Why: The task card and Documents pin must identify the fixed candidate and the independent review boundary.
Evidence: Tool-imported precheck, sync, tests, twelve-browser and isolated PG receipts; staged recursive pins passed.
Impact: Advances the Documents gitlink and task record; real model quality remains NOT_RUN.
Refs: U3 r0.5 implementation plan Task 5
Why: The composed candidate must include the bounded evaluation record and queued/failure browser coverage.
Evidence: Backend and Frontend RED/GREEN receipts and full component suites.
Impact: Updates only Backend and Frontend gitlinks; final browser and composed gates follow.
Refs: U3 r0.5 independent review findings
Why: Keep the approved DHF documentation and task archival while retaining the U3 implementation.
Evidence: Documents main merged into the feature branch; recursive gitlinks and staged diff inspected.
Impact: Resolves only the Documents gitlink conflict and carries current main metadata.
Refs: U3 r0.5 implementation plan Task 5
Why: Material uploads need an immediate truthful reply while incomplete tool streams remain blocked and diagnosable.
Evidence: Dev task card records ten browser scenarios, isolated PG/Redis, component suites, and composed test/build; one later governance test replay hit a concurrent fixed-port collision and remains under diagnosis.
Impact: Pins Native, Squad, Backend, Frontend, and Documents; no paid model request or merge.
Refs: U3 r0.5 implementation plan and feature-fast-slow-u2-u3-plan task card
Why: The archived card should remain accurate after its own closure PR merges.
Evidence: Only three temporal phrases changed; the card still points to PR #542 as the authoritative closure result.
Impact: Review, CI and cleanup records remain intact.
Refs: Dev PR #542
Why: The archived card still listed Review, synchronization, CI, merge and cleanup as NOT_RUN despite recorded completion.
Evidence: Exact PR heads, CI runs, merge SHAs, queue release and owner Stage 10 approval are linked in the card.
Impact: The terminal delivery section now agrees with its stage table and remaining U1 boundary.
Refs: Dev PR #542; Dev PR #540; RDM PR #365
Why: Automatic card backfill left the current stage and result summary describing the old WIP candidate.
Evidence: PR #102/#365/#540 merge readbacks, exact-head CI runs 3095/3092, independent review, owner Stage 7 recheck, and approved Stage 10 cleanup are recorded.
Impact: The archived card now shows the current U1 increment outcome and keeps historical checkpoints labeled as such.
Refs: Dev PR #540; RDM PR #365; Documents PR #102
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-template-pipeline-plan.md(PR#540) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: The Documents pin and authoritative base changed after the prior Stage 7 GATE.
Evidence: make evidence captured sync, make test, and make build on the new component combination; the initial uncommitted-pin failure remains recorded.
Impact: Dev task card identifies the tested Documents SHA and awaits current-head CI and review.
Refs: Dev PR #540; Documents PR #102; DHF U1 Stage 8 review
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d23fb4363dcc0a206e71e47f9cd23a644c7e1c70.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Stage 8 review found that the main plan still described the approved increment as a draft.
Evidence: Documents commit 6619835 adds a dated status note without changing the approved plan body; the first pre-commit combination check correctly rejected the uncommitted pin drift.
Impact: Dev now records the exact Documents component SHA for renewed combination validation.
Refs: Documents PR #102; Dev PR #540; DHF U1 Stage 8 review
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d23fb4363dcc0a206e71e47f9cd23a644c7e1c70.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The user approved the r0.5 written design for detailed planning; the resulting plan must be traceable from the Dev task and project entry.
Evidence: Documents 25a561b passed link and diff checks; staged Dev make test completed exit 0 through make evidence in the task card.
Impact: Pin plan and approval status only. Product code, new paid model calls, merge, and deployment remain not run.
Refs: U3 r0.5 plan; Documents PR #95; Dev PR #512
Why: PR #457 landed as a squash so main has no "from
feature/svc-pidcheck-leak into main" merge commit and task-close's
card_merge did not pick the card up; user authorized wrap-up on
2026-10-14. R2 (service restoration, rdmcand independent data) was
verified live today before closure.
Evidence: merge 226a4af157 verified as
origin/main ancestor; SELF receipts /tmp/svc-list-verify-20261014T072236.json
and /tmp/svc-info-rdmcand-verify-20261014T072259.json record the live
svc-list and svc-info checks; in-card test-governance receipts back R1.
Impact: backfills status, results, merge and cleanup records on the
card and moves it to .task/archive/; no code changes.
Why: Dev main advanced before the WIP PR, so the fixed Documents pin needed fresh combination evidence on the new base.
Evidence: make task-sync incorporated d40579e; make test and make build exited 0 at 5f88fd6 with SELF receipts.
Impact: Task evidence only; CI/GATE and final merge window remain pending.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The authoritative main advanced with facts and task-governance changes before the written design review.
Evidence: make task-sync SELF receipt /tmp/fast-slow-u3-r05-design-review-sync.json; the post-sync make test completed exit 0 and its full evidence output is in the task card.
Impact: Preserve the unchanged Documents 0d473fe design pin while recording the new Dev base and the need for exact-head CI. No product code or paid model call changed.
Refs: U3 r0.5 design; Dev PR #512; Documents PR #95
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The updated Documents pin needed fresh combined tests before its PR candidate could be fixed.
Evidence: make task-sync changed=0; make test and make build exited 0 at f628e6b with SELF receipts.
