Commit Graph
3156 Commits
Author SHA1 Message Date
weichen e31443a8ff Present the U3 r0.3 zero-paid review candidate
ci / svc-realcombo (pull_request) Successful in 1m44s
ci / test (pull_request) Successful in 5m4s
ci / test-pg (pull_request) Successful in 7m10s
Why: The approved implementation and mechanism validation are complete, while the real-model quality gate remains unrun.

Evidence: Dev ef6f650 make test/build exit 0 with imported SELF receipt; Backend 5f53f80 independent code replay and v10 PostgreSQL/HTTP receipts are linked in the card.

Impact: Update task/project status for human stage-6 review; no provider request, merge or deployment.

Refs: Dev PR #512; Documents PR #95
2026-10-13 18:08:21 +00:00
weichen ef6f650892 Preserve final U3 r0.3 sync receipt
Why: The one-shot trial candidate must be tied to the current authoritative main before its exact combination and CI gates.

Evidence: make task-sync exit 0, sync_base 57bcb17, changed 0; complete SELF receipt imported by make evidence.

Impact: Task record only; no paid trial authorization or provider call.

Refs: Dev PR #512; r0.3 plan Task 5
2026-10-13 18:02:25 +00:00
weichen 3cc7ec2c28 Pin distinct U3 r0.3 evaluation preparation
Why: The separately gated A01 trial needs a unique label and raw result file while preserving the consumed r0.2 sample.

Evidence: Backend 5f83454 label/output tests and prior Dev 6f91ca9 combination receipt are recorded with their exact SHAs; new exact-head validation follows.

Impact: Zero-paid evaluator code and report pin only; no provider request, merge or deployment.

Refs: Dev PR #512; Backend #193; Documents #95
2026-10-13 18:00:59 +00:00
weichen 6f91ca911a Preserve U3 r0.3 acceptance sync evidence
Why: The latest authoritative main must be included before fixing the final validation object.

Evidence: make task-sync exit 0 at sync_base 57bcb17, complete SELF receipt imported by make evidence; component gitlinks did not change.

Impact: Task record only; exact-head Dev combination and platform checks remain pending.

Refs: Dev PR #512; r0.3 plan Task 4
2026-10-13 17:52:48 +00:00
weichen be3c8d68db Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=57bcb17ea212a531186b6e21617a7f3bea65a791; before_record=dc93443e55bc0af91c15129273822563bace2d34.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-13 17:52:11 +00:00
weichen dc93443e55 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=57bcb17ea212a531186b6e21617a7f3bea65a791.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 17:51:44 +00:00
weichen 7c55c0a113 Preserve U3 v10 mechanism acceptance evidence
Why: The final zero-paid candidate has independent code review and task-owned database/browser results at fixed SHAs.

Evidence: Imported PostgreSQL and HTTP Playwright SELF receipts; reviewer independently replayed Backend 5f53f80 and found no remaining Critical/Important.

Impact: Pin Documents b776fe1 and record code mechanism PASS separately from model quality NOT_RUN; no paid call or merge.

Refs: Dev PR #512; Documents PR #95
2026-10-13 17:51:24 +00:00
weichen 24058c064b Pin conservative U3 analysis validation
Why: Independent review found an unproven approval statement hidden before a caution word.

Evidence: The new counterexample failed before Backend 5f53f80; earlier PostgreSQL receipt and review findings remain tied to their original SHAs.

Impact: Advance the zero-paid v10 material candidate; full exact-head validation and independent re-review remain pending.

Refs: Dev PR #512; Backend PR #193; r0.3 review findings
2026-10-13 17:48:15 +00:00
weichen 922f56b1e6 Pin guarded U3 relation and count sources
Why: Independent re-review found an unchecked extra direct source and an unfamiliar-unit count revision.

Evidence: Both counterexamples failed before Backend badf80d and passed after; prior PostgreSQL receipt belongs to 3f0141d and is preserved separately.

Impact: Advance the zero-paid Backend candidate; repeat database, browser and exact-head combination validation on this SHA.

