Why: include the current integration baseline before verification.
Evidence: fetched origin/main=9b5be3926eaa394a9e520fd72ffdf6d0a48d1aef.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pin-backend-identity-cli.md(PR#477) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the newly merged service identity baseline before final CI.
Evidence: SELF task-sync, ancestor check, generator replay and document-link receipts in the task card.
Impact: task metadata only; all reviewed policy and generator content is unchanged.
Refs: .task/feature-agent-pr-merge.md; PR #476
Why: Backend #180 moved the identity CLI to pkg/identity (shared with
Agent-System-RDM per PR 276); Dev main should consume it so composed
binaries carry the same identity semantics and capabilities output.
Evidence: make test exit 0 (combined suite on the bumped pin);
make test-pins ok; rows in the task card.
Impact: gitlink only (bbe9773 -> acabb85, spans #177/#179/#180).
Refs: .task/feature-pin-backend-identity-cli.md; user goal directive
2026-10-12 (implement remaining U1/U2/U3 items in order).
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=6a494d3977e6557e7bebe0e5bb1c4a12091296e0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: preserve the actual main PR and independently reviewed object before final CI.
Evidence: completed review and authoritative synchronization receipts in the task card; CI must bind the new HEAD.
Impact: task metadata only; no normative or component change.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/476
Why: bind delivery to the completed review and the user authorized cleanup endpoint.
Evidence: independent review run 20261012-123744-f14f6caa and raw records are captured in the task card; final PR CI is still required.
Impact: task metadata only; all eight reviewed policy and generator files remain unchanged.
Refs: .task/feature-agent-pr-merge.md
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-pin-backend-identity-cli.md; R0=6a494d3977e6557e7bebe0e5bb1c4a12091296e0.
Impact: task metadata only; the feature workspace starts at 6a494d3977.
Refs: .task/feature-pin-backend-identity-cli.md
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-svc-identity-u1.md(PR#474) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=8ebf5021468a1301ccbe2fe0568508e16d8bb708.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: batch update leaked AGENT_SYSTEM_INSTANCE_ID/DBREF from one service
to the next, and RDM artifacts without the identity CLI were stopped and
overwritten before their startup identity refusal surfaced, leaving
rdm1/rdmcand in a mixed registration-vs-artifact state (2026-10-12).
Evidence: make test-governance 217 OK; tests.test_svc_identity and
tests.test_svc_precheck green; rows recorded in the task card.
Impact: env_config resets identity env per service; capability probe is
timeout-guarded and rejects serve-shaped output; identity ensure moves
to adoption/init (bare start is verify-only); deploy builds and gates
candidates before stopping the old service (refuses identityless
candidates, completes missing identity rows via the candidate); update
runs svc_manifest_migrate like every other lifecycle entry.
Refs: .task/feature-svc-identity-u1.md; user root-cause report 2026-10-12.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=8ebf5021468a1301ccbe2fe0568508e16d8bb708.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: retain the synchronization against the advancing authoritative target.
Evidence: SELF task-sync receipt in .task/feature-agent-pr-merge.md; CI on the final synchronized candidate remains pending.
Impact: task metadata only.
Refs: .task/feature-agent-pr-merge.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=6a44736f03f08428e68861f923b18ca645043efe.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pin-backend-read-consumption.md(PR#470) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: avoid general manual-stage wording overriding stages eight and nine.
Evidence: SELF document and link checks captured in the task card; existing governance checks cover unchanged script and test content.
Impact: clarify two policy sentences and record review-node synchronization; no mechanism or component change.
Refs: .task/feature-agent-pr-merge.md; policy/delivery.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=ac1de9c4c44a74b6a20a76ef3d948b492db84c39.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: preserve the tested policy object and separate local checks from pending review and CI.
Evidence: SELF command receipts in the task card; 212 governance cases with one existing PG-only skip and 12 verified links.
Impact: task metadata only; policy and component content are unchanged.
Refs: .task/feature-agent-pr-merge.md
Why: Archived card still said merge/cleanup NOT_RUN, and the green
make-test retry landed on the feature branch after PR #468 merged.
Evidence: merge 1325824 CI push jobs success; receipt from 30a5421.
Impact: Close record matches merged facts; SELF capacity still not a release.
Refs: Dev #468; Documents #83#86
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: make the agent responsible for merging reviewed PRs without another human merge step.
Evidence: SELF governance and generated-card checks are captured in .task/feature-agent-pr-merge.md; CI remains required on the final PR HEAD.
Impact: update project delivery policy, agent entry points, task metadata and closure guidance; preserve platform protection and scoped authorization.
Refs: .task/feature-agent-pr-merge.md; user instruction on 2026-10-12
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-svc-identity-u1.md; R0=d8a269ab2fd20e4783ba0cde6a4794a702ad7571.
Impact: task metadata only; the feature workspace starts at d8a269ab2f.
Refs: .task/feature-svc-identity-u1.md
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-agent-pr-merge.md; R0=d8a269ab2fd20e4783ba0cde6a4794a702ad7571.
Impact: task metadata only; the feature workspace starts at d8a269ab2f.
Refs: .task/feature-agent-pr-merge.md
Why: resolve archive card conflict after u7 card already landed on main.
Evidence: took main .task/archive/feature-u7-capacity-wrap-measure.md; kept audit-combo archive.
Impact: #449 only archives remaining audit-combo debt if needed.
Refs: Dev #449
Co-authored-by: Cursor <cursoragent@cursor.com>