Impact: Task evidence only; publication and deployment remain untouched.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: The Documents main gained an unrelated merge-queue report before PR submission, so the feature branch must include the current authoritative base.
Evidence: Comparing c256558 and fdca353 shows only the merge-queue report changed; the DHF plan, index and asset inventory retain their bytes. Dev combination tests follow on this exact pin.
Impact: Update the Documents gitlink and stage-seven trace; no DHF package, publication or runtime data change.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: The single r0.4 A01 failed both staged-result and fast-feedback quality; the user approved writing a conservative next design.
Evidence: Documents 0d473fe link check and diff check; Dev staged-gitlink make test exit 0 through make evidence in the task card. The prior paid sample and independent assessment remain unchanged.
Impact: Add only design, navigation, and task traceability. Product behavior, paid model allowance, merge, and deployment remain unapproved.
Refs: U3 r0.5 design; Dev PR #512; Documents PR #95
Why: The synchronized Dev combination has a new exact test/build receipt for the current DHF increment.
Evidence: make task-sync, make test and make build at 6b5cc2de58 exited 0; source is SELF in the task card.
Impact: Task record only; PR HEAD CI, owner acceptance and deployment remain pending.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=427e9faf47641a427c5f2173244f65b8867c4500.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The Dev task card must preserve the manual stage boundary before formal verification begins.
Evidence: Owner confirmed the fixed U1 review object with 14 DOC fidelity and 40 assets still open.
Impact: Stage state only; no component, publication or deployment change.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=427e9faf47641a427c5f2173244f65b8867c4500.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Dev main and component pins advanced before the U1 increment review, so the new combination needed its own test and build evidence.
Evidence: make task-sync, make test, and make build exited 0 with SELF receipts at the synchronized Dev checkpoint 71fabf3120.
Impact: Task evidence only; no component or plan-body changes beyond the synchronized main composition.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: F2 token extraction predates the two-section (HOME/IMC) layout of
~/.secrets/gitea so it concatenated both tokens and always failed; F6
registered a grep BRE alternation that facts-verify unescapes into a
literal pipe, failing re-verification and misaligning precheck's naive
pipe split into a spurious F6 date-format expiry warning, while both
underlying facts still hold.
Evidence: make facts-verify now 6/6 PASS with last_verified refreshed
to 2026-10-14; new regression test for escaped pipes in facts rows;
full governance suite 342 tests OK (18 skipped); precheck [facts] line
reports all facts fresh on the fixed parser.
Impact: policy/facts.md F2 (HOME-section awk extraction) and F6
(negated pipe-free grep); scripts/task.sh precheck neutralizes escaped
pipes the same way facts-verify does; tests/test_task.py covers it.
Refs: precheck WARN 过期事实 F6(日期格式); AGENTS.md 证据与验证门禁.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=4f84c2e1630cd0311643529fae1c3a99f1dd5d64.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The Dev project entry and task card still described only three accepted packages after the DI owner review.
Evidence: RDM DI catalog binds four exact hashes and RDM local tests/build passed at 9997990; Dev git diff --check receipt is in this task card.
Impact: Progress record only; Documents pin, publication state, deployment and runtime data are unchanged.
Refs: PROJECT.md; .task/feature-dhf-template-pipeline-plan.md
Why: The authorized real-model sample failed without checkpoints or a final result, and failed-child Usage was underreported in the original candidate.
Evidence: Independent A01 assessment 2ac373ed; Backend accounting review d53cc969; SELF combination receipt /tmp/fast-slow-u3-r04-20261014/usage-fix-final-dev-combo.json and Backend GATE run 3079.
Impact: Keep eight draft PRs and the original sample intact; pin Backend 0637547 and Documents c53662a while marking stage 7, merge, and deployment not run.
Refs: U3 r0.4 implementation plan; task feature-fast-slow-u2-u3-plan
Why: Record the separate one-time A01 resource authorization and fix the exact Backend revision with its own guarded label and output name.
Evidence: The selector tests failed before the change and passed afterward. Full Backend vet/Go and selected zero-paid live-tag suites, Dev strict pins and build passed; full new-head CI and preflight are required before any paid call.
Impact: Evaluation-only Backend gitlink and task evidence. No provider request, merge or deployment.
Refs: U3 r0.4 stage-6 conclusion and one-time A01 resource proposal; Backend PR #193
Why: Keep the integration entry aligned with the separate project-proposal, F01 and F02 package decisions.
Evidence: SELF RDM make test passed on 87fa010; owner four-hash decisions are recorded in the RDM task card.
Impact: Progress metadata only; 44 assets remain unpublished and 14 DOC fidelity reviews remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration task aligned with the two unpublished process-validation Word packages and their owner review boundary.
Evidence: SELF RDM make task-sync and GOWORK=off make test passed on 10933dc; receipts remain in the RDM task card.
Impact: Progress metadata only; no Documents pin, dictionary, live data, or publication change.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=4f84c2e1630cd0311643529fae1c3a99f1dd5d64.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Preserve the user-approved stage-6 conclusion at the reviewed Dev SHA and distinguish it from the newly synchronized U7-containing candidate.
Evidence: Readiness precheck and task-resume passed after Backend/Dev main merges; Backend vet/full Go/live-tag checks and Dev strict pins passed. Failed precheck/sync receipts remain attached. New exact-head combination/CI are still required.
Impact: Task record only; no paid model authorization, merge or deployment.
Refs: U3 r0.4 stage-6 review; Dev PR #512