Refs: Dev PR #512; Backend PR #193; r0.3 review findings
2026-10-13 17:43:47 +00:00
weichen c5f648d5cc Pin bounded U3 source checks and review record
Why: The third independent review found incomplete sentence, revised count and same-source scope shortcuts.

Evidence: New counterexamples failed before Backend 3f0141d and passed after; exact prior review failures and mechanisms remain recorded in Documents 53b1abd.

Impact: Advance Backend and Documents draft pins; paid model quality remains NOT_RUN.

Refs: Dev PR #512; Backend PR #193; Documents PR #95
2026-10-13 17:38:40 +00:00
weichen 884dcd8e3f Pin semantic review fixes for U3 r0.3
Why: Independent review found three unsupported-claim paths in the prior candidate.

Evidence: Each source-context, scope and unstructured-placement counterexample failed before repair; Backend full Go and selected fake-stream tests passed after.

Impact: Advance Backend 9019f90 and preserve the failed review plus exact prior combination receipt; revalidation follows on the new SHA.

Refs: Dev PR #512; Backend PR #193; r0.3 review P1 findings
2026-10-13 17:21:05 +00:00
weichen 57bcb17ea2 Merge pull request 'Archive the merged IAM integration task and preserve actual CI results' (#535) from feature/iam-i1-permission-boundaries into main
ci / svc-realcombo (push) Successful in 1m47s
ci / test (push) Failing after 4m18s
ci / test-pg (push) Successful in 7m11s
2026-10-13 17:09:27 +00:00
weichen 1ce3c68fd3 Preserve U3 r0.3 review-sync evidence
Why: The approved candidate must record the latest authoritative main before independent review.

Evidence: make task-sync exit 0 with sync_base 415f9ac; full SELF receipt imported by make evidence.

Impact: Task evidence only; source components unchanged and current-head combination remains to be run.

Refs: Dev PR #512; r0.3 evidence implementation plan Task 4
2026-10-13 17:06:48 +00:00
weichen adc1c83e5c Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=415f9ac58ece9d9b63bd9b3fea39978bb847fcce; candidate=bd33957c86405a7a7b16d33b12d7fc44f3ad4d43.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-13 17:06:07 +00:00
weichen bd33957c86 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=415f9ac58ece9d9b63bd9b3fea39978bb847fcce.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 17:05:43 +00:00
weichen 1b922ce7ed Preserve U3 r0.3 browser evidence and report
Why: The review candidate needs fixed browser results and a durable validation report.

Evidence: Tool-imported two-pass real HTTP fake-stream Playwright receipt on Dev b10a218; owned mechanism and preview processes were stopped.

Impact: Pin Documents 21fbc9d and record mechanism PASS separately from still-unrun real-model quality.

Refs: Dev PR #512; Documents PR #95
2026-10-13 17:05:24 +00:00
weichen b10a218903 Pin U3 pending-state browser fixtures
Why: The real HTTP gate now checks the host-generated pending relationship alongside source recovery and reading focus.

Evidence: Fixed Dev combination on f7e55c3 passed with imported SELF receipt; the new browser assertion failed on the old fixture, then Backend selected fake-stream tests passed.

Impact: Update test-only Backend/Frontend components and preserve the first browser RED; new exact-head browser and combination gates follow.

Refs: Dev PR #512; Backend #193; Frontend #79
2026-10-13 17:02:33 +00:00
weichen 59414e2e16 Archive the merged IAM integration task with actual gate results
ci / svc-realcombo (pull_request) Successful in 1m49s
ci / test (pull_request) Successful in 5m24s
ci / test-pg (pull_request) Successful in 7m14s
Why: Close the delivered I1 task without modifying unrelated task records or shared workspaces.

Evidence: Dev PR 534 merged after all three exact-head CI jobs passed; RDM 360/362 and Documents 98/99 actual results and independent reviews are retained.

Impact: Archive this task card and preserve original receipts only; leave all worktrees, branches, production services and later IAM increments unchanged.

Refs: Dev PR 534; policy/delivery.md task closure authorization; IAM I1.
2026-10-13 16:55:34 +00:00
weichen 28dcfcea78 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=415f9ac58ece9d9b63bd9b3fea39978bb847fcce; before_record=415f9ac58ece9d9b63bd9b3fea39978bb847fcce.

