Why: Preserve the merged DHF progress note and task-card archive before writing the U3 resource proposal.
Evidence: Documents branch merged current main without conflict; Core and UI feature pins contain main pins; staged diff checked.
Impact: Updates only Documents gitlink and unrelated task archival.
Refs: U3 r0.5 stage-6 decision and resource preparation
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-plan-progress-note.md(PR#547) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: Stage-6 review must identify the current main base and final tool-written sync receipt.
Evidence: make task-sync at main 3538d40, recursive pins, and independent closure replay.
Impact: Task record only; all eight component pins remain unchanged.
Refs: U3 r0.5 implementation plan Task 5
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.
Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.
Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.
Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
Why: The task record must carry exact component, browser, PG, and combination results after main updates.
Evidence: Imported successful sync, twelve-browser, isolated PG, and make test/build receipts; Backend run3127.
Impact: Task record only; model quality remains NOT_RUN and PRs stay draft.
Refs: U3 r0.5 implementation plan Task 5
Why: Keep the new OOXML registration gate and task record while retaining U3 fixes.
Evidence: Backend merged main 607c38d cleanly; full Go vet/test and selected zero-paid live-tag tests passed at d39e77c.
Impact: Updates the Backend gitlink and unrelated main task metadata; browser and composed checks follow.
Refs: U3 r0.5 implementation plan Task 5
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pptx-register-structural-gate.md(PR#543) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: Completion evidence must stay tool-written in the task card before final head validation.
Evidence: Imported successful task-sync, 344-test governance, full make test and build receipts.
Impact: Task record only; component pins and product behavior are unchanged.
Refs: U3 r0.5 implementation plan Task 5
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The task card and Documents pin must identify the fixed candidate and the independent review boundary.
Evidence: Tool-imported precheck, sync, tests, twelve-browser and isolated PG receipts; staged recursive pins passed.
Impact: Advances the Documents gitlink and task record; real model quality remains NOT_RUN.
Refs: U3 r0.5 implementation plan Task 5
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-plan-progress-note.md; R0=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: task metadata only; the feature workspace starts at c8eead49c5.
Refs: .task/feature-dhf-plan-progress-note.md
Why: The composed candidate must include the bounded evaluation record and queued/failure browser coverage.
Evidence: Backend and Frontend RED/GREEN receipts and full component suites.
Impact: Updates only Backend and Frontend gitlinks; final browser and composed gates follow.
Refs: U3 r0.5 independent review findings
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-card-merge-squash-detect.md(PR#544) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: Keep the approved DHF documentation and task archival while retaining the U3 implementation.
Evidence: Documents main merged into the feature branch; recursive gitlinks and staged diff inspected.
Impact: Resolves only the Documents gitlink conflict and carries current main metadata.
Refs: U3 r0.5 implementation plan Task 5
Why: Material uploads need an immediate truthful reply while incomplete tool streams remain blocked and diagnosable.
Evidence: Dev task card records ten browser scenarios, isolated PG/Redis, component suites, and composed test/build; one later governance test replay hit a concurrent fixed-port collision and remains under diagnosis.
Impact: Pins Native, Squad, Backend, Frontend, and Documents; no paid model request or merge.
Refs: U3 r0.5 implementation plan and feature-fast-slow-u2-u3-plan task card
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The archived card should remain accurate after its own closure PR merges.
Evidence: Only three temporal phrases changed; the card still points to PR #542 as the authoritative closure result.
Impact: Review, CI and cleanup records remain intact.
Refs: Dev PR #542
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=11aa76a3bc1c5047791f9a2de154e451634b6567.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The archived card still listed Review, synchronization, CI, merge and cleanup as NOT_RUN despite recorded completion.
Evidence: Exact PR heads, CI runs, merge SHAs, queue release and owner Stage 10 approval are linked in the card.
Impact: The terminal delivery section now agrees with its stage table and remaining U1 boundary.
Refs: Dev PR #542; Dev PR #540; RDM PR #365
Why: Automatic card backfill left the current stage and result summary describing the old WIP candidate.
Evidence: PR #102/#365/#540 merge readbacks, exact-head CI runs 3095/3092, independent review, owner Stage 7 recheck, and approved Stage 10 cleanup are recorded.
Impact: The archived card now shows the current U1 increment outcome and keeps historical checkpoints labeled as such.
Refs: Dev PR #540; RDM PR #365; Documents PR #102