100 Commits
Author SHA1 Message Date
weichen 33d6ef6921 Merge pull request 'Close the merged pin-advance task card' (#692) from feature/card-close-20261022-055959Z into main
ci / svc-realcombo (push) Successful in 2m54s
ci / test (push) Successful in 8m45s
ci / test-pg (push) Successful in 13m1s
2026-10-22 06:13:49 +00:00
weichen a600d7abf0 Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 3m13s
ci / test (pull_request) Successful in 9m40s
ci / test-pg (pull_request) Successful in 12m59s
Why: branches merged into their immediate or root target had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: fix-rdm-pin-advance-latest.md(PR#690 into main) — merges verified via git log --merges plus Gitea API squash lookup against each card's origin target.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-22 05:59:59 +00:00
weichen 7778fdcee7 Merge pull request 'Advance the RDM pin to the current mainline head' (#690) from fix/rdm-pin-advance-latest into main
ci / svc-realcombo (push) Successful in 2m54s
ci / test (push) Successful in 9m37s
ci / test-pg (push) Successful in 14m2s
2026-10-22 05:49:16 +00:00
weichen 8b39017068 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 3m5s
ci / test (pull_request) Successful in 9m56s
ci / test-pg (pull_request) Successful in 13m58s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=b7636742fc9ea937e6030123afc608fd294861bf; before_record=d8fcc0d6f6d854fda7a92ddfdcda7d0bb8c5304a.

Impact: task metadata only.

Refs: .task/fix-rdm-pin-advance-latest.md
2026-10-22 05:34:32 +00:00
weichen d8fcc0d6f6 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=b7636742fc9ea937e6030123afc608fd294861bf.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-22 05:33:46 +00:00
weichen b7636742fc Merge pull request 'Agent stack audit remediation batch 2 (U8, U9, U11)' (#689) from feature/agent-stack-audit-remediation-b2 into main
ci / svc-realcombo (push) Successful in 3m21s
ci / test (push) Successful in 9m43s
ci / test-pg (push) Successful in 14m54s
2026-10-22 05:31:19 +00:00
weichen f2969664ef Merge authoritative main into the task branch
ci / svc-realcombo (pull_request) Successful in 3m21s
ci / test (pull_request) Successful in 9m13s
ci / test-pg (pull_request) Successful in 14m31s
Why: include the current integration baseline before merge.

Evidence: fetched origin/main=1de7c28c.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-22 05:15:53 +00:00
weichen 87db22a3f7 Record the task card for fix-rdm-pin-advance-latest
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-rdm-pin-advance-latest.md; R0=1de7c28c2122609dd9b6435881696492bd052a34.

Impact: task metadata only; the feature workspace starts at 1de7c28c21.

Refs: .task/fix-rdm-pin-advance-latest.md
2026-10-22 05:10:36 +00:00
weichen c325d85fb6 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 2m40s
ci / test (pull_request) Successful in 9m4s
ci / test-pg (pull_request) Successful in 11m59s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-agent-stack-audit-remediation-b2.md -> .task/archive/feature-agent-stack-audit-remediation-b2.md; status 已完成(合入前闭合); PR #689 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/689.
Impact: task metadata only; the card is archived within PR #689 and lands with its merge commit.
Refs: task.sh close --self
2026-10-22 05:03:17 +00:00
weichen 6b191579df Record the batch-2 review approval in the task card
ci / svc-realcombo (pull_request) Successful in 3m8s
ci / test (pull_request) Successful in 9m16s
ci / test-pg (pull_request) Successful in 11m46s
Why: independent review approved batch 2 (0 blockers, 0 majors, 5
minor follow-up notes); report committed; receipt SHAs annotated to
the final lineage per review minor 4.
Evidence: review receipt /tmp/agent-stack-b2/review-run.json
(pi-glm, success).
Impact: task metadata + review report.
Refs: PR #689
2026-10-22 04:51:05 +00:00
weichen ea099a5fbf Record batch-2 completion and the green combination run
ci / svc-realcombo (pull_request) Successful in 3m18s
ci / test (pull_request) Successful in 8m56s
ci / test-pg (pull_request) Successful in 11m59s
Why: all batch-2 units implemented, repaired and verified; full make
test green on the final pinned combination.
Evidence: verify-combo.json exit=0; component branches pushed
(native cff6935, squad 9edb6ba, backend 9b40595).
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b2
2026-10-22 04:32:50 +00:00
weichen 0b46569d85 Repin modules/backend to the nested-squad tip
Why: the backend branch tip 9b40595 additionally pins the nested
agent-squad (and its nested native) so the composed chain carries the
batch-2 event fields end to end.
Evidence: integration transport success (gitlinkb-run.json); full
make test re-run follows on this branch.
Impact: one component gitlink.
Refs: feature/agent-stack-audit-remediation-b2
2026-10-22 04:25:08 +00:00
weichen a0b8d12b43 Advance native, squad and backend pins to the batch-2 tips
Why: land U8, U9 and U11 across agent-native (cff6935), agent-squad
(9edb6ba) and modules/backend (race-repair tip) per the approved plan.
Evidence: per-unit SELF receipts under /tmp/agent-stack-b2 (all
exit=0); full make test re-run follows on this branch.
Impact: three component gitlinks.
Refs: docs/superpowers/plans/2026-10-21-agent-stack-audit-remediation-plan.md
2026-10-22 04:20:45 +00:00
weichen ef75fd7f25 Record batch-2 unit receipts so far
Why: per-unit audit trail for U8/U9/U11a/U11b/U11c including the
fail-stop redispatches and the frame-order repair.
Evidence: per-unit SELF receipts under /tmp/agent-stack-b2.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b2
2026-10-22 04:00:34 +00:00
weichen 1de7c28c21 Merge pull request 'Close the merged admit task card' (#688) from feature/card-close-20261022-022827Z into main
ci / svc-realcombo (push) Successful in 2m29s
ci / test (push) Successful in 8m41s
ci / test-pg (push) Successful in 12m2s
2026-10-22 02:40:55 +00:00
weichen 3b267dbe4d Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 2m48s
ci / test (pull_request) Successful in 9m33s
ci / test-pg (pull_request) Successful in 12m5s
Why: branches merged into their immediate or root target had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: fix-agent-exec-admit-authoritative-base.md(PR#687 into main) — merges verified via git log --merges plus Gitea API squash lookup against each card's origin target.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-22 02:28:27 +00:00
weichen dae463b75d Merge pull request 'Record the admit baseline-recognition outcome' (#687) from fix/agent-exec-admit-authoritative-base into main
ci / svc-realcombo (push) Successful in 2m19s
ci / test (push) Successful in 8m45s
ci / test-pg (push) Successful in 12m6s
2026-10-22 02:23:20 +00:00
weichen fb38fd65f8 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 2m30s
ci / test (pull_request) Successful in 8m33s
ci / test-pg (pull_request) Successful in 11m32s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=a4311c6341c318d4bbf1563b3973358326086794; before_record=f20043be5a13e53240d39557291cf19eecc84098.

