Commit Graph
3316 Commits
Author SHA1 Message Date
weichen 3d51ff331e Merge current Dev main into U3 resource preparation
Why: Preserve the merged DHF progress note and task-card archive before writing the U3 resource proposal.

Evidence: Documents branch merged current main without conflict; Core and UI feature pins contain main pins; staged diff checked.

Impact: Updates only Documents gitlink and unrelated task archival.

Refs: U3 r0.5 stage-6 decision and resource preparation
2026-10-14 10:16:54 +00:00
weichen e1bc2602e1 Merge pull request 'Close merged task cards (feature/card-close-20261014-095723Z)' (#548) from feature/card-close-20261014-095723Z into main
ci / svc-realcombo (push) Successful in 1m41s
ci / test (push) Successful in 5m19s
ci / test-pg (push) Successful in 9m4s
2026-10-14 10:05:46 +00:00
weichen b89dd1c20e Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 2m0s
ci / test (pull_request) Successful in 5m20s
ci / test-pg (pull_request) Successful in 7m41s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-plan-progress-note.md(PR#547) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-14 09:57:23 +00:00
weichen bcf225d0b9 Merge pull request 'Record merged state of the first U1 increment in the DHF plan note' (#547) from feature/dhf-plan-progress-note into main
ci / svc-realcombo (push) Successful in 1m46s
ci / test (push) Successful in 5m22s
ci / test-pg (push) Successful in 7m49s
2026-10-14 09:53:34 +00:00
weichen 822a92c125 Record card-only main sync before U3 review
ci / svc-realcombo (pull_request) Successful in 2m32s
ci / test (pull_request) Successful in 6m11s
ci / test-pg (pull_request) Successful in 8m37s
Why: Stage-6 review must identify the current main base and final tool-written sync receipt.

Evidence: make task-sync at main 3538d40, recursive pins, and independent closure replay.

Impact: Task record only; all eight component pins remain unchanged.

Refs: U3 r0.5 implementation plan Task 5
2026-10-14 09:43:56 +00:00
weichen 7898860a09 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=3538d40f45ad5a7c779426eb3322f79751db380c; before_record=e88625024bf4fac166bb8b8180f6ca3091d74a64.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 09:43:23 +00:00
weichen 8522502e6e Record the redundant task-sync rerun receipt
ci / svc-realcombo (pull_request) Successful in 2m24s
ci / test (pull_request) Successful in 5m55s
ci / test-pg (pull_request) Successful in 8m31s
2026-10-14 09:43:16 +00:00
weichen e88625024b Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 09:42:57 +00:00
weichen f01b606bb3 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=3538d40f45ad5a7c779426eb3322f79751db380c; before_record=3c29e3cd1f85d99f8e1b56a9a8342c85cc0b555b.

Impact: task metadata only.

Refs: .task/feature-dhf-plan-progress-note.md
2026-10-14 09:42:20 +00:00
weichen 3c29e3cd1f Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 09:41:51 +00:00
weichen 502622151a Record make build receipt for the Documents pin bump 2026-10-14 09:41:40 +00:00
weichen 32a678f7ed Pin the DHF plan progress-note update in Documents
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.

Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.

Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.

Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
2026-10-14 09:41:20 +00:00
weichen 3538d40f45 Merge pull request 'Close the merged pptx structural gate task card' (#546) from feature/card-close-20261014-092758Z into main
ci / svc-realcombo (push) Successful in 2m1s
ci / test (push) Successful in 6m6s
ci / test-pg (push) Successful in 8m56s
2026-10-14 09:40:56 +00:00
weichen bd5da7b3fe Fix r0.5 review evidence at synchronized candidate
ci / svc-realcombo (pull_request) Successful in 1m48s
ci / test (pull_request) Successful in 5m7s
ci / test-pg (pull_request) Successful in 8m1s
Why: The task record must carry exact component, browser, PG, and combination results after main updates.

Evidence: Imported successful sync, twelve-browser, isolated PG, and make test/build receipts; Backend run3127.

Impact: Task record only; model quality remains NOT_RUN and PRs stay draft.

Refs: U3 r0.5 implementation plan Task 5
2026-10-14 09:36:21 +00:00
weichen 78d5fd7b0d Merge current Dev main into U3 r0.5 candidate
Why: Keep the new OOXML registration gate and task record while retaining U3 fixes.

Evidence: Backend merged main 607c38d cleanly; full Go vet/test and selected zero-paid live-tag tests passed at d39e77c.

Impact: Updates the Backend gitlink and unrelated main task metadata; browser and composed checks follow.

Refs: U3 r0.5 implementation plan Task 5
2026-10-14 09:28:53 +00:00
weichen 4a15fa0cea Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 2m14s
ci / test (pull_request) Successful in 5m28s
ci / test-pg (pull_request) Successful in 8m24s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pptx-register-structural-gate.md(PR#543) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-14 09:27:59 +00:00
weichen 4efeacdb8f Preserve synchronized r0.5 verification receipts
Why: Completion evidence must stay tool-written in the task card before final head validation.

