Why: The user explicitly accepted the fixed Backend component test candidate while cross-repository U3 acceptance remains separate.
Evidence: Stage 7 record binds approval to Backend PR #198 head 121b4d6, local SELF, independent replay and Gitea run 3174.
Impact: Backend code review may proceed; trusted tag, RDM pin, Dev combined acceptance and production operations remain pending.
Refs: IAM U3; policy/delivery.md Stage 7
Why: Stage 7 review requires a current-base sync after the final Backend evidence was recorded.
Evidence: Tool-written make task-sync receipt reports Dev sync_base e1bc260, tested_head a33cbe0, and changed=0; Backend remains 0 commits behind origin/main.
Impact: This commit adds only task-card evidence; the tested Backend, Frontend, and UI objects are unchanged.
Refs: IAM U3; policy/delivery.md Stage 7
Why: The Backend draft PR moved to a new HEAD after CI exposed a time-sensitive SSE test and the corrected candidate now has verified GATE and independent replay.
Evidence: Tool-written receipts include final SQLite and isolated PostgreSQL suites, original reviewer replay, and a Gitea run/job identity check for PR #198 at 121b4d6.
Impact: Human Stage 7 review can use fixed Backend evidence; RDM trusted pin and Dev combined acceptance remain open.
Refs: IAM U3; Backend PR #198; policy/delivery.md Stage 7
Why: The final review packet must show a clean current-base sync after the planning-status correction.
Evidence: make task-sync recorded sync_base e1bc260, tested_head b14c431, and changed=0; full output is tool-written in the task card.
Impact: Only task-card evidence changed; Backend candidate and component test objects remain fixed.
Refs: IAM U3; policy/delivery.md Stage 7
Why: The planning line lagged the final Backend SHA and completed independent replay.
Evidence: The task card now points to the fixed component and preserves the failed dirty-tree sync receipt.
Impact: Stage 7 remains pending human review; no application code or component pin changed.
Refs: IAM U3; policy/delivery.md Stage 7
Why: The Stage 7 component review needs a fresh check against the authoritative Dev target without changing the candidate.
Evidence: Tool-written make task-sync receipt records sync_base e1bc260 and changed=0; Backend branch independently contains origin/main.
Impact: Review packet reflects the latest observed base while formal RDM pins and combined CI remain pending.
Refs: IAM U3; policy/delivery.md Stage 7; policy/merge-queue.md
Why: Stage 6 approval advanced U3 to formal testing and isolated PostgreSQL exposed a migration guard regression.
Evidence: The task card contains tool-written SELF receipts for the failing and corrected Backend candidate, current SQLite and PG suites, Frontend/UI, browser, Dev governance, and an imported independent reviewer log.
Impact: Backend Stage 7 is reviewable on fixed SHA 26305ca; trusted RDM pin, combined CI, and human acceptance remain open.
Refs: IAM U3; docs/proposals/2026-10-14-iam-u3-account-contract-and-plan.md §10
Why: Stage-seven recovery initially found a stale branch; after synchronization its own evidence receipt left the task card as the sole dirty path.
Evidence: Tool-written receipts preserve the SYNC_REQUIRED and SHARED_WORKSPACE_BUSY precheck results and the successful make task-sync output at the new Dev head.
Impact: Saves only this task card and restores a clean worktree for strict resume; no formal U3 acceptance or component pin change is claimed.
Refs: U3 task card and policy/governance.md startup and recovery gate.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-plan-progress-note.md(PR#547) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.
Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.
Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.
Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pptx-register-structural-gate.md(PR#543) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-plan-progress-note.md; R0=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: task metadata only; the feature workspace starts at c8eead49c5.
Refs: .task/feature-dhf-plan-progress-note.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-card-merge-squash-detect.md(PR#544) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: The review candidate needed current-main synchronization and a fixed account of the post-sync Backend, RDM, browser and PostgreSQL verification.
Evidence: Tool-written SELF receipts preserve failed parallel PG/SSE and browser setup attempts alongside serial PG, source-overlay, frontend and fresh-browser successes at their exact objects.
Impact: Task card only; stage 6 remains for human judgment, and stage 7, trusted Backend pin, GATE, PR, merge and production operations remain pending.
Refs: Backend d2f9b16, RDM source 98f50be, Documents amendments fb3a821 and 5783940.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Backend, RDM, Documents and Dev main advanced while preparing the U3 candidate, requiring exact-source verification and a current review record.
Evidence: Tool-written SELF receipts cover synced Backend full test/build, isolated PostgreSQL serial replay, RDM source overlay full test/build, Frontend/UI checks, fresh isolated browser flow, and task-sync; failed attempts remain recorded.
Impact: Submits only a stage 6 review candidate. Formal RDM pin, independent replay/GATE, stage 7 acceptance, PR, merge, trusted tag and production work remain pending.
Refs: Backend d2f9b16, RDM source 98f50be and task branch 7b3d9eb, Documents amendments fb3a821 and 5783940.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=11aa76a3bc1c5047791f9a2de154e451634b6567.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The approved A1-A4 and delegated-actor repairs now have fixed Backend/RDM source candidates and reviewable local verification.
Evidence: The task card contains tool-written SELF receipts for exact Backend test/build, isolated PostgreSQL, RDM source overlay, Frontend/UI tests/build, browser account flows, and Dev governance.
Impact: Prepares stage 6 human review while preserving separate stage 7, trusted Backend tag, formal RDM pin, CI, PR, merge and production boundaries.
Refs: Documents U3 r1 c236d30, amendments fb3a821 and 5783940, Backend 7492fea, RDM source 98f50be.
Why: The archived card should remain accurate after its own closure PR merges.
Evidence: Only three temporal phrases changed; the card still points to PR #542 as the authoritative closure result.
Impact: Review, CI and cleanup records remain intact.
Refs: Dev PR #542