Impact: task metadata only.

Refs: .task/fix-agent-exec-admit-authoritative-base.md
2026-10-22 02:10:49 +00:00
weichen f20043be5a Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=a4311c6341c318d4bbf1563b3973358326086794.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-22 02:10:05 +00:00
weichen e465b7c18f Record the admit baseline-recognition outcome on the Dev task card
ci / svc-realcombo (pull_request) Successful in 2m25s
ci / test (pull_request) Successful in 8m31s
ci / test-pg (pull_request) Successful in 9m28s
Why: this Dev branch carries only the task record; the change itself landed in
Development-Manager PR #32. Without the outcome written down the card would sit
unmerged with no explanation of why.

Evidence: Development-Manager main 2c2e372, CI green, independent review PASS;
its effect measured on RDM (65 staged paths down to 5 needing transport) and on
Dev (90-commit sync admitted with no transport).

Impact: task card only.

Refs: Development-Manager PR #32, RDM PR #460, Dev PR #682, Dev PR #684
2026-10-22 01:55:37 +00:00
weichen a4311c6341 Merge pull request 'Close the merged pin-advance task card' (#686) from feature/card-close-20261022-012859Z into main
ci / svc-realcombo (push) Successful in 2m33s
ci / test (push) Successful in 8m18s
ci / test-pg (push) Successful in 11m35s
2026-10-22 01:41:02 +00:00
weichen 6db7d37888 Close 1 merged task card(s) and archive them
ci / svc-realcombo (pull_request) Successful in 2m26s
ci / test (pull_request) Successful in 8m9s
ci / test-pg (pull_request) Successful in 11m8s
Why: branches merged into their immediate or root target had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: fix-pal-component-delivery-pins.md(PR#682 into main) — merges verified via git log --merges plus Gitea API squash lookup against each card's origin target.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
2026-10-22 01:28:59 +00:00
weichen 5f09af2d58 Fill in the batch-2 card and record the pin restoration
Why: carry authorization, the discovered composition regression
(#682 reset batch-1 pins) and its restoration, plus the wave plan.
Evidence: restoration transport success (pinrestore-run.json).
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b2
2026-10-22 01:17:56 +00:00
weichen 646a219116 Restore the batch-1 component pins lost to the parallel pin merge
Why: PR #682 (f23f5bb0) merged a stale branch whose tree carried
pre-batch component pins, silently reverting the batch-1 composition
on main; batch 2 (U8/U9/U11) is defined on top of batch 1.
Evidence: restoration transport success (pinrestore-run.json); batch-1
tips pushed on all five component origins.
Impact: five component gitlinks restored to the audited batch-1 tips.
Refs: feature/agent-stack-audit-remediation-b2
2026-10-22 01:16:57 +00:00
weichen 387723b1a4 Record the task card for feature-agent-stack-audit-remediation-b2
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-agent-stack-audit-remediation-b2.md; R0=f23f5bb01a8b96ab90686d3a1b07791d7f473de2.

Impact: task metadata only; the feature workspace starts at f23f5bb01a.

Refs: .task/feature-agent-stack-audit-remediation-b2.md
2026-10-22 01:10:03 +00:00
weichen f23f5bb01a Merge pull request 'Advance the RDM artifact pin so the delivered lifecycle work actually ships' (#682) from fix/pal-component-delivery-pins into main
ci / svc-realcombo (push) Successful in 2m37s
ci / test (push) Successful in 7m47s
ci / test-pg (push) Successful in 10m23s
2026-10-22 01:06:15 +00:00
weichen 04d70629d6 Merge authoritative main into the pin advance
ci / svc-realcombo (pull_request) Successful in 2m13s
ci / test (pull_request) Successful in 7m44s
ci / test-pg (pull_request) Successful in 10m8s
Why: the RDM materialization fix landed separately as PR #684, so this branch
now takes main's version of the workflow and carries only the pin change. The
conflict resolution keeps the fix (submodule update per pin, language-agnostic
fail-loud assertion) and drops the pin-specific comment that described a
first-parent distance belonging to the other pull request.

