Why: the approved collaboration plan U1 requires a fixed deployment manifest, tier config contract, migration mapping, capacity contract, isolation test scheme and KTD14 copy-protection contract as the single source of truth for team-tier operations.
Evidence: contract keys match backend config.go tier/pool fields (U2, backend branch feature/collab-storage-pg-tier); local verification used svc.sh collabtest on 127.0.0.1:8897 and Redis on 6399.
Impact: docs only (new guide + usage.md cross-links); no code change.
Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md sections 5 (U1/U2), KTD1/KTD8/KTD12/KTD14.
Why: The user ruled on 2026-10-11 the three open product choices (first
pilot = full analysis page inside the conversation; enable/disable via a
trusted compiled plugin; U1 trial on MiniMax M3 + M2.7-highspeed with
sanitized materials and a CNY 200 cap), so the proposal now publishes as
the direction's master record instead of a local draft.
Evidence: Doc self-check receipts live in the Dev task card
feature/generative-ui-research; the rulings are recorded in the doc's
"用户裁定记录" section and mirrored in INDEX.md.
Impact: Documents-only change (new proposal + index entry). No runtime,
contract, or code changes; U1 trial start and deployment stay separately
reviewed.
Refs: Dev task feature/generative-ui-research
Why: freeze the direction for 10-100 user multi-project collaboration storage (PostgreSQL team tier, migration, staged multi-instance) before U1+U2 implementation starts.
Evidence: static review record and SELF audit receipt included; user approval recorded in Dev task card 2026-10-11 (instruction to start the transformation per the plan).
Impact: docs only - new proposal, index entry, review record, audit receipt; no code or runtime change.
Refs: Dev .task/feature-collaboration-storage-plan.md; plan section 5 names U1+U2 as the first increment.
Why: The E1 quick-fix increment landed (delegate full text, MiniMax
reasoning split, sandbox deps layer, parallel tool execution with kernel
ordering) and the proposal is the master record, so its stage table and
the index row must reflect the actual progress with links.
Evidence: Agent-Native #42/#43/#44, Backend #127, Dev task
feature/agent-e1-parallel-fixes (live verification receipts: F2 zero
think-leak, F3 sandbox IMPORTS-OK, F5 concurrent overlap; eval
toolFailures 19->11, unverifiedFacts 7->12 recorded honestly).
Impact: Documents-only progress backfill; E2-E5/S0 remain unauthorized.
Why: The user asked for a researched design covering subagent use,
tiered model routing (Claude via dmxapi for complex work, MiniMax for
the rest), a millisecond/sub-second task sandbox (record-only), and a
verdict on why the agent still feels weaker than codex/claude-code/kimi.
Why: Four research threads (external frontier survey, subagent/routing
evidence, harness-vs-model attribution, local code audit and probes)
converge on role/stage routing instead of whole-task routing, and on
three corrections to the sandbox assumptions (overlay is not a snapshot;
snapshots defer conflicts to merge time; destroy must follow sealing).
Evidence: Local measurements are SELF receipts in the Dev task card
(bwrap namespace ~7ms, overlay same, docker ~142ms; MiniMax reasoning
split; dmxapi /v1/messages cache_read; EXT-16 sandbox missing the
python-docx layer). External claims carry per-item source URLs in the
proposal's section 8.
Impact: Documents-only addition: new proposal 2026-10-10 (E1-E5/S0
increments, D/R workstreams, sandbox tiers L0-L2) plus INDEX rows for it
and the previously unlisted G1 package. No product code changes; all
implementation increments stay unauthorized until approved.
Refs: proposals/2026-10-09-agent-quality-improvement-plan.md (P4/P5,
model A/B), 2026-10-09-ext-g1-b1-b3-exec-backend.md (EXT-16),
Dev task feature/agent-exec-routing-sandbox-plan.
Why: RDM G1/G2 are blocked on four base capabilities - the member agent
cannot see published project knowledge inside a run, plugin commands are
unreachable as tools, members cannot see or open conversations in shared
projects, and the isolated exec tier needs a backend seam.
Evidence: SELF - code citations verified at Dev main (runmgr.go:726-736
owner-only Retrieve; hostcaps.go:64-66 owner-only search; server.go:438-441
owner-only listProjects; store/projects.go:124-130 owner-scoped conversation
creation); bwrap availability tested on this host (2026-10-09).