Evidence: Imported successful task-sync, 344-test governance, full make test and build receipts.

Impact: Task record only; component pins and product behavior are unchanged.

Refs: U3 r0.5 implementation plan Task 5
2026-10-14 09:27:46 +00:00
weichen da93edf234 Merge pull request 'Gate structurally broken OOXML deliverables at registration' (#543) from feature/pptx-register-structural-gate into main
ci / svc-realcombo (push) Successful in 1m55s
ci / test (push) Successful in 5m27s
ci / test-pg (push) Successful in 8m3s
2026-10-14 09:24:42 +00:00
weichen f494cd7eaf Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=c8eead49c5e68b2e295927c0e82cc57bcb04bad5; before_record=bcc77122d6364165ac41dfa531f98ac825137bfd.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-14 09:18:20 +00:00
weichen bcc77122d6 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 09:17:56 +00:00
weichen 60dca09f8b Record r0.5 review fixes and replay evidence
Why: The task card and Documents pin must identify the fixed candidate and the independent review boundary.

Evidence: Tool-imported precheck, sync, tests, twelve-browser and isolated PG receipts; staged recursive pins passed.

Impact: Advances the Documents gitlink and task record; real model quality remains NOT_RUN.

Refs: U3 r0.5 implementation plan Task 5
2026-10-14 09:17:46 +00:00
weichen deac1025f1 Record second resync and test receipt
ci / svc-realcombo (pull_request) Successful in 1m49s
ci / test (pull_request) Successful in 5m0s
ci / test-pg (pull_request) Successful in 7m28s
2026-10-14 09:16:23 +00:00
weichen 85f42a6fd1 Record the task card for feature-dhf-plan-progress-note
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-dhf-plan-progress-note.md; R0=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.

Impact: task metadata only; the feature workspace starts at c8eead49c5.

Refs: .task/feature-dhf-plan-progress-note.md
2026-10-14 09:16:12 +00:00
weichen 93100bf249 Pin independently reviewed U3 fixes in Dev
Why: The composed candidate must include the bounded evaluation record and queued/failure browser coverage.

Evidence: Backend and Frontend RED/GREEN receipts and full component suites.

Impact: Updates only Backend and Frontend gitlinks; final browser and composed gates follow.

Refs: U3 r0.5 independent review findings
2026-10-14 09:14:25 +00:00
weichen 8d08051d27 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=c8eead49c5e68b2e295927c0e82cc57bcb04bad5; before_record=f9669c50e8fc934bb608e2b457e100287b8c080a.

Impact: task metadata only.

Refs: .task/feature-pptx-register-structural-gate.md
2026-10-14 09:12:02 +00:00
weichen f9669c50e8 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 09:11:32 +00:00
weichen c8eead49c5 Merge pull request 'Close merged task cards (feature/card-close-20261014-090136Z)' (#545) from feature/card-close-20261014-090136Z into main
ci / svc-realcombo (push) Successful in 2m5s
ci / test (push) Successful in 5m28s
ci / test-pg (push) Successful in 8m19s
2026-10-14 09:10:29 +00:00
weichen 00b35c5e6f Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 2m13s
ci / test (pull_request) Successful in 5m36s
ci / test-pg (pull_request) Successful in 8m29s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-card-merge-squash-detect.md(PR#544) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-14 09:01:36 +00:00
weichen 2dbe11c5d9 Merge pull request 'Detect squash-merged PRs when closing task cards' (#544) from feature/card-merge-squash-detect into main
ci / svc-realcombo (push) Successful in 2m10s
ci / test (push) Successful in 5m48s
ci / test-pg (push) Successful in 8m41s
2026-10-14 09:00:42 +00:00
weichen b01ae4e746 Merge current Dev main into U3 r0.5 candidate
ci / svc-realcombo (pull_request) Successful in 2m5s
ci / test (pull_request) Successful in 5m47s
ci / test-pg (pull_request) Successful in 9m29s
Why: Keep the approved DHF documentation and task archival while retaining the U3 implementation.

Evidence: Documents main merged into the feature branch; recursive gitlinks and staged diff inspected.

Impact: Resolves only the Documents gitlink conflict and carries current main metadata.

Refs: U3 r0.5 implementation plan Task 5
2026-10-14 08:56:02 +00:00
weichen 792bc0d2a0 Update verification summary after second sync
ci / svc-realcombo (pull_request) Successful in 1m51s
ci / test (pull_request) Successful in 5m13s
ci / test-pg (pull_request) Successful in 8m44s
2026-10-14 08:55:27 +00:00
weichen 948a77786e Fix r0.5 safe intake candidate across components
Why: Material uploads need an immediate truthful reply while incomplete tool streams remain blocked and diagnosable.

Evidence: Dev task card records ten browser scenarios, isolated PG/Redis, component suites, and composed test/build; one later governance test replay hit a concurrent fixed-port collision and remains under diagnosis.

Impact: Pins Native, Squad, Backend, Frontend, and Documents; no paid model request or merge.