Impact: workflow resolves to main's already-merged content; this commit's own
contribution is the rdm.pin prev_sha correction.

Refs: PR #682, PR #684
2026-10-22 00:55:11 +00:00
weichen 485ebd792b Merge pull request 'Agent stack audit remediation batch 1 (U1-U7, U10)' (#685) from feature/agent-stack-audit-remediation-b1 into main
ci / svc-realcombo (push) Successful in 2m6s
ci / test (push) Successful in 7m38s
ci / test-pg (push) Successful in 8m51s
2026-10-21 19:52:33 +00:00
weichen 18425f350a Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 2m3s
ci / test (pull_request) Successful in 7m38s
ci / test-pg (pull_request) Successful in 9m19s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-agent-stack-audit-remediation-b1.md -> .task/archive/feature-agent-stack-audit-remediation-b1.md; status 已完成(合入前闭合); PR #685 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/685.
Impact: task metadata only; the card is archived within PR #685 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 19:42:46 +00:00
weichen e08c497f39 Record the review verdict and the CI checkout fix in the card
ci / svc-realcombo (pull_request) Successful in 2m4s
ci / test (pull_request) Successful in 7m37s
ci / test-pg (pull_request) Successful in 8m44s
Why: the independent review approved batch 1 (APPROVE, 0 blockers);
the first CI run failed at checkout because the five pinned component
commits were local-only and are now pushed.
Evidence: review4-run.json (pi-glm success); component remote refs
created; this commit retriggers CI.
Impact: task metadata only.
Refs: PR #685
2026-10-21 19:33:27 +00:00
weichen f23d1df72a Record the independent review approval in the task card
ci / svc-realcombo (pull_request) Failing after 3s
ci / test (pull_request) Failing after 3s
ci / test-pg (pull_request) Failing after 3s
Why: batch-1 review verdict APPROVE (0 blockers, 0 majors, 5 minor
follow-up notes) from an independent CLI session; report committed.
Evidence: review receipt /tmp/agent-stack-b1/review4-run.json
(pi-glm, success).
Impact: task metadata + review report.
Refs: PR #685
2026-10-21 19:32:27 +00:00
weichen d55e57dded Merge authoritative main into the task branch
ci / test (pull_request) Failing after 3s
ci / svc-realcombo (pull_request) Failing after 3s
ci / test-pg (pull_request) Failing after 3s
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=b25846d2.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 18:30:17 +00:00
weichen 0967b94930 Repin modules/backend to the merged upstream tip
Why: backend main advanced to 528e3a4 (surface conversation required,
card backfills); the backend task branch merges it into the batch-1
line and the Dev pin follows.
Evidence: integration transport success (gitlink5-run.json); backend
build green on the merge; full make test re-run follows.
Impact: one component gitlink.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 18:30:12 +00:00
weichen f11278f0dd Record the repair receipts and the green combination run
Why: close out the batch-1 audit trail before review and PR.
Evidence: make test exit=0 on the fully repinned combination
(verify-combo-make-test4.json).
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 18:23:59 +00:00
weichen 647fa51cd2 Repin squad and backend to the sqlite-test-aligned tips
Why: the U3B sqlite repair advanced the squad container to 0f1daa8 and
backend's nested-squad pin follow-up moved backend to 1f61131.
Evidence: integration transport success (gitlink4-run.json); full
make test re-run follows on this branch.
Impact: two component gitlinks.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 18:16:54 +00:00
weichen d86eee91b1 Repin native, squad and backend to the nested-pin-consistent tips
Why: check-pins requires each container's nested gitlinks to equal the
Dev top-level pins; the batch-1 bumps left native/squad/backend
containers pinned at pre-batch sibling versions.
Evidence: integration transport success (gitlink3-run.json); full
make test re-run follows on this branch.
Impact: three component gitlinks.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 17:49:15 +00:00
weichen d31c7b5569 Repin modules/backend to the intent boundary repair
Why: the backend branch advanced to 49c1259 with the U6 boundary
repair (admission test reworked behind intentgate helpers).
Evidence: repair receipt success; verify-u6r2 exit=0; combination
make test re-run follows on this branch.
Impact: one component gitlink.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 17:37:59 +00:00
weichen 76766356ae Advance component pins to the audited remediation batch 1
Why: land U1-U7 and U10 across agent-native (5c0d2d8), agent-squad
(23f161b), agent-intent (765a7e7), agent-command (fe7987d) and
modules/backend (4030449) per the approved remediation plan.
Evidence: per-unit SELF receipts under /tmp/agent-stack-b1 all exit=0;
combination verification (make test) recorded next on this branch.
Impact: five component gitlinks; no other Dev paths.
Refs: docs/superpowers/plans/2026-10-21-agent-stack-audit-remediation-plan.md
2026-10-21 17:27:22 +00:00
weichen 4291289f82 Record U3B completion in the task card
Why: all ten batch-1 units implemented and individually verified.
Evidence: verify-u3b exit=0 (race).
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 17:24:33 +00:00
weichen 6f1f71edc2 Record U7B receipt and the U3B candidate outages
Why: keep the per-unit audit trail current; cursor and antigravity
prove broken (quota/model-rejection, 400 location block), routing
adjusted with recorded reasons.
Evidence: verify-u7b exit=0.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 16:55:48 +00:00
weichen 659de0fd52 Record U6 receipt, nested pin bump, U3B fail-stop and redispatch
Why: keep the per-unit audit trail current.
Evidence: verify-u6 exit=0; U3B first run failed-unknown on a
pre-session cursor TLS failure (553B log, zero changes, workspace
preserved), reconciled as environmental and re-dispatched.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 16:35:29 +00:00
weichen a73a3742b2 Record U10 redo/U3a receipts and U6/U3B dispatch
Why: keep the per-unit audit trail current.
Evidence: verify-u10b/verify-u3a exit=0.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 16:16:33 +00:00
weichen 2b9c1fb6a2 Record U2/U4 receipts and the U10 fail-stop in the task card
Why: keep the per-unit audit trail; U10 first run failed-unknown
(pi attempt exited 0 without a decodable terminal record), workspace
preserved for reconciliation and the unit re-dispatched with a corrected
packet (nested deps gitlinks materialized).
Evidence: verify-u2/u4/u4b exit=0; no code change.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 16:04:39 +00:00
weichen b25846d25b Merge pull request 'Materialize each pinned RDM artifact with its own submodules and refuse to build a stale one' (#684) from fix/ci-rdm-pin-materialization into main
ci / svc-realcombo (push) Successful in 2m50s
ci / test (push) Successful in 8m18s
ci / test-pg (push) Successful in 10m37s
2026-10-21 15:52:46 +00:00
weichen 9026a308c1 Record wave A unit receipts in the task card
Why: track per-unit agent-per-unit receipts and verification for U1/U5/U7a.
Evidence: receipts under /tmp/agent-stack-b1; SELF verification exit=0.
Impact: task metadata only.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 15:42:24 +00:00
weichen 10b253c356 Merge authoritative main into the task branch
ci / svc-realcombo (pull_request) Successful in 2m34s
ci / test (pull_request) Successful in 8m18s
ci / test-pg (pull_request) Successful in 9m44s
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=5a907f42944af56dbca68b6a058cc4f0bc2681d7.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 15:40:58 +00:00
weichen 5a907f4294 Merge pull request 'Remember super-admin envfile path and require surface conversation' (#683) from fix/svc-superadmin-envfile-surface-conv into main
ci / svc-realcombo (push) Successful in 4m21s
ci / test (push) Successful in 9m0s
ci / test-pg (push) Successful in 12m14s
2026-10-21 15:29:23 +00:00
weichen ec112b2dbe Record the remediation batch-1 task card
Why: carry authorization, scope, wave plan and receipt tables for the
agent-per-unit implementation of U1-U7 and U10.
Evidence: card + receipts under /tmp; no code change.
Impact: task metadata only (exempt path).
Refs: docs/superpowers/plans/2026-10-21-agent-stack-audit-remediation-plan.md
2026-10-21 15:24:44 +00:00
weichen d3161347a3 Add the agent stack audit remediation plan
Why: record the audited findings and the batched remediation contract
(U1-U11) that subsequent implementation units must satisfy.
Evidence: document-only change; no code paths touched.
Impact: docs only; plan is the scope authority for the remediation task.
Refs: feature/agent-stack-audit-remediation-b1
2026-10-21 15:17:53 +00:00
weichen 7e8dd500c4 Record the task card for feature-agent-stack-audit-remediation-b1
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-agent-stack-audit-remediation-b1.md; R0=d9e9c0560a2767539f4415b579adbeff86a22ba6.