Impact: task metadata only.

Refs: .task/feature-iam-i1-permission-boundaries.md
2026-10-13 16:54:52 +00:00
weichen 415f9ac58e Merge pull request 'Adopt the reviewed IAM permission contract and merged RDM evidence' (#534) from feature/iam-i1-permission-boundaries into main
ci / svc-realcombo (push) Successful in 2m4s
ci / test (push) Failing after 3m29s
ci / test-pg (push) Successful in 7m13s
2026-10-13 16:53:16 +00:00
weichen f7e55c3a9e Fix generated evidence type export composition
Why: The first exact Dev r0.3 combination failed the Frontend unused-export ratchet despite passing runtime tests.

Evidence: The failed SELF receipt is imported into the task card; regenerated Frontend knip 51 <= 52, UI knip 61 <= 61 and component build/typechecks pass.

Impact: Pin Core, Backend, Frontend and UI corrections without changing the evidence wire shape; full Dev combination follows on this HEAD.

Refs: Dev PR #512; Core #31; Backend #193; Frontend #79; UI #51
2026-10-13 16:50:51 +00:00
weichen 6734665076 Preserve U3 r0.3 database and size evidence
Why: The zero-paid candidate needs an auditable source, database and prompt-size record before exact-head combination testing.

Evidence: Tool-imported isolated PostgreSQL and offline size receipts; Component tests are identified as local SELF in the task card.

Impact: Evidence and state text only; paid A01 remains NOT_RUN.

Refs: Dev PR #512; r0.3 evidence implementation plan Task 4
2026-10-13 16:42:13 +00:00
weichen ccbbdec74b Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 2m2s
ci / test (pull_request) Successful in 5m1s
ci / test-pg (pull_request) Successful in 8m22s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=e793e9804a1f5ecf49b29a40b4baac90ceb04e55; before_record=49dac767dcb32a21f2f9f703126c7aba09bedca8.

Impact: task metadata only.

Refs: .task/feature-iam-i1-permission-boundaries.md
2026-10-13 16:40:53 +00:00
weichen 49dac767dc Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=e793e9804a1f5ecf49b29a40b4baac90ceb04e55.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 16:40:27 +00:00
weichen 9c052a25e6 Fix the reviewed IAM integration candidate for final CI
Why: Preserve independent final review and current-source equivalence before platform admission.

Evidence: Final document and integration metadata review has zero findings; full composition test and source equivalence receipts are retained with precise SELF object boundaries.

Impact: Delivery evidence only; no production, provider, guideline or document changes from the reviewed candidate.

Refs: IAM I1 integration task; Documents 98/99; RDM 360/362.
2026-10-13 16:40:23 +00:00
weichen 4e263707b6 Pin U3 r0.3 evidence implementation components
Why: The approved r0.3 candidate now has Core evidence types, Backend normalization and matching generated frontend/UI contracts.

Evidence: Core and Backend full Go suites, selected live-tag fake-provider tests, UI 165 tests/typecheck, Frontend 265 tests/build and recursive worktree verification passed locally; final Dev combination follows on this exact commit.

Impact: Advance the five component gitlinks in the existing draft; no paid model call, merge or deployment.

Refs: Dev PR #512; Core #31; Backend #193; Frontend #79; UI #51; Documents #95
2026-10-13 16:38:04 +00:00
weichen 19b02b3cad Record merged IAM delivery and validate the final integration
Why: Preserve actual component merge results and current delivery authorization before integration CI.

Evidence: RDM PR 360 merged at exact successful CI head; new Dev make test passed and independent metadata checks preserved approved digests and pins.

Impact: Clarify historical task records and current approved repair scope; preserve documentation and delivery evidence only.

