidate=aa55de6f470eb5d5bd952d703dd6a087bbad7246.

Impact: task metadata only.

Refs: .task/feature-agent-pr-merge.md
Why: retain the synchronization against the advancing authoritative target.

Evidence: SELF task-sync receipt in .task/feature-agent-pr-merge.md; CI on the final synchronized candidate remains pending.

Impact: task metadata only.

Refs: .task/feature-agent-pr-merge.md
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=8ebf5021468a1301ccbe2fe0568508e16d8bb708.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=8ebf5021468a1301ccbe2fe0568508e16d8bb708; candidate=9cf566cb59fda207dd296718843a7daae59224e9.

Impact: task metadata only.

Refs: .task/feature-agent-pr-merge.md
Preserve independent review and scoped cleanup authorization
ci / test-pg (pull_request) Successful in 1m48s
ci / test (pull_request) Successful in 3m27s
a19c5b4c0e
Why: bind delivery to the completed review and the user authorized cleanup endpoint.

Evidence: independent review run 20261012-123744-f14f6caa and raw records are captured in the task card; final PR CI is still required.

Impact: task metadata only; all eight reviewed policy and generator files remain unchanged.

Refs: .task/feature-agent-pr-merge.md
weichen added 1 commit 2026-10-12 13:25:34 +00:00
Link the delivery record to PR 476
ci / test-pg (pull_request) Successful in 1m42s
ci / test (pull_request) Successful in 3m22s
e867ff9b25
Why: preserve the actual main PR and independently reviewed object before final CI.

Evidence: completed review and authoritative synchronization receipts in the task card; CI must bind the new HEAD.

Impact: task metadata only; no normative or component change.

Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/476
weichen added 3 commits 2026-10-12 13:29:05 +00:00
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=6a494d3977e6557e7bebe0e5bb1c4a12091296e0.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=6a494d3977e6557e7bebe0e5bb1c4a12091296e0; candidate=afcadae78c6ea386d59559e21a15ee353f3a99b1.

Impact: task metadata only.

Refs: .task/feature-agent-pr-merge.md
Record synchronization and replay on the latest integration base
ci / test-pg (pull_request) Successful in 1m43s
ci / test (pull_request) Successful in 3m22s
c5b63a5e9a
Why: include the newly merged service identity baseline before final CI.

Evidence: SELF task-sync, ancestor check, generator replay and document-link receipts in the task card.

Impact: task metadata only; all reviewed policy and generator content is unchanged.

Refs: .task/feature-agent-pr-merge.md; PR #476
weichen added 3 commits 2026-10-12 13:34:54 +00:00
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=9b5be3926eaa394a9e520fd72ffdf6d0a48d1aef.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=9b5be3926eaa394a9e520fd72ffdf6d0a48d1aef; candidate=794bf8ec1bafdec0c0cd8904ebb219b090627217.

Impact: task metadata only.

Refs: .task/feature-agent-pr-merge.md
Record the final baseline before merge validation
ci / test-pg (pull_request) Successful in 1m42s
ci / test (pull_request) Successful in 3m32s
cdbdc87b0a
Why: include the newly integrated backend identity CLI before testing the combination.

Evidence: SELF task-sync and ancestor verification receipts in the task card; final HEAD CI is required.

Impact: task metadata only; reviewed normative files are unchanged.

Refs: .task/feature-agent-pr-merge.md; PR #476
weichen merged commit 6ba91239e6 into main 2026-10-12 13:39:05 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Dev#476