Refs: U3 r0.5 implementation plan and feature-fast-slow-u2-u3-plan task card
2026-10-14 08:54:33 +00:00
weichen 0ec80f3fe3 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d; before_record=fc929bd2a3e14176811bff45437cb962b1e6a74c.

Impact: task metadata only.

Refs: .task/feature-pptx-register-structural-gate.md
2026-10-14 08:50:07 +00:00
weichen fc929bd2a3 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 08:49:43 +00:00
weichen b926c701f2 Record task-sync evidence after the rebase onto latest main
ci / svc-realcombo (pull_request) Successful in 1m50s
ci / test (pull_request) Successful in 9m1s
ci / test-pg (pull_request) Successful in 10m31s
2026-10-14 08:49:38 +00:00
weichen 55ab7489e5 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d; before_record=b6a070265733b0995a2724e1d600e914c21200ef.

Impact: task metadata only.

Refs: .task/feature-card-merge-squash-detect.md
2026-10-14 08:49:12 +00:00
weichen b6a0702657 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 08:48:51 +00:00
weichen 7e9ebdea50 Merge pull request 'Close the merged DHF U1 delivery task card' (#542) from feature/card-close-dhf-u1 into main
ci / svc-realcombo (push) Successful in 2m5s
ci / test (push) Successful in 5m47s
ci / test-pg (push) Successful in 7m49s
2026-10-14 08:46:12 +00:00
weichen 15b2defd76 Correct the evidence interpretation after the green rerun
ci / test (pull_request) Successful in 12m55s
ci / test-pg (pull_request) Successful in 10m49s
ci / svc-realcombo (pull_request) Successful in 2m56s
2026-10-14 08:34:40 +00:00
weichen 60d48e0580 Make archived DHF closure status durable
ci / svc-realcombo (pull_request) Successful in 2m46s
ci / test (pull_request) Successful in 8m42s
ci / test-pg (pull_request) Successful in 11m55s
Why: The archived card should remain accurate after its own closure PR merges.

Evidence: Only three temporal phrases changed; the card still points to PR #542 as the authoritative closure result.

Impact: Review, CI and cleanup records remain intact.

Refs: Dev PR #542
2026-10-14 08:33:33 +00:00
weichen c20c9de70d Re-record governance evidence at the synced head 2026-10-14 08:33:23 +00:00
weichen ffced081d4 Link task card to delivery PRs
ci / svc-realcombo (pull_request) Successful in 2m15s
ci / test (pull_request) Failing after 5m51s
ci / test-pg (pull_request) Successful in 13m44s
2026-10-14 08:31:06 +00:00
weichen 4cb3075040 Record sync checkpoint on task card
ci / svc-realcombo (pull_request) Successful in 2m12s
ci / test (pull_request) Successful in 6m32s
ci / test-pg (pull_request) Successful in 12m52s
2026-10-14 08:29:20 +00:00
weichen c4c6eff7a8 Record review and verification summary on task card 2026-10-14 08:29:02 +00:00
weichen cd9a5d19e7 Record task-sync evidence on the card 2026-10-14 08:28:53 +00:00
weichen 375e4db09f Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=11aa76a3bc1c5047791f9a2de154e451634b6567; before_record=e579783cd35b36ecbf258809f05392de21fd960f.

Impact: task metadata only.

Refs: .task/feature-card-merge-squash-detect.md
2026-10-14 08:28:52 +00:00
weichen e579783cd3 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=11aa76a3bc1c5047791f9a2de154e451634b6567.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-14 08:28:27 +00:00
weichen da9d1c5a09 Fill task card scope, verification and evidence interpretation 2026-10-14 08:28:24 +00:00
weichen 7dd8d0f52e Close stale DHF delivery gate rows
ci / svc-realcombo (pull_request) Successful in 1m59s
ci / test (pull_request) Successful in 6m16s
ci / test-pg (pull_request) Successful in 15m5s
Why: The archived card still listed Review, synchronization, CI, merge and cleanup as NOT_RUN despite recorded completion.

Evidence: Exact PR heads, CI runs, merge SHAs, queue release and owner Stage 10 approval are linked in the card.

Impact: The terminal delivery section now agrees with its stage table and remaining U1 boundary.

Refs: Dev PR #542; Dev PR #540; RDM PR #365
2026-10-14 08:28:21 +00:00
weichen de1754f8f5 Finalize DHF task card with merged evidence
ci / test-pg (pull_request) Failing after 16s
ci / svc-realcombo (pull_request) Successful in 2m2s
ci / test (pull_request) Successful in 5m16s
Why: Automatic card backfill left the current stage and result summary describing the old WIP candidate.

Evidence: PR #102/#365/#540 merge readbacks, exact-head CI runs 3095/3092, independent review, owner Stage 7 recheck, and approved Stage 10 cleanup are recorded.

Impact: The archived card now shows the current U1 increment outcome and keeps historical checkpoints labeled as such.

Refs: Dev PR #540; RDM PR #365; Documents PR #102
2026-10-14 08:23:24 +00:00