Refs: Documents PRs 98 and 99; RDM PRs 360 and 362; IAM I1 task record.
2026-10-13 16:36:35 +00:00
weichen e793e9804a Merge pull request 'Record the stage-7 acceptance verdict on the archived Dev card' (#533) from feature/rdm-increment-acceptance-note into main
ci / svc-realcombo (push) Successful in 1m53s
ci / test (push) Successful in 5m18s
ci / test-pg (push) Successful in 7m42s
2026-10-13 16:31:23 +00:00
weichen a8c42d9a59 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=1e5c6b9c10ba77ed34663fd670138621a17342bd; candidate=72d67216ef52730c17cc304f79307eed8b10c559.

Impact: task metadata only.

Refs: .task/feature-iam-i1-permission-boundaries.md
2026-10-13 16:26:32 +00:00
weichen 72d67216ef Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=1e5c6b9c10ba77ed34663fd670138621a17342bd.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 16:26:08 +00:00
weichen d26e1b0b5b Adopt the approved IAM projection contract and delivery evidence
Why: Carry the actual merged contract and approved permission implementation boundary into the integration composition.

Evidence: Documents PR 99 merged as a7ff466d9ae91fc67a53d2bf4991f47fc63a2a4c after independent review and verified source digest; RDM PR 360 preserves actual-actor projection semantics.

Impact: Update documentation pin, navigation and delivery records only; new composition tests and final-head CI remain required.

Refs: IAM I1 permission contract section 8; Documents PRs 98 and 99; RDM PR 360.
2026-10-13 16:26:05 +00:00
weichen 648d6ee12c Record the stage-7 acceptance verdict on the archived Dev card
ci / svc-realcombo (pull_request) Successful in 2m1s
ci / test (pull_request) Successful in 5m2s
ci / test-pg (pull_request) Successful in 7m29s
Why: the user confirmed acceptance in conversation on 2026-10-13; the archived
card should carry the verdict with an honest source label.

Evidence: user confirmation (conversation reply); automated ten-scenario replay
25/25 PASS rows on this card and PR #529.

Impact: archived task card note only.

Refs: task feature/rdm-increment-settings-duties (archived via #532).
2026-10-13 16:23:22 +00:00
weichen 1e5c6b9c10 Merge pull request 'Close merged task cards (feature/card-close-20261013-153026Z)' (#532) from feature/card-close-20261013-153026Z into main
ci / svc-realcombo (push) Successful in 2m4s
ci / test (push) Successful in 5m12s
ci / test-pg (push) Successful in 7m42s
2026-10-13 16:12:44 +00:00
weichen 5c3a2517bf Merge remote-tracking branch 'origin/main' into feature/card-close-20261013-153026Z
ci / svc-realcombo (pull_request) Successful in 1m50s
ci / test (pull_request) Successful in 5m6s
ci / test-pg (pull_request) Successful in 9m5s
2026-10-13 16:03:23 +00:00
weichen de1bd6807d Record U3 r0.3 approval and resolved sync evidence
Why: The user approved zero-paid implementation after the written plan review, and the first main sync required component conflict resolution.

Evidence: Tool-imported first-sync failure and resolved-sync SELF receipts; Backend full Go and Frontend test/build results are recorded as local checks.

Impact: Pin Documents approval status and preserve the exact merge/sync trail; paid A01 remains unauthorized.

Refs: Dev PR #512; Documents PR #95
2026-10-13 15:58:45 +00:00
weichen f2d863b401 Merge pull request 'Make task recovery and synchronization ready for merge queue adoption' (#519) from feature/merge-queue-policy-draft into main
ci / svc-realcombo (push) Successful in 2m0s
ci / test (push) Successful in 5m19s
ci / test-pg (push) Successful in 8m2s
2026-10-13 15:57:04 +00:00
weichen 3561abf5bd Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=5efbeebbdc09f8c2484613230a29c882c54652f0; candidate=9815e65eae141775b8ccab61be356d34550f909f.

Impact: task metadata only.

Refs: .task/feature-fast-slow-u2-u3-plan.md
2026-10-13 15:56:12 +00:00
weichen 9815e65eae Merge current main into U3 evidence implementation
Why: The approved r0.3 plan must run against the current project member and IAM mainline.

Evidence: First task-sync conflict receipt was imported; Backend full Go tests and Frontend test/build passed after resolving component interactions; git diff --cached --check passed.