Impact: Docs only. New proposal docs/proposals/2026-10-09-ext-g1-b1-b3-exec-backend.md
registering EXT-13..EXT-16 per the compat-policy template; no code change.
Refs: RDM plan V1.1 sections 3.3/3.4/5.3; owner Q1-Q8 (Q4=option A, Q2)
Why: The 2026-10-09 diagnosis on real run transcripts identified the direct
conversation path's failure chain and a phased plan was approved with six
explicit user rulings (open up tools, kernel-transcript-authoritative context,
markdown-source deliverables with all file types retained, gate demotions,
uncapped stronger-model evals, real-model eval required for behavior changes).
The plan needs a durable main record per the long-term-direction policy, and
the 2026-09-30 preview proposal's "fs tools hidden by default" ruling is
superseded by ruling 1, which must be discoverable from the index.
Evidence: SELF - the record cites the diagnosis session, the transcript
sources (pg1 + legacy SQLite, 62 assistant turns) and the before-baseline
report location on the task card; no code or pointers changed in this repo.
Impact: New proposal 2026-10-09-agent-quality-improvement-plan.md plus one
index row. Subsequent phase tasks reference this record instead of restating
the plan.
Refs: Dev task feature/agent-quality-phase01; supersedes the fs-tool default
in 2026-09-30-file-preview-and-reserved-capabilities.md §2.3.
Why: v0.2.0 is the hard prerequisite for RDM shared work, and the release
checklist referenced a stale SurfaceVersion and tag message.
Evidence: SELF - scope lines are tied to merged Backend PRs (#66-#110);
Backend #110 CI success; UI composite run 1369 shows 14 files/103 tests.
Impact: Adds docs/records/2026-10-09-base-v0.2.0-release.md and points the
compat policy and the EXT-1 proposal at the actual 2.5.0-experimental line.
Tag creation and push stay with the owner (dual-key rule).
Refs: Dev feature/base-v020-release; Backend #110
Why: U0 (merged in RDM) rules that domain logic stays downstream and the base needs seven minimal generic capabilities; the formal four-element applications are the only legal path to base changes.
Evidence: All current-state citations re-verified at Dev 34a2bbe (backend fe7c245); RDM requirement source pinned at RDM main ca72cfc.
Impact: New proposal doc + one INDEX row; no code, no surface change in this PR.
Refs: RDM U0 proposal section 5 / ruling D1; extension-compat-policy; phase-plan section 3.3.
Why: The RDM plan's 2026-10-07 snapshot (downstream at zero, N1 in
flight, O1/O3/O7 blocked) was contradicted by the RDM repo's 103 merged
PRs; the planning index registered this as an open reconciliation item
and named it the preferred follow-up to the stage-record task.
Evidence: isolated clone replay at RDM 4feb2f0 (pins=v0.1.0) - make
test exit 0, -ms1 PASS (same-source gold caveat recorded), ms0
acceptance PASS=9/SKIP=0 on a disposable postgres container, five
upload probes, and entrance probes (chat 400 vs commands 200); card/
PR snapshot JSON; all receipts SELF (RDM has no CI), stored under
docs/records/2026-10-08-rdm-status-*.json. The private minutes probe
receipt stays local by decision; only hashes and metrics are recorded.
Impact: adds plan SS2.3 (row-by-row re-verdict, MS1 seven-clause audit,
six registered gaps), marks SS2 as a historical snapshot, updates the
index milestone table and closes the RDM-snapshot open item, registers
the dual-main-record ruling and the missing-CI gap.
Refs: Dev task feature/rdm-status-review; Documents index next-step
(2026-10-08).
Why: The planning index listed the stage-record reconciliation as the
preferred next task: N1 WP6b/6c transfers, the Q1 platform-task vs
squad-run boundary, I1 reserved command consumption, and the I2 card's
dangling reference all feed N2/Q3 and RDM dependency judgments.
Evidence: Dev merges #230/#231/#234/#235/#237/#240/#242 verified in
main via git log --merges on 2026-10-08; stage claims are SELF-level
card statements, explicitly not replayed; intent command.go:18-25/78-84
checked for the Cancel/Handoff ruling.
Impact: Adds a status-backfill section (SS7) to the N1/Q1/I1 plan with
per-item done/transferred/todo ownership, an I2 status note in the
stack completion plan (the sole I2 main record), and INDEX navigation
updates; registers the truncated Q2/Q3 archive lines as a new open
item.