Impact: task metadata only; the feature workspace starts at d9e9c0560a.

Refs: .task/feature-agent-stack-audit-remediation-b1.md
2026-10-21 15:17:41 +00:00
weichen b3af918cb2 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 3m59s
ci / test (pull_request) Successful in 10m36s
ci / test-pg (pull_request) Successful in 14m55s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/fix-svc-superadmin-envfile-surface-conv.md -> .task/archive/fix-svc-superadmin-envfile-surface-conv.md; status 已完成(合入前闭合); PR #683 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/683.
Impact: task metadata only; the card is archived within PR #683 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 15:13:48 +00:00
weichenandCursor 965f520ee7 Record results, review and pin receipts on the task card
ci / svc-realcombo (pull_request) Successful in 4m36s
ci / test (pull_request) Successful in 9m59s
ci / test-pg (pull_request) Successful in 14m6s
Why: the card must carry results, evidence and the authorized rerun receipts before closing.
Evidence: make evidence for svc unittest suite (51 OK, 1 skipped) on HEAD 3c0faf76.
Impact: task card only.
Refs: fix/svc-superadmin-envfile-surface-conv.
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 15:13:47 +00:00
weichen 053b1719f1 Record that the CI materialization fix worked and the failure moved
ci / svc-realcombo (pull_request) Successful in 2m40s
ci / test (pull_request) Successful in 8m40s
ci / test-pg (pull_request) Failing after 12m6s
Why: the pin materialization fix did its job - all three pins now build and the
missing-go.sum error is gone - so the failure relocated to the real combination
lifecycle gate, where svc.sh cannot git fetch from CI's shallow RDM clone.
That is a different component's concern and outside this pin advance.

Evidence: run 4714 job 7830 - svc-realcombo and test green; three lifecycle
cases fail on svc.sh's git fetch against the shallow RDM source clone.

Impact: task card only.