Impact: Combine current main with the existing U3 draft, preserving both planning entries and the Backend private project event proof transaction.

Refs: Dev PR #512; Backend PR #193; Frontend PR #79; Documents PR #95
2026-10-13 15:55:21 +00:00
weichen 7bc5ac722c Merge remote-tracking branch 'origin/main' into feature/card-close-20261013-153026Z
ci / svc-realcombo (pull_request) Successful in 2m2s
ci / test (pull_request) Successful in 5m28s
ci / test-pg (pull_request) Successful in 8m41s
2026-10-13 15:54:16 +00:00
weichen eca92e9920 Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=5efbeebbdc09f8c2484613230a29c882c54652f0; candidate=9c139b6402697f65465001d3c4b8f703a84aa997.

Impact: task metadata only.

Refs: .task/feature-iam-i1-permission-boundaries.md
2026-10-13 15:45:12 +00:00
weichen 9c139b6402 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 15:44:46 +00:00
weichen 536f0e4b55 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 2m21s
ci / test (pull_request) Successful in 5m55s
ci / test-pg (pull_request) Successful in 9m4s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=5efbeebbdc09f8c2484613230a29c882c54652f0; before_record=6aa97d18153130c46dcbdc75a35735175cd4d1eb.

Impact: task metadata only.

Refs: .task/feature-merge-queue-policy-draft.md
2026-10-13 15:44:07 +00:00
weichen 6aa97d1815 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=5efbeebbdc09f8c2484613230a29c882c54652f0.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 15:43:41 +00:00
weichen 5efbeebbdc Merge pull request 'Close merged task cards (feature/card-close-20261013-152849Z)' (#531) from feature/card-close-20261013-152849Z into main
ci / svc-realcombo (push) Successful in 2m2s
ci / test (push) Successful in 5m26s
ci / test-pg (push) Successful in 10m24s
2026-10-13 15:43:18 +00:00
weichen f3c0551feb Adopt the reviewed IAM contract from merged Documents
Why: Record user acceptance and use the actual merged permission contract in the integration composition.

Evidence: Documents PR 98 merged as 3cf263962bd106529ee0531c8415cb16eecedfe3; independent document review and full SELF receipts retained in the task record.

Impact: Advance only Documents and delivery evidence; full IAM later increments and deployment remain outside scope.

Refs: Documents PR 98; IAM I1 U1-U2; policy/delivery.md stages 8-9.
2026-10-13 15:41:52 +00:00
weichen 70b0d3114a Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 2m2s
ci / test (pull_request) Successful in 5m31s
ci / test-pg (pull_request) Successful in 9m49s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-rdm-increment-settings-duties.md(PR#529) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-13 15:30:26 +00:00
weichen f799ee54aa Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 2m8s
ci / test (pull_request) Successful in 6m3s
ci / test-pg (pull_request) Successful in 10m35s
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-d1-closeout-evidence.md(PR#517) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-13 15:28:49 +00:00
weichen bd71a76533 Preserve U3 r0.3 plan combination evidence
ci / svc-realcombo (pull_request) Successful in 2m56s
ci / test (pull_request) Successful in 5m44s
ci / test-pg (pull_request) Successful in 9m48s
Why: The reviewable plan needs a fixed Dev combination and complete tool-written verification receipt.

Evidence: make test && make build exit 0 on Dev 73bb827; SELF receipt 02567630b483ace3feaa12e227d50de63205d76fe76e6ac266085dbda50b7535 imported by make evidence.

Impact: Task evidence only; r0.3 semantic implementation and paid quality remain NOT_RUN.

Refs: Dev PR #512; Documents PR #95
2026-10-13 15:28:23 +00:00
weichen 4292fe3c6d Record the sync checkpoint
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=5aae47ebca20ad1f3add3b080212cca7e1c6edf9; candidate=23af0398b60d8728531ce7d0841441c7ee840f83.

Impact: task metadata only.

Refs: .task/feature-iam-i1-permission-boundaries.md
2026-10-13 15:26:24 +00:00
weichen 23af0398b6 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=5aae47ebca20ad1f3add3b080212cca7e1c6edf9.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-13 15:26:00 +00:00