Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-agent-stack-audit-remediation-b1.md -> .task/archive/feature-agent-stack-audit-remediation-b1.md; status 已完成(合入前闭合); PR #685https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/685.
Impact: task metadata only; the card is archived within PR #685 and lands with its merge commit.
Refs: task.sh close --self
Why: the independent review approved batch 1 (APPROVE, 0 blockers);
the first CI run failed at checkout because the five pinned component
commits were local-only and are now pushed.
Evidence: review4-run.json (pi-glm success); component remote refs
created; this commit retriggers CI.
Impact: task metadata only.
Refs: PR #685
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=b25846d2.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: backend main advanced to 528e3a4 (surface conversation required,
card backfills); the backend task branch merges it into the batch-1
line and the Dev pin follows.
Evidence: integration transport success (gitlink5-run.json); backend
build green on the merge; full make test re-run follows.
Impact: one component gitlink.
Refs: feature/agent-stack-audit-remediation-b1
Why: close out the batch-1 audit trail before review and PR.
Evidence: make test exit=0 on the fully repinned combination
(verify-combo-make-test4.json).
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
Why: the U3B sqlite repair advanced the squad container to 0f1daa8 and
backend's nested-squad pin follow-up moved backend to 1f61131.
Evidence: integration transport success (gitlink4-run.json); full
make test re-run follows on this branch.
Impact: two component gitlinks.
Refs: feature/agent-stack-audit-remediation-b1
Why: check-pins requires each container's nested gitlinks to equal the
Dev top-level pins; the batch-1 bumps left native/squad/backend
containers pinned at pre-batch sibling versions.
Evidence: integration transport success (gitlink3-run.json); full
make test re-run follows on this branch.
Impact: three component gitlinks.
Refs: feature/agent-stack-audit-remediation-b1
Why: the backend branch advanced to 49c1259 with the U6 boundary
repair (admission test reworked behind intentgate helpers).
Evidence: repair receipt success; verify-u6r2 exit=0; combination
make test re-run follows on this branch.
Impact: one component gitlink.
Refs: feature/agent-stack-audit-remediation-b1
Why: land U1-U7 and U10 across agent-native (5c0d2d8), agent-squad
(23f161b), agent-intent (765a7e7), agent-command (fe7987d) and
modules/backend (4030449) per the approved remediation plan.
Evidence: per-unit SELF receipts under /tmp/agent-stack-b1 all exit=0;
combination verification (make test) recorded next on this branch.
Impact: five component gitlinks; no other Dev paths.
Refs: docs/superpowers/plans/2026-10-21-agent-stack-audit-remediation-plan.md
Why: all ten batch-1 units implemented and individually verified.
Evidence: verify-u3b exit=0 (race).
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
Why: keep the per-unit audit trail current.
Evidence: verify-u6 exit=0; U3B first run failed-unknown on a
pre-session cursor TLS failure (553B log, zero changes, workspace
preserved), reconciled as environmental and re-dispatched.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
Why: keep the per-unit audit trail; U10 first run failed-unknown
(pi attempt exited 0 without a decodable terminal record), workspace
preserved for reconciliation and the unit re-dispatched with a corrected
packet (nested deps gitlinks materialized).
Evidence: verify-u2/u4/u4b exit=0; no code change.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
Why: carry authorization, scope, wave plan and receipt tables for the
agent-per-unit implementation of U1-U7 and U10.
Evidence: card + receipts under /tmp; no code change.
Impact: task metadata only (exempt path).
Refs: docs/superpowers/plans/2026-10-21-agent-stack-audit-remediation-plan.md
Why: record the audited findings and the batched remediation contract
(U1-U11) that subsequent implementation units must satisfy.
Evidence: document-only change; no code paths touched.
Impact: docs only; plan is the scope authority for the remediation task.
Refs: feature/agent-stack-audit-remediation-b1
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-agent-stack-audit-remediation-b1.md; R0=d9e9c0560a2767539f4415b579adbeff86a22ba6.
Impact: task metadata only; the feature workspace starts at d9e9c0560a.
Refs: .task/feature-agent-stack-audit-remediation-b1.md