Refs: PR #682
2026-10-21 15:06:07 +00:00
weichenandCursor 0194c5d847 Record goals and agent receipts on the svc/surface followups card
Why: the card must state authorization, goals and unit receipts including the failed-unknown and authorized Backend rerun.
Evidence: agent-exec receipts under /tmp/svc-sa-surface-20261021.
Impact: task card only.
Refs: fix/svc-superadmin-envfile-surface-conv.
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 15:05:22 +00:00
weichen 64baa87633 Record the pins-layout change behind the test-pg failure
ci / svc-realcombo (pull_request) Successful in 3m54s
ci / test-pg (pull_request) Failing after 5m12s
ci / test (pull_request) Successful in 9m27s
Why: the fail-loud assertion worked as intended and named the real cause -
RDM's pins set grew from four to six, so the CI step that checks out and builds
all three pins no longer sees a consistent layout. My prev_sha choice was
wrong and I did not check layout consistency when writing the unit.

Evidence: run 4711 job 7821 - 'rdm pin c6304224 的 pins/agent-system-frontend
未落地:缺少 go.mod'; pin layouts verified across all five commits; local
build-product.sh on the delivered head succeeds.

Impact: task card only.

Refs: PR #682
2026-10-21 14:36:50 +00:00
weichen 1e4ac44439 Record the test-pg composition failure blocking the pin advance
ci / svc-realcombo (pull_request) Successful in 4m16s
ci / test-pg (pull_request) Failing after 6m30s
ci / test (pull_request) Successful in 8m41s
Why: advancing the RDM pin red-lights test-pg on a real composition problem
that make test cannot see, and the card must say so plainly instead of showing
a green combination run.

Evidence: run 4707 job 7812 — the combination build reports missing go.sum
entries for agent-document-renderer packages. RDM bc8db88 replaces that module
with a local path and therefore carries no go.sum entries for it, while the
Dev-side build redirects the backend replace to modules/backend (f084d10),
which imports those packages directly.

Impact: task card only.

Refs: PR #682
2026-10-21 14:10:46 +00:00
weichen ddbf9aec90 Record the task card for fix-svc-superadmin-envfile-surface-conv
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-svc-superadmin-envfile-surface-conv.md; R0=d9e9c0560a2767539f4415b579adbeff86a22ba6.

Impact: task metadata only; the feature workspace starts at d9e9c0560a.

Refs: .task/fix-svc-superadmin-envfile-surface-conv.md
2026-10-21 14:04:07 +00:00
weichen d9e9c0560a Merge pull request 'Report the real identity marker in svc adopt and the deploy gate' (#681) from fix/genui-prod-upgrade-followups into main
ci / svc-realcombo (push) Successful in 4m5s
ci / test (push) Successful in 8m35s
ci / test-pg (push) Successful in 13m30s
2026-10-21 14:00:56 +00:00
weichen 98d794ee7f Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 4m7s
ci / test-pg (pull_request) Failing after 5m27s
ci / test (pull_request) Successful in 9m49s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=a736d5a420370cff052bd946f6d6397d4c354547; before_record=e8dbbe001ae12048217c0a763ab7699d183f5b1f.

Impact: task metadata only.

Refs: .task/fix-pal-component-delivery-pins.md
2026-10-21 13:57:35 +00:00
weichen e8dbbe001a Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=a736d5a420370cff052bd946f6d6397d4c354547.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 13:56:55 +00:00
weichen 4188f847f7 Correct the delivery-gap claims to match what is actually verifiable
Why: an independent review caught that the card asserted the two delivery
branches were red at their tips as a verified conclusion, and that the figures
I quoted matched no natural measurement. Both are session-local observations,
not evidence this repo can reproduce.

Evidence: the card now separates a checkable claim (Dev's gates never exercise
the delivery branches) from a SELF observation with the exact commits and
method, marks it as not admissible as GATE evidence, and voids the imprecise
numbers from commit 537bf66.

Impact: task card only.

Refs: RDM PR #460, Development-Manager PR #32
2026-10-21 13:56:52 +00:00
weichen dcbf953c16 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 4m13s
ci / test (pull_request) Successful in 10m58s
ci / test-pg (pull_request) Successful in 12m34s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=a736d5a420370cff052bd946f6d6397d4c354547; before_record=62ba1a225fcf1938ee97af2e08e1dbeca142fe97.

Impact: task metadata only.

Refs: .task/archive/fix-genui-prod-upgrade-followups.md
2026-10-21 13:40:41 +00:00
weichen 62ba1a225f Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=a736d5a420370cff052bd946f6d6397d4c354547.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 13:39:48 +00:00
weichen e9ea882ffe Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 4m7s
ci / test (pull_request) Successful in 11m55s
ci / test-pg (pull_request) Successful in 14m29s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/fix-genui-prod-upgrade-followups.md -> .task/archive/fix-genui-prod-upgrade-followups.md; status 已完成(合入前闭合); PR #681 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/681.
Impact: task metadata only; the card is archived within PR #681 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 13:39:41 +00:00
weichenandCursor f18d17e3b6 Record results and review on the followups task card
ci / svc-realcombo (pull_request) Successful in 3m31s
ci / test (pull_request) Successful in 10m28s
ci / test-pg (pull_request) Successful in 14m0s
Why: the card must carry results, evidence and review before closing.
Evidence: make evidence entry for tests.test_svc_identity (31 OK, 1 skipped).
Impact: task card only.
Refs: fix/genui-prod-upgrade-followups.
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 13:39:31 +00:00
weichenandCursor 2065738dd2 Record goals and agent receipts on the followups task card
Why: the card must state authorization, goals and unit receipts.
Evidence: agent-exec receipts under /tmp/genui-followups-20261021.
Impact: task card only.
Refs: fix/genui-prod-upgrade-followups.
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 13:37:38 +00:00
weichen a736d5a420 Merge pull request 'Backfill the merge record of the archived svc-db-config-recover card' (#680) from fix/svc-db-card-merge-backfill into main
ci / svc-realcombo (push) Successful in 3m8s
ci / test (push) Successful in 10m25s
ci / test-pg (push) Successful in 11m48s
2026-10-21 13:34:13 +00:00
weichen 0ce8d33875 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=ccb6dfaa9cdf7e69eb15d7df024dee55f37b8df1; before_record=2af80d6a24bcde0a6da1f091acdb25c7e1e9a1f4.