Refs: Dev task feature/agent-stack-stage-records; planning index
"next-step" recommendation (2026-10-08).
Why: documents main gained two plans after the index snapshot, and Dev has since merged N2, N3, Q2, and Q3.
Evidence: 21 markdown proposals are present at HEAD; merge SHAs were read from Dev origin/main git log --merges.
Impact: navigation only; proposal bodies and acceptance claims are unchanged.
Refs: Documents #43#44; Dev #244#247#248#249#250#251#253
Why: the index branch was cut before N3 and Q2/Q3 plans landed on main.
Evidence: merge-tree reported no content conflicts against origin/main 16795ed598.
Impact: bring those two proposal files into the index branch without rewriting history.
Refs: documents main
Why: N1-N3/Q1/I1-I2 are closed; per the completion doc dependency
order Q2 then Q3 are next. Both need plans grounded in current code:
squad has no topology abstraction (two modes, dormant Cond
combinators, dead FactItem.Verified), RespondDecision has no actor
attribution (the mailbox acceptance attack surface), WorkflowDef
execution compresses steps into SpawnSubagent, and adapters/a2a does
not exist.
Evidence: three-area survey with file:line citations at the pinned
baselines (agent-squad c462bc4, backend 6e02a1f); the review
equivalence baseline is quoted from backend runReview with its test
anchors; the P4 ruling is quoted verbatim from agent-harness.md.
Impact: documentation only; Q2 implementation starts after merge,
Q3 after Q2 closes.
Refs: 2026-10-02-agent-stack-completion.md Q2/Q3 sections
Why: N2 is closed; per the completion doc's dependency order N3 is
next and needs a plan grounded in current code (the crash window
between persist and intent commit is unprotected, the product
conversation path has zero durability, span names/attributes do not
follow the GenAI convention, the memory port does not exist).
Evidence: five-area survey with file:line citations at the pinned
baselines (agent-native 74aa60b, backend 7980a8a, core 0b5c774);
audit N1/N21 verified fixed, N6/N20 verified still open.
Impact: documentation only; work starts after this plan merges.
Refs: 2026-10-02-agent-stack-completion.md N3 section
Why: expose existing milestone records and distinguish source observations from combination tests.
Evidence: linked records exist at the fixed source version; proposal blobs and the observation receipt remain unchanged.
Impact: index wording and navigation only; no plan or acceptance decision changes.
Refs: docs/proposals/INDEX.md
Why: author and task-account names do not establish ownership of a plan.
Evidence: independent review found four missing owner fields in the adopted set and N2 also has none; fourteen source headers explicitly name weichen.
Impact: correct the index attribution and clarify the local N2 document adoption boundary; source proposals remain unchanged.
Refs: planning-index review P2; docs/proposals/INDEX.md
Why: make existing directions, milestones and tasks discoverable without treating document claims as acceptance.
Evidence: fixed file blobs, 55 PR API records and Git ancestry are preserved as SELF observations; document links and all 19 proposals are checked.
Impact: navigation and evidence only; original plans, approval scope and business code are unchanged.
Refs: Dev feature/planning-index; docs/proposals/INDEX.md
Why: N1/Q1/I1/I2 are closed; per the completion doc's dependency order
N2 is next and needs a plan grounded in current code (the audit's N4 is
still open; the product-side ctxasm trim is the real gap for acceptance
clause 2; MCP 2026-07-28 features are absent).
Evidence: six-area survey with file:line citations at the pinned baselines
(agent-native ead690b, backend 68addfd); audit items N2/N3/N18/N19/N22
verified fixed against current code, N4 verified still open.
Impact: documentation only; work starts after this plan merges.
Refs: 2026-10-02-agent-stack-completion.md N2 section
Why: The further-objective docs are now the system's next big-phase
target; the plan pins the two-tree-one-net product on top of the
generic platform with two hard invariants - downstream-only domain
logic and always-degradable-to-generic-agent when the plugin is off.
Evidence: docs-only change; milestone mapping verified against
further-objective 10 (W1-W16), readiness claims verified against the
pinned worktrees (EXT-1 symbols in surface.txt, v0.1.0 tags, RDM repo
seed facts as recorded in vision doc 13).
Impact: Adds one proposal; no code changes.
Refs: docs/proposals/2026-10-07-agent-stack-n1q1i1-plans.md