Impact: task metadata only.

Refs: .task/fix-pal-component-delivery-pins.md
2026-10-21 13:32:30 +00:00
weichen 8c8cda03cf Record the task card for fix-genui-prod-upgrade-followups
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-genui-prod-upgrade-followups.md; R0=ccb6dfaa9cdf7e69eb15d7df024dee55f37b8df1.

Impact: task metadata only; the feature workspace starts at ccb6dfaa9c.

Refs: .task/fix-genui-prod-upgrade-followups.md
2026-10-21 13:32:20 +00:00
weichen 2af80d6a24 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=ccb6dfaa9cdf7e69eb15d7df024dee55f37b8df1.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 13:31:46 +00:00
weichen 537bf660e3 Record the component delivery outcome and the governance fix
Why: both components have landed, the delivery branch red-at-tip finding and
the six authorization defects it exposed are the substantive result, and the
admit baseline-recognition change is what unblocked the merge at all. None of
that was recorded.

Evidence: Backend 7158bea (Dev pin f084d10 already contains it); RDM bc8db88
via PR #460, five review rounds ending PASS, CI green; Development-Manager
2c2e372 via PR #32.

Impact: task card only.

Refs: Backend PR #234, RDM PR #460, Development-Manager PR #32, Dev PR #634
2026-10-21 13:27:33 +00:00
weichen 6ec2de1010 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 3m23s
ci / test (pull_request) Successful in 9m34s
ci / test-pg (pull_request) Successful in 11m18s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=ccb6dfaa9cdf7e69eb15d7df024dee55f37b8df1; before_record=588e77d1d8a0f1bd0e15afc4204b1885084ba067.

Impact: task metadata only.

Refs: .task/archive/fix-svc-db-card-merge-backfill.md
2026-10-21 13:22:00 +00:00
weichen 588e77d1d8 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=ccb6dfaa9cdf7e69eb15d7df024dee55f37b8df1.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 13:21:17 +00:00
weichen ccb6dfaa9c Merge pull request 'Pin Documents to the GenUI prod upgrade record' (#679) from feature/genui-prod-upgrade-docsync into main
ci / svc-realcombo (push) Successful in 2m52s
ci / test (push) Successful in 9m21s
ci / test-pg (push) Successful in 13m31s
2026-10-21 13:18:36 +00:00
weichen f7a0516943 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 5m24s
ci / test (pull_request) Successful in 12m24s
ci / test-pg (pull_request) Successful in 14m25s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/fix-svc-db-card-merge-backfill.md -> .task/archive/fix-svc-db-card-merge-backfill.md; status 已完成(合入前闭合); PR #680 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/680.
Impact: task metadata only; the card is archived within PR #680 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 13:01:58 +00:00
weichen 1b0b6bfcdc Backfill the merge record of the archived svc-db-config-recover card
ci / svc-realcombo (pull_request) Successful in 4m9s
ci / test (pull_request) Successful in 12m25s
ci / test-pg (pull_request) Successful in 16m5s
Why: the card in main still reads "待定 / 未评审 / NOT_RUN" even though its
PR #342 merged on 2026-10-11. The backfill text was written on
feature/svc-db-record-backfill but never landed, leaving that branch as an
orphan with its only unmerged content being this bookkeeping.

Evidence:
  Gitea API (re-checked today): PR #342 merged=true, merge commit
  452f00e6d9, which is an ancestor of
  origin/main; PR #346 closed-unmerged, PR #347 merged — both consistent
  with the backfill text.
  Triage receipt /tmp/triage-svcdb-cardbackfill-20261021.json (NEW).
  The "CI test/test-pg 双 success" statement is carried over from the
  task's own record; that run is outside the API's recent-60 window and was
  not re-verified today.

Impact: 4 bookkeeping fields in one archived card. No code change.
Refs: PR #681; fix/svc-db-card-merge-backfill
2026-10-21 13:01:51 +00:00
weichen 37c6e0a883 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 4m32s
ci / test (pull_request) Successful in 11m4s
ci / test-pg (pull_request) Successful in 16m42s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-genui-prod-upgrade-docsync.md -> .task/archive/feature-genui-prod-upgrade-docsync.md; status 已完成(合入前闭合); PR #679 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/679.
Impact: task metadata only; the card is archived within PR #679 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 13:01:30 +00:00
weichenandCursor 8dc8edf3a8 Record the prod upgrade facts and receipts on the task card
ci / svc-realcombo (pull_request) Successful in 4m51s
ci / test (pull_request) Successful in 11m15s
ci / test-pg (pull_request) Successful in 16m31s
Why: The card must carry the authorization, the out-of-repo upgrade steps,
the verification results and the agent-exec receipts for both units.
Evidence: Receipts /tmp/genui-prod-upgrade-doc/{docs,dev}-run.json;
Documents #119 CI success at 518e381.
Impact: Task card only.
Refs: Documents #119

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 13:01:19 +00:00
weichen 4f7098cfcd Record the task card for fix-svc-db-card-merge-backfill
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-svc-db-card-merge-backfill.md; R0=e634608d97333354c3ead85d47c9e9e368a992a0.

Impact: task metadata only; the feature workspace starts at e634608d97.

Refs: .task/fix-svc-db-card-merge-backfill.md
2026-10-21 13:01:17 +00:00
weichen b542b99496 Record the task card for feature-genui-prod-upgrade-docsync
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-genui-prod-upgrade-docsync.md; R0=e634608d97333354c3ead85d47c9e9e368a992a0.

Impact: task metadata only; the feature workspace starts at e634608d97.

Refs: .task/feature-genui-prod-upgrade-docsync.md
2026-10-21 12:44:14 +00:00
weichen e634608d97 Merge pull request 'Make U7 two-instance acceptance failures point at the real cause' (#678) from fix/multi-instance-test-failure-diagnostics into main
ci / svc-realcombo (push) Successful in 3m42s
ci / test (push) Successful in 10m47s
ci / test-pg (push) Successful in 12m48s
2026-10-21 12:39:17 +00:00
weichen 864ab3135b Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 3m21s
ci / test (pull_request) Successful in 8m52s
ci / test-pg (pull_request) Successful in 10m46s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/fix-multi-instance-test-failure-diagnostics.md -> .task/archive/fix-multi-instance-test-failure-diagnostics.md; status 已完成(合入前闭合); PR #678 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/678.
Impact: task metadata only; the card is archived within PR #678 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 12:27:51 +00:00
weichen d8988ad13a Record diagnostics scope, review PASS and PG-backed verification
ci / svc-realcombo (pull_request) Successful in 3m11s
ci / test (pull_request) Successful in 9m26s
ci / test-pg (pull_request) Successful in 10m0s
Why: the test-hygiene change needs its scope, the review verdict and the
real-PostgreSQL evidence recorded before delivery.

Evidence:
  /tmp/mi-diag-impl-r1-20261021.json: cursor, success (single file)
  /tmp/mi-diag-review-r1-20261021.json: pi-glm, success (PASS, 6 non-blocking)
  Real-PG runs: idle 15.1s and 96-load 17.4s, both ok (fsync=on cluster
  on 127.0.0.1:54331); the Backend fix is already in main via PR #237/#674.

Impact: card metadata only; no behaviour change.
Refs: PR #679; fix/multi-instance-test-failure-diagnostics
2026-10-21 12:27:23 +00:00
weichen fd3ccd08fc Record the task card for fix-multi-instance-test-failure-diagnostics
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-multi-instance-test-failure-diagnostics.md; R0=5360884e9283d962caf945d944df05b5e5059177.

Impact: task metadata only; the feature workspace starts at 5360884e92.

Refs: .task/fix-multi-instance-test-failure-diagnostics.md
2026-10-21 12:07:32 +00:00
weichen 5360884e92 Merge pull request 'Pin Documents to the GenUI prod deploy entry sync' (#677) from feature/genui-prod-ops-docsync into main
ci / svc-realcombo (push) Successful in 2m47s
ci / test (push) Successful in 8m12s
ci / test-pg (push) Successful in 9m24s
2026-10-21 11:59:54 +00:00
weichen 27d546f0fb Record the task card for fix-agent-exec-admit-authoritative-base
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-agent-exec-admit-authoritative-base.md; R0=096b74b4775e81cfb2864f98cae2e9fc9d9c1a44.

Impact: task metadata only; the feature workspace starts at 096b74b477.

Refs: .task/fix-agent-exec-admit-authoritative-base.md
2026-10-21 11:41:20 +00:00
weichen 37709d39c4 Record the sync checkpoint
ci / svc-realcombo (pull_request) Successful in 2m57s
ci / test (pull_request) Successful in 8m18s
ci / test-pg (pull_request) Successful in 10m33s
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=096b74b4775e81cfb2864f98cae2e9fc9d9c1a44; before_record=da2492de25ad6dcbf265a55a4246f088642489cf.

Impact: task metadata only.

Refs: .task/archive/feature-genui-prod-ops-docsync.md
2026-10-21 11:40:43 +00:00
weichen da2492de25 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=096b74b4775e81cfb2864f98cae2e9fc9d9c1a44.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 11:40:01 +00:00
weichen 096b74b477 Merge pull request 'Drop remaining hardcoded test ports in favor of free_test_port()' (#676) from fix/remaining-hardcoded-ports into main
ci / svc-realcombo (push) Successful in 3m23s
ci / test (push) Successful in 8m56s
ci / test-pg (push) Successful in 10m33s
2026-10-21 11:04:28 +00:00
weichen 25752b739b Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 4m3s
ci / test (pull_request) Successful in 10m27s
ci / test-pg (pull_request) Successful in 12m34s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-genui-prod-ops-docsync.md -> .task/archive/feature-genui-prod-ops-docsync.md; status 已完成(合入前闭合); PR #677 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/677.
Impact: task metadata only; the card is archived within PR #677 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 10:58:09 +00:00
weichen 30af1b9749 Record scope and receipts on the genui prod ops docsync card
ci / svc-realcombo (pull_request) Successful in 3m57s
ci / test (pull_request) Successful in 10m41s
ci / test-pg (pull_request) Successful in 12m45s
Why: The card must carry the delivery scope, the out-of-repo ops facts and
the agent-exec receipts for both units.
Evidence: Receipts /tmp/genui-prod-docsync/{docs,dev}-run.json; Documents
#118 CI success at 244477e.
Impact: Task card only.
Refs: Documents #118
2026-10-21 10:57:54 +00:00
weichen c89a894530 Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 2m55s
ci / test (pull_request) Successful in 9m11s
ci / test-pg (pull_request) Successful in 11m25s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/fix-remaining-hardcoded-ports.md -> .task/archive/fix-remaining-hardcoded-ports.md; status 已完成(合入前闭合); PR #676 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/676.
Impact: task metadata only; the card is archived within PR #676 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 10:52:33 +00:00
weichen 06e3f1bca4 Record scope, review PASS and verification for the port allocator
ci / svc-realcombo (pull_request) Successful in 2m43s
ci / test (pull_request) Successful in 9m15s
ci / test-pg (pull_request) Successful in 12m6s
Why: the card must carry the helper's design boundary, the (r1 scope-expansion
-> granted expansion -> r2 success) trajectory, the independent review verdict
and the runtime evidence before delivery.

Evidence:
  /tmp/ports-load-20261021.json: helper test under 64-load OK
  /tmp/ports-svc-tests-20261021.json: tests.test_svc 23 OK
  /tmp/ports-governance-20261021.json: 527 OK (18 skipped)
  /tmp/remaining-ports-impl-r2-20261021.json: cursor, success
  /tmp/remaining-ports-review-r1-20261021.json: pi-glm, PASS

Impact: card metadata only.
Refs: PR #676; fix/remaining-hardcoded-ports
2026-10-21 10:52:28 +00:00
weichen 9c66d0d12c Record the task card for feature-genui-prod-ops-docsync
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-genui-prod-ops-docsync.md; R0=444fb1dee2a72452be23b97cbaaad9e28c42dffd.

Impact: task metadata only; the feature workspace starts at 444fb1dee2.

Refs: .task/feature-genui-prod-ops-docsync.md
2026-10-21 10:27:03 +00:00
weichen 88aa4b6b7d Record the task card for fix-remaining-hardcoded-ports
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-remaining-hardcoded-ports.md; R0=444fb1dee2a72452be23b97cbaaad9e28c42dffd.

Impact: task metadata only; the feature workspace starts at 444fb1dee2.

Refs: .task/fix-remaining-hardcoded-ports.md
2026-10-21 10:19:04 +00:00
weichen 444fb1dee2 Merge pull request 'Use a kernel-assigned port in the static deploy test instead of a hardcoded one' (#668) from fix/svc-static-deploy-test-port-flake into main
ci / svc-realcombo (push) Successful in 3m2s
ci / test (push) Successful in 8m23s
ci / test-pg (push) Successful in 9m44s
2026-10-21 10:14:53 +00:00
weichen ee54b3577a Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 2m58s
ci / test (pull_request) Successful in 9m28s
ci / test-pg (pull_request) Successful in 11m22s
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/fix-svc-static-deploy-test-port-flake.md -> .task/archive/fix-svc-static-deploy-test-port-flake.md; status 已完成(合入前闭合); PR #668 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/668.
Impact: task metadata only; the card is archived within PR #668 and lands with its merge commit.
Refs: task.sh close --self
2026-10-21 10:02:58 +00:00
weichen e0a8773a85 Unblock and refresh card: status, review re-attest, CI resolution
ci / svc-realcombo (pull_request) Successful in 3m3s
ci / test (pull_request) Successful in 9m31s
ci / test-pg (pull_request) Successful in 11m37s
Why: the previous "blocked" reason (CI infrastructure failures) was
externally resolved by the Backend ResolveHITL fix (PR #237) and its
Dev gitlink repin (PR #674 -> 2fd11eff). Re-review against the
post-Repin baseline PASSes; the card needed to reflect that.

Evidence:
  /tmp/svc-flake-sync-20261021.json: sync to 2fd11eff
  /tmp/svc-flake-finish-test-20261021.json: target test green
  /tmp/svc-flake-svc-tests-20261021.json: 213 svc tests OK (18 skipped)
  /tmp/svc-flake-review-r1-20261021.json: pi-glm, success (review PASS)
  /tmp/multi-instance-with-be-fix-20261021.json: root-cause fix
  /tmp/repin-maketest5-20261021.json: Dev make test green post-Repin

Impact: card metadata only; no behaviour change.
Refs: PR #668; fix/svc-static-deploy-test-port-flake
2026-10-21 10:02:53 +00:00
weichen 2841cb4a43 Record the sync checkpoint
Why: bind the task validation checkpoint to the integration baseline.

Evidence: SELF recursive component checks; sync_base=2fd11effd9ccb0ae35ae5a47caccefccbbb05a8e; before_record=c766a81277112907333ac7f1810436aed51cff21.

Impact: task metadata only.

Refs: .task/fix-svc-static-deploy-test-port-flake.md
2026-10-21 09:48:46 +00:00
weichen c766a81277 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=2fd11effd9ccb0ae35ae5a47caccefccbbb05a8e.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-21 09:48